Measuring Project Level Productivity on Transportation Projects
Publication: Journal of Construction Engineering and Management
Volume 132, Issue 3
Abstract
This research study introduces the development of a method for measuring and analyzing the project level productivity (PLP) of all project activity over the life of the project. A key aspect of the measurement method was the development of a process to combine multiple simultaneous work activity productivity into a global productivity value for the project as a whole. Three case studies, including the collection of thousands of productivity values, were performed on highway construction projects to demonstrate the validity of the analysis method. Results indicate that productivity can be measured and analyzed at the project level based upon the field data of construction operations.
Get full access to this article
View all available purchase options and get full access to this article.
References
Alarcón, L. F. (1993). “Modeling waste and performance in construction.” Paper presented on the Proc., 1st Workshop on Lean Construction, Espoo, Finland.
Alarcón, L. F., and Ashley, D. B. (1992). “Project performance modeling: A methodology for evaluating project execution strategies.” Rep. to the Construction Industry Institute, Univ. of Texas, Austin, Tex.
Florida Department of Transportation (FDOT) State Specifications Office. (2000). Standard specifications for road and bridge construction 2000, ⟨http://www.dot.state.fl.us/specificationsoffice/y2kBook/toc.htm⟩ (October 2002).
Florida Department of Transportation (FDOT) State Roadway Design Office. (2002). 2002 design standards, ⟨http://www.dot.state.fl.us/rddesign/rd/RTDS/02/2002_Standards.htm⟩ (October 2002).
Florida Department of Transportation (FDOT) State Estimates Office. (2003a). 2004 basis of estimates handbook, ⟨http://www.dot.state.fl. us/estimates/BOE/04BOEonline.htm⟩ (October 2003).
Mohammadian, R., and Waugh, L. (1997). Analytical series: Productivity adjustment in construction prices indexes, Catalogue No. 62F0014MPB, Prices Division, Statistics Canada, and Univ. of New Brunswick, Canada, 1–10.
Thomas, H. R., Maloney, W. F., Horner, R. M. W., Smith, G. R., Handa, V. K., and Sanders, S. R. (1990). “Modeling construction labor productivity.” J. Constr. Eng. Manage., 116(4), 705–726.
Thomas, H. R., and Završki, I. (1999a). “Construction baseline productivity: Theory and practice.” J. Constr. Eng. Manage., 125(5), 295–303.
Thomas, H. R., and Završki, I. (1999b). “Theoretical model for international benchmarking of labor productivity.” Final Rep. PTI 9913, Prepared for Pennsylvania Transportation Institute, Pennsylvania State Univ., University Park, Pa.
Information & Authors
Information
Published In
Copyright
© 2006 ASCE.
History
Received: Sep 2, 2004
Accepted: Jan 31, 2005
Published online: Mar 1, 2006
Published in print: Mar 2006
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.