Estimation of Minimum Working Capital for Construction Projects in Malaysia

Publication: Journal of Construction Engineering and Management
Volume 129, Issue 4

Abstract

Forecasting cash requirements is essential for all contractors during the tendering stage since cash flow at the beginning of the project is a major cause of construction companies’ failure. Unfortunately, estimating minimum working capital (MWC) is not the mainstream practice of the majority of contractors in Malaysia, who find that the present models for estimating MWC are cumbersome and seldom give an accurate estimate. Therefore estimates of MWC made during the tendering stage need to be simplified so they can be prepared quickly with minimum input. It is important for the developer or owner to select a qualified contractor with competent financial backing. This paper establishes the relationship among the factors that contribute to MWC requirements and presents a simple model that could be used as a guide to estimate MWC for housing construction projects in Malaysia. The estimation is based on percentages of variables of contract value based on the historical data that influence MWC; the MWC obtained is then expressed in terms of percentage of contract value.

Get full access to this article

View all available purchase options and get full access to this article.

References

Alreck, P. L., and Settle, R. B. (1985). The survey research handbook, Richard D. Irwin.
Ashworth, A. (1997). Cost studies of buildings, 4th Ed., Longman Group Limited, Harlow, U.K.
Enns, P. G. (1985). Business statistics, methods and application, Richard D. Irwin.
Halpin, D. W., and Woodhead, R. W. (1998). Construction management, Wiley, New York.
Kaka, A. P.(1996). “Flexible and accurate cash flow forecasting.” Constr. Manage. Econom., 12, 35–44.
Kenley, R., and Wilson, O.(1989). “A construction project net cash flow model.” Constr. Manage. Econom., 7, 3–18.
Ministry of Finance Malaysia. (2000). Economic report, National Printing Malaysia Limited.
Navon, R.(1995). “Resource-based model for automatic cash-flow forecasting.” Constr. Manage. Econom., 13, 501–510.
Navon, R.(1996). “Company-level cash-flow management.” J. Constr. Eng. Manage., 122(1), 22–29.
Ranasinghe, M.(1996). “Total project cost: A simplified model for decision makers.” Constr. Manage. Econom., 14, 497–505.
Stukhart, G.(1982). “Inflation and the construction industry.” J. Constr. Div., Am. Soc. Civ. Eng., 108(4), 546–562.
Wilson, R. M. S. (1975). Cost control handbook financing problems, 2nd Ed., Gower Press Limited.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 129Issue 4August 2003
Pages: 369 - 374

History

Received: Dec 28, 2000
Accepted: Jul 9, 2002
Published online: Jul 15, 2003
Published in print: Aug 2003

Permissions

Request permissions for this article.

Authors

Affiliations

S. Hassim
General Manager, Housing Research Centre, Faculty of Engineering, Universiti Putra Malaysia, 43400 UPM Serdang, Selangor Darul Ehsan, Malaysia.
M. R. A. Kadir
Deputy Director, Housing Research Centre, Faculty of Engineering, Universiti Putra Malaysia, 43400 UPM Serdang, Selangor Darul Ehsan, Malaysia.
Yoke-Lian Lew
Researcher, Housing Research Centre, Faculty of Engineering, Universiti Putra Malaysia, 43400 UPM Serdang, Selangor Darul Ehsan, Malaysia.
Yin-Chew Sim
Researcher, Housing Research Centre, Faculty of Engineering, Universiti Putra Malaysia, 43400 UPM Serdang, Selangor Darul Ehsan, Malaysia.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share