Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization

Publication: Journal of Construction Engineering and Management
Volume 130, Issue 2

Abstract

Reducing both project cost and time (duration) is critical in a competitive environment. However, a trade-off between project time and cost is required. This in turn requires contracting organizations to carefully evaluate various approaches to attaining an optimal time-cost equilibrium. Although several analytical models have been developed for time-cost optimization (TCO), they mainly focus on projects where the contract duration is fixed. The optimization objective in those cases is therefore restricted to identifying the minimum total cost only. With the increasing popularity of alternative project delivery systems, clients and contractors are targeting the increased benefits and opportunities of seeking an earlier project completion. The multiobjective model for TCO proposed in this paper is powered by techniques using genetic algorithms (GAs). The proposed model integrates the adaptive weights derived from previous generations, and induces a search pressure toward an ideal point. The concept of the GA-based multiobjective TCO model is illustrated through a simple manual simulation, and the results indicate that the model could assist decision-makers in concurrently arriving at an optimal project duration and total cost.

Get full access to this article

View all available purchase options and get full access to this article.

References

Adrian, J. J. (1979). Construction accounting: Financial, managerial, auditing and tax, Prentice-Hall, Englewood Cliffs, N.J.
Alkass, S., Mazerolle, M., Harris, F.(1996). “Construction delay analysis techniques.” Constr. Manage. Econ., 14(5), 375–394.
Burns, S. A., Liu, L., and Feng, C. W.(1996). “The LP/IP hybrid method for construction time-cost trade-off analysis.” Constr. Manage. Econ., 14(3), 265–276.
Coello, C. C.(2000). “An updated survey of GA-based multiobjective optimization techniques.” ACM Comput. Surv., 32(2), 109–143.
Feng, C., Liu, L., and Burns, S.(1997). “Using genetic algorithms to solve construction time-cost trade-off problems.” J. Comput. Civ. Eng., 11(3), 184–189.
Fondahl, J. W. (1961). “A Non-Computer Approach to the Critical Path Method for the Construction Industry.” Technical Rep. No. 9, The Construction Institute, Department of Civil Engineering, Stanford University, Stanford, Calif.
Gen, M., and Cheng, R. (2000). Genetic algorithms & engineering optimization, Wiley-Interscience, New York.
Hegazy, T.(1999). “Optimization of construction time-cost trade-off analysis using genetic algorithms.” Can. J. Civ. Eng., 26, 685–697.
Henderickson, C., and Au, T. (1989). Project management for construction, Prentice-Hall, Inc., Englewood Cliffs, N.J.
Kasprowicz, T. (1994). “Multi-objective optimization of construction schedules.” Proc., 1st Congress on Computing in Civil Engineering, Part 1, Washington, D.C., 185–190.
Kelly, J. E.(1961). “Critical path planning and scheduling: mathematical basis.” Oper. Res., 9(3), 167–179.
Knowles, J. D., Watson, R. A., and Corne, D. W. (2001). “Reducing local optima in single-objective problems by multi-objectivization.” EMO 2001, E. Zitzler et al., eds., LNCS 1993, 269–283.
Laptali, E., Bouchlagham, N., and Wild, S.(1997). “Planning and estimating in practice and the use of integrated computer models.” Autom. Constr., 7(1), 71–76.
Leu, S. S., and Yang, C. H.(1999). “GA-based multicriteria optimal model for construction scheduling.” J. Constr. Eng. Manage., 125(6), 420–427.
Li, H.and Love, P. E.(1997). “Using improved genetic algorithms to facilitate time-cost optimization.” J. Constr. Eng. Manage., 123(3), 233–237.
Liu, L., Burns, S., and Feng, C.(1995). “Construction time-cost trade-off analysis using LP/IP hybrid method.” J. Constr. Eng. Manage., 121(4), 446–454.
Meyer, W. L. and Shaffer, L. R. (1963). “Extensions of the Critical Path Method through the Application of Integer Programming.” Civil Engineering and Construction Research, Series 2, Univ. of Illinois, Urbana, Ill.
Moselhi, O.(1993). “Schedule compression using the direct stiffness method.” Can. J. Civ. Eng., Ottawa, 20(1), 65–72.
Ng, S. T., Deng, M. Z. M., Skitmore, R. M., and Lam, K. C.(2000). “A conceptual case-based decision model for mitigating construction delays.” Int. J. Constr. Inf. Technol., 8(2), 1–20.
Nkasu, M. M., and Leung, K. H.(1997). “Resources scheduling decision support system for concurrent project management.” Int. J. Prod. Res., 35(11), 3107–3132.
Osyczka, A. (2002). Evolutionary algorithms for single and multicriteria design optimization, Physica, New York.
Pagnoni, A. (1990). Project engineering: Computer oriented planning and operational decision making, Springer, Berlin.
Park, W. R., and Chapin, W. B. (1992). Construction bidding: Strategic pricing for profit, Wiley, New York.
Prager, W.(1963). “A structured method of computing project cost polygons.” Manage. Sci. 9(3), 394–404.
Siemens, N.(1971). “A simple CPM time-cost trade-off algorithm.” Manage. Sci., 17(6), 354–363.
Todd, D., and Sen, P. (1999). “Distributed task scheduling and allocating using genetic algorithms.” Proc., 24th Int. Conf. on Computers and Industrial Engineering, Middlesex, U.K., 47–50.
Wang, C. H., and Huang, Y. C.(1998). “Optimization model for construction project durations using a multistage decision process.” Eng. Optimiz., 30(2), 155–173.
Zadeh, L. A.(1965). “Fuzzy sets.” Inf. Control, 8, 338–353.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 130Issue 2April 2004
Pages: 168 - 176

History

Received: Jul 8, 2002
Accepted: Dec 4, 2002
Published online: Mar 15, 2004
Published in print: Apr 2004

Permissions

Request permissions for this article.

Authors

Affiliations

Daisy X. M. Zheng
Research Student, Dept. of Civil Engineering, Univ. of Hong Kong, Hong Kong.
S. Thomas Ng
Assistant Professor, Dept. of Civil Engineering, University of Hong Kong, Hong Kong (corresponding author).
Mohan M. Kumaraswamy, M.ASCE
Associate Professor, Dept. of Civil Engineering, University of Hong Kong, Hong Kong.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share