Work Inputs and Related Economic Aspects of Multitier Shoring Towers
Publication: Journal of Construction Engineering and Management
Volume 130, Issue 1
Abstract
Shoring towers are the common formwork solution for high-clearance construction. Because towers account for a remarkably high percentage of the cost of the constructed concrete element, work input data and related economic aspects of tower erection constitute important information for constructors. This paper presents three case studies of high multitier shoring towers, each representing a different tower type. Tower data, major construction parameters, and work inputs for each case are presented. Findings are compared and discussed, and due conclusions are drawn. Finally, recommendations on measures expected to increase the economy of shoring solutions using multitier towers are offered, and some restrictions on the adoption of work input data are listed.
Get full access to this article
View all available purchase options and get full access to this article.
References
Bennett, C. P., and D’Alessio, M. S. (1996). “Falsework/shoring.” Handbook of temporary structures in construction, 2nd Ed., R. T. Ratay, ed., McGraw-Hill, New York, 16.1–16.55.
Formwork: A guide to good practice. (1995). 2nd Ed., The Concrete Society, London.
Hanna, A. S. (1999). Concrete formwork systems, Marcel-Dekker, New York.
Hurd, M. K. (1995). Formwork for concrete, SP-4, 6th Ed., American Concrete Institute, Farmington Hills, Mich.
Introduction to work study. (1992). 4th revised Ed., International Labor Office, Geneva.
Johnston, R. S.(1996). “Design guidelines for formwork shoring towers.” Concr. Constr., 41(10), 743–747.
McAdam, P. S., and Lee, G. W. (1997). Formwork: A practical approach, E & FN Spon, London.
Means. (1988). Man-hour standards for construction, 2nd Ed., R. S. Means Co., Inc. Kingston, Mass.
Means. (1998). Building construction cost data, 56th Ed., R. S. Means Co., Inc. Kingston, Mass.
Peurifoy, R. L., and Oberlender, G. D. (1996). Formwork for concrete structures, 3rd Ed., McGraw-Hill, New York.
Price, A. D. F., and Harris, F. C. (1992). “Methods of measuring production times for construction work.” The practice of site management, Vol. 4, P. A. Harlow, ed., The Chartered Institute of Building, Ascot, Berkshire, U.K., 143–156.
Selinger, S., and Shapira, A. (1985). “Rational design of formwork for building elements.” Res. Rep. No. 017-338, National Building Research Institute, Technion, Haifa, Israel.
Shapira, A.(1995). “Rational design of shoring-tower-based formwork.”J. Constr. Eng. Manage., 121(3), 255–260.
Shapira, A., and Goldfinger, D.(2000). “Work-input model for assembly and disassembly of high shoring towers.” Constr. Manage. Econom., 18(4), 467–477.
Shapira, A., and Raz, Y. (2003). “Comparative study and rational selection of heavy-duty shoring towers.” Res. Rep. No. 017-657, National Building Research Institute, Technion, Haifa, Israel.
Shapira, A., Shahar, Y., and Raz, Y.(2001). “Design and construction of high multitier shoring towers: Case study.” J. Constr. Eng. Manage., 127(2), 108–115.
Simons, A.(1991). “Formwork—An international overview.” Concrete, 25(3), 8–11.
Smith, A.(1990). “Adjustable shoring systems.” Concr. Constr., 35(11), 921–931.
Information & Authors
Information
Published In
Copyright
Copyright © 2004 American Society of Civil Engineers.
History
Received: Sep 25, 2001
Accepted: Aug 6, 2002
Published online: Jan 16, 2004
Published in print: Feb 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.