Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry
Publication: Journal of Construction Engineering and Management
Volume 130, Issue 2
Abstract
The preparation of detailed models of information and process flow by 14 member companies of the North American Precast Concrete Software Consortium has provided a unique window into the current management, engineering design, and production operations in this industry. The modeling was performed using the authors’ Georgia Tech Process for Product Modeling tool, within the framework of the consortium’s effort to develop a precast concrete product model and to specify new integrated three dimensional modeling software. The paper opens with a comparative economic review of precast construction internationally and in North America, which reveals that the market share of precast construction in North American is relatively low. The models are analyzed and aspects of the underlying management procedures that they reveal are discussed, such as types of contracting arrangements, cost estimating, design outsourcing, engineering design communication, mold design, product diversity, and quality control. The results highlight aspects of precast management processes that may be re-engineered through appropriate application of information technology.
Get full access to this article
View all available purchase options and get full access to this article.
References
Arditi, D., Ergin, U., and Gunhan, S.(2000). “Factors affecting the use of precast concrete systems.” J. Archit. Eng., 6(3), 79–86.
Augenbroe, G., ed. (1995). “COMBINE 2 Final Rep.,” EU DG XII JOULE Rep.
Crowley, A. J., and Ward, M. A. (1999). “CIMsteel Integration Standards 2.” AP230 IDEF0 Model, Document SCI-P-267.
Dawood, N. N. (1996). “A strategy of knowledge elicitation for developing an integrated bidding/production management expert system for the precast industry.” Advances in engineering software, Vol. 25, Elsevier Science, New York, 225–234.
Eastman, C. M. (1999). Building product models, CRC Press, Boca Raton, Fla.
Eastman, C. M., Lee, G., and Sacks, R. (2002). “Deriving a product model from process models.” Proc., 9th ISPE/CE2002 Int. Conf. on Concurrent Engineering: Research and Applications, Cranfield Univ., U.K., 429–438.
Eastman, C. M., Sacks, R., and Lee, G. (2001). “Software specification for a precast concrete design and engineering software platform.” PCSC Research Rep., Georgia Institute of Technology, Atlanta.
Finnish Concrete Industry Association (FCIA). (2000). Internal Rep., Helsinki, Finland.
Hayes-Roth, F., Waterman, D. A., and Lenat, D. B., eds. (1983). Building expert systems, Addison-Wesley, Reading, Mass.
Hernandez, A. (1993). Just-in-time quality: A practical approach, Prentice-Hall, Englewood Cliffs, N.J.
Karhu, V. (1997). “Product model based design of precast facades.” Electron. J. Inf. Technol. in Constr., 〈http://itcon.org〉, 2, 1–31.
Karstila, K. (2001). “Precast concrete constructions IFC-project (PCC-IFC) Version 1.0,” EuroSTEP/RTT 〈www.eurostep.com〉 (Nov. 15, 2002).
Kirikova, M. (2000). “Explanatory capability of enterprise tmodels.” Data and knowledge engineering, Vol. 33, Elsevier Science, New York, 119–136.
Lee, G., Sacks, R., and Eastman, C. M. (2002). “Dynamic information consistency checking in the requirements analysis phase of data modeling,” eWork and eBusiness in Architecture, Engineering and Construction-European Conf. for Process and Product Modeling, Z. Turk and R. Scherer, eds., Slovenia, 285–291.
Marca, D. A., and McGowan, C. L. (1987). SADT—structured analysis and design technique, McGraw-Hill, New York.
National Institute of Standards and Technology (NIST). (1993). “Integration definition for function modeling (IDEF0).” Federal Information Processing Standards Publication (FIPS) 183, Gaitherburg, Md.
Pheng, L. S., and Chuan, C. J.(2001). “Just-in-time management of precast concrete components.” J. Constr. Eng. Mange., 127(6), 494–501.
Precast/Prestressed Concrete Institute (PCI). (1999). PCI design handbook of precast and prestressed concrete, 5th Ed., Chicago.
Precast/Prestressed Concrete Institute (PCI). (2000). Annual Financial and Cost Data Survey—2000, Chicago.
Precast/Prestressed Concrete Institute (PCI). (2001). PCI and CPCI Software Survey, Chicago.
Ranasinghe, M., and Russell, A. D. (1993). “Elicitation of subjective probabilities for economic risk analysis: an investigation.” Construction management and economics, Vol. 11, E&FN Spon, 326–340.
Rådet for Teknisk Terminologi (RTT). (2000). Yearbook—Economic Outlook—2000, Finnish Association of Construction Product Industries, Helsinki, Finland 〈http://www.rttry.fi〉 (Nov. 15, 2002).
Steward, D. V.(1981). “The design structure system: A method for managing the design of complex systems.” IEEE Trans. Eng. Manage., 28, 71–74.
Tyson, B., Dong, Q., Fernandez, C. I. G., and Yassine, A. (2000). “DSM excel macro,” Massachusetts Institute of Technology, Cambridge, Mass., 〈http://web.mit.edu/dsm/macros.htm〉 (Nov. 15, 2002)
Warszawski, A.(1982). “Managerial planning and control in precast industry.” J. Constr. Div., Am. Soc. Civ. Eng., 108(2), 299–313.
Information & Authors
Information
Published In
Copyright
Copyright © 2004 American Society of Civil Engineers.
History
Received: May 30, 2002
Accepted: Jan 16, 2003
Published online: Mar 15, 2004
Published in print: Apr 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.