Genetic Optimization for Dynamic Project Control
Publication: Journal of Construction Engineering and Management
Volume 129, Issue 4
Abstract
This paper presents a comprehensive model for cost optimization and dynamic project control. The model incorporates an integrated formulation for estimating, scheduling, resource management, and cash-flow analysis. The basic premise of the model is to allocate optional construction methods for each activity, varying from cheap and lengthy to expensive and short. Using a genetic algorithms procedure for total cost optimization, the model considers the actual progress of activities and optimizes the schedule of remaining ones (by determining the best combination of construction methods) so that project constraints are respected. The model, as such, is usable not only at the planning stage but also during construction. A description of the model and its application on an example project are provided in this paper. In addition, the paper introduces the recently emerged critical chain method for project control and describes an effort to incorporate some of its features into the earned-value analysis used in the proposed model.
Get full access to this article
View all available purchase options and get full access to this article.
References
Chan, W., Chua, D., and Kannan, G.(1996). “Construction resource scheduling with genetic algorithms.” J. Constr. Eng. Manage., 122(2), 125–132.
Goldberg, D. E. (1989). Genetic algorithms in search, optimization, and machine learning, Addison-Wesley, Reading, Mass.
Goldratt, E. (1997). Critical chain, The North River Press, Great Barrington, Mass.
Hegazy, T. (2002). Computer-based construction project management, Prentice-Hall Inc., Upper Saddle River, N.J.
Hegazy, T., and Moselhi, O.(1994). “Analogy-based solution to markup estimation problem.” J. Comput. Civ. Eng., 8(1), 72–87.
Karim, A., and Adeli, H.(1999). “CONSCOM: an OO construction scheduling and change management system.” J. Constr. Eng. Manage., 125(5), 368–376.
Karshanas, S., and Haber, D.(1990). “Economic optimization of construction project scheduling.” J. Constr. Manage. Econ., E&FN Spon, 8(2), 135–146.
Leach, L. P.(1999). “Critical chain project management improves project performance.” Proj. Manage. J., PMI, 30(2), 39–51.
Li, H., and Love, P.(1997). “Using improved genetic algorithms to facilitate time-cost optimization.” J. Constr. Eng. Manage., 123(3), 233–237.
Li, S.(1996). “New approach for optimization of overall construction schedule.” J. Constr. Eng. Manage., 122(1), 7–13.
Lin, W. Y., and Tserng, H. P. (2001). “Automating communication for construction schedule control using XML-based information.” Proc., 4th CSCE Construction Specialty Conf., Victoria, BC, Canada.
McConnell, D. R.(1985). “Earned value technique for performance measurement.” J. Manage. Eng., 1(2), 79–94.
Microsoft project reference manual. (2000). Microsoft Corp., One Microsoft Way, Redmond, Wash.
Rasdorf, W. J., and Herbert, M. J.(1990). “Bar coding in construction engineering.” J. Constr. Eng. Manage., 116(2), 261–280.
RS Means Company. (2000). “Means building construction cost data.” RS Means Company, Inc., Kingston, Ma.
Russell, J. S., Jaselskis, E. J., and Lawrence, S. P.(1997). “Continuous assessment of project performance.” J. Constr. Eng. Manage., 123(1), 64–71.
Information & Authors
Information
Published In
Copyright
Copyright © 2003 American Society of Civil Engineers.
History
Received: Feb 28, 2002
Accepted: May 21, 2002
Published online: Jul 15, 2003
Published in print: Aug 2003
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.