Interface Management within Construction: In Particular, Building Facade
Publication: Journal of Construction Engineering and Management
Volume 129, Issue 1
Abstract
This paper discusses the need for interface management within construction, with particular reference to building facade interfaces. It categorizes the three different types of interface management—physical, contractual, and organizational. The implication of interface management in construction contracting is discussed; it is explained how the U.K. procurement trends have changed, affecting the interface management within projects. U.K. cladding procurement is very fragmented, and the paper maps the development of a typical cladding system showing the complexities of interface management. Finally, the paper discusses CladdISS, a U.K. government funded research project to develop a standardized strategy for the design and management of window and cladding interfaces. It explains the principles of CladdISS with reference to process maps, action plans, management strategy, bibliography, advice on standards, materials, maintenance, joints, movement, and tolerances. This will enable strategies to be developed to avoid the endemic interface problems occurring on-site. It will also guide the management of the interfaces throughout the project.
Get full access to this article
View all available purchase options and get full access to this article.
References
“Creating service partnerships.” (1993). Partnership Sourcing, DTI, CBI, London.
Evans, G. N., et al. (1997). “Organizing for improved construction interfaces.” Innovation in civil and construction engineering, Civil-Comp Press, Edinburgh, U.K., 207–212.
France, G. (1993). “Building team spirit.” Proc., Building, The Builder Group, London, 60.
Ganah, A., et al. (2000). “The use of visualization to communicate design information to construction sites.” Rep., ARCOM, Glasgow, U.K., 833–842.
Gibb, A. G. F. (1994). “Prefabricated modules in construction—Contrasting approaches to prefabrication from Vintners Place and Stockley Park.” CIOB Construction Paper No. 38, Ascot, U.K., 1–8.
Gibb, A. G. F. (1995). “The management of construction interfaces: Preliminary results from an industry sponsored research project concentrating on high performance cladding in the United Kingdom.” SCAL Convention, Construction Vision 2000.
Klein, R. (1998). “Problems at design interfaces.” Proc., M&E Design, 23–24.
Layzell, J. (1997). “Failure mode and effects analysis in the cladding industry.” ICBEST, Int. Conf. on Building Systems and Technology, 173–178.
O’Brien, M. J., and Willmott, A. A. (2001). “Planned inspection and maintenance.” The Whole-life Performances of Facades Proc., Univ. of Bath, Bath, U.K.
O’Connor, J. T., Rusch, S. E., and Schulz, M. J.(1987). “Constructibility concepts for engineering and procurement.” J. Constr. Eng. Manage., 113(2), 235–248.
Pavitt, T. C., et al. (2001). “CladdISS—A strategy for managing cladding interfaces.” ICBEST, Int. Conf. on Building Systems and Technology.
Pavitt, T. C., and Gibb, A. G. F. (1999). “Managing organizational interfaces in the cladding supply chain: Initial results from expert interviews.” Rep., ARCOM, Liverpool, U.K.
Rostron, R. M. (1964). A light cladding of buildings, Architectural Press, London.
Waring, A., and Gibb, A. G. F. (2001). “Sub-standard workmanship of curtain wall facades.” ICBEST, Int. Conf. on Building Systems and Technology.
Information & Authors
Information
Published In
Copyright
Copyright © 2003 American Society of Civil Engineers.
History
Received: Jun 21, 2001
Accepted: Nov 29, 2001
Published online: Jan 15, 2003
Published in print: Feb 2003
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.