Method for Calculating Schedule Delay Considering Lost Productivity

Publication: Journal of Construction Engineering and Management
Volume 131, Issue 11

Abstract

A delay claim often occurs when a difference between the actual completion date and the contract completion date exists. The duration of a delay is an essential piece of information required for determining the cause of a delay. However, it is difficult to analyze a delay claim due to the fact that numerous factors that cause this delay, thereby making it a very complex issue. One of such factors is the lost productivity or loss of productivity. Despite the fact that it is one of the major causes of delay, there have been only a few studies that focus on converting lost productivity into delay duration carried out to date. Claims for productivity losses are generally the result of tension between the contractor and the owner. This tension arises due to the great difficulty involved in quantifying disruption effects. Thus, to calculate accurately the delay duration, a logical method for analyzing schedule delay caused by lost productivity is necessary. Therefore, in this study, we propose a method for analyzing construction schedule delay where this lost productivity is taken into consideration. This methodology was implemented on a case project to ascertain its practicability, and to decide whether it can be utilized in the case of a delay claim related to lost productivity. The significance of this paper is twofold. One is the method to convert the lost productivity into the delay duration, which can be applied to reasonable delay claim settlement. The other is the process to analyze the construction schedule delay considering lost productivity.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgment

The writers would like to thank the Korea Institute of Science and Technology Evaluation and Planning (Grant No. UNSPECIFIEDM10104000274-01J000012100) for their contributions to this research.

References

Abdul-Malak, M. A., Ei-Saadi, M. H., and Abou-Zeid, M. (2002). “Process model for administrating construction claims.” J. Manage. Eng., 18(2), 84–94.
Al-Saggaf, H. A. (1998). “The five commandments of construction project delay analysis.” Cost Eng., 40(4), 37–41.
Arditi, D., and Robinson, M. A. (1995). “Concurrent delays in construction litigation.” Cost Eng., 37(7), 20–30.
Bramble, B. B., and Callahan, M. T. (1992). Construction delay claims, 2nd Ed., Wiley, New York.
Bramble, B. B., D’Onfrio, M. F., and Stetson, J. B. (1990). Avoiding & resolving construction claims., R.S.Means Company.
Bubshait, A. A., and Cunningham, M. J. (1998). “Comparison of delay analysis methodologies.” J. Constr. Eng. Manage., 124(4), 315–322.
Finke, M. R. (1998). “A better way to estimate and mitigate disruption.” J. Constr. Eng. Manage., 124(6), 490–497.
Finke, M. R. (1999). “Window analysis of compensable delays.” J. Constr. Eng. Manage., 125(2), 96–100.
Kallo, G. G. (1996). “Estimating loss of productivity claims.” J. Manage. Eng., 12(6), 13–15.
Kartam, S. (1999). “Generic methodology for analysing delay claims.” J. Constr. Eng. Manage., 125(6), 409–419.
Kraiem, Z. M., and Diekmann, J. E. (1987). “Concurrent delays in construction projects.” J. Constr. Eng. Manage., 113(4), 591–602.
Kululanga, G. G., Kuotcha, W., McCaffer, and Edum-Fotwe, F. (2001). “Construction contractors’ claim process framework.” J. Constr. Eng. Manage., 127(4), 309–314.
Reichard, D. D., and Norwood, C. L. (2001). “Analyzing the cumulative impact of changes.” AACE International Transactions, AACE International.
Richter, I. E.(1983). International construction claims: Avoiding & resolving disputes, McGraw–Hill, New York.
Rubin, R., Fairweather, V., Guy, S., and Maevis, A.(1992). Construction claims prevention and resolution, 2nd Ed., Van Nostrand-Reinhold, New York.
Shi, J. J., Cheung, S. O., and Arditi, D. (2001). “Construction delay computation method.” J. Constr. Eng. Manage., 127(1), 60–65.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 131Issue 11November 2005
Pages: 1147 - 1154

History

Received: May 15, 2003
Accepted: Mar 22, 2005
Published online: Nov 1, 2005
Published in print: Nov 2005

Permissions

Request permissions for this article.

Authors

Affiliations

Hyun-Soo Lee, M.ASCE [email protected]
Associate Professor, Dept. of Architecture, Seoul National Univ., Seoul 151-742, Korea (corresponding author). E-mail: [email protected]
Han-Guk Ryu [email protected]
PhD Candidate, Dept. of Architecture, Seoul National Univ., Seoul 151-742, Korea. E-mail: [email protected]
PhD, Full–time Lecturer, Dept. of Architectural Engineering, Kwangwoon Univ., Seoul 139-701, Korea. E-mail: [email protected]; formerly, Dept. of Architecture, Seoul National Univ., Seoul 151-742, Korea.
Jae-Jun Kim, M.ASCE [email protected]
Associate Professor, College of Architecture, Hanyang Univ., Seoul 133-791, Korea. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share