Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 132, Issue 6

Abstract

Repetitive scheduling methods are more effective than traditional critical path methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. In this research a non-unit-based algorithm for the planning and scheduling of repetitive projects is developed. Instead of repetitive production units, repetitive or similar activity groups are identified and employed for scheduling. The algorithm takes into consideration: (1) the logical relationship of activity groups in a repetitive project; (2) the usage of various resource crews in an activity group; (3) the maintaining of resource continuity; and (4) the time and cost for the routing of resource crews. A sample case study and a case study of a sewer system project are conducted to validate the algorithm, as well as to demonstrate its application. Results and findings are reported.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This research is partially supported by The National Science Council (NSC) of the Republic of China, Grant No. UNSPECIFIEDNSC 90-2211-E008-058. The writers wish to express their gratitude for this support.

References

Arditi, D., and Albulak, M. Zeki (1986). “Line-of-balance scheduling of pavement construction.” J. Constr. Eng. Manage., 112(3), 411–424.
Carr, R. I., and Mayer, W. L. (1974). “Planning construction of repetitive building units.” J. Constr. Div., Am. Soc. Civ. Eng., 100(3), 403–412.
Chrzanowski, E. N., and Johnston, D. W. (1986). “Application of linear scheduling.” J. Constr. Eng. Manage., 112(4), 476–491.
El-Rayes, K., and Moselhi, S. (1998). “Resource-driven scheduling of repetitive activities.” Constr. Manage. Econom., 16, 433–446.
Hamelink, D. J., and Rowings, J. E. (1998). “Linear scheduling model: Development of controlling activity path.” J. Constr. Eng. Manage., 124(4), 263–268.
Harris, R. B., and Ioannou, P. G. (1998). “Scheduling projects with repeating activities.” J. Constr. Eng. Manage., 124(4), 269–278.
Hegazy, T., and Wassef, N. (2001). “Cost optimization in projects with repetitive nonserial activities.” J. Constr. Eng. Manage., 127(3), 183–191.
Johnston, D. W. (1981). “Linear scheduling method for highway construction.” J. Constr. Div., Am. Soc. Civ. Eng., 107(2), 247–261.
O’Brien, J. J. (1975). “VPM scheduling for high-rise buildings.” J. Constr. Div., Am. Soc. Civ. Eng., 101(4), 895–905.
Reda, R. M. (1990). “RPM: Repetitive project modeling.” J. Constr. Eng. Manage., 116(2), 316–330.
Selinger, S. (1980). “Construction planning for linear projects.” J. Constr. Div., Am. Soc. Civ. Eng., 106(2), 195–205.
Stradal, O., and Cacha, J. (1982). “Time space scheduling method.” J. Constr. Div., Am. Soc. Civ. Eng., 108(3), 445–457.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 132Issue 6June 2006
Pages: 585 - 597

History

Received: Dec 3, 2004
Accepted: Dec 14, 2005
Published online: Jun 1, 2006
Published in print: Jun 2006

Permissions

Request permissions for this article.

Authors

Affiliations

Rong-yau Huang [email protected]
Associate Professor, Institute of Construction Engineering and Management, National Central Univ., No. 300, Jhongda Rd., Jhongli City, Taoyuan 32001, Taiwan (R.O.C.) (corresponding author). E-mail: [email protected]
Kuo-Shun Sun [email protected]
Associate Professor, Dept. of Air Transportation, Kainan Univ., No. 1, Kainan Rd., Luchu, Taoyuan 338, Taiwan (R.O.C.). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share