Achieving Multiple Project Objectives through Contingency Management
Publication: Journal of Construction Engineering and Management
Volume 128, Issue 1
Abstract
Project managers use budgets to satisfy multiple objectives such as cost control, short durations, and high quality. Contingency funds are included in project budgets to manage risk and achieve project goals. Understanding how managers use budget contingencies requires a dynamic information processing model of how managers bridge the gap between high project complexity and limited managerial capacity. The results of collecting contingency management practices of real estate development project managers is reported and a dynamic simulation model of contingency management described. The model is used to test hypotheses of the effectiveness of aggressive and passive management strategies on cost, timeliness, and facility value. Managers were found to pursue general project objectives in their management of contingency. An aggressive strategy was found to be more robust but performed poorer than a passive strategy. Conclusions include the prevalence of trade-offs between robust and high-performance contingency management policies in construction projects and the importance of incorporating uncertainty into project planning and management.
Get full access to this article
View all available purchase options and get full access to this article.
References
Amran, M. and Kulatilaka, N. (1999). Real options, managing strategic investment in an uncertain world, Harvard Business School Press, Cambridge, MA.
Barrie, D. S., and Paulson, B. C. (1984). Professional construction management, McGraw-Hill, New York.
Bennett, J. (1985). Construction project management, Butterworth’s, London.
Clough, R. H. (1975). Construction contracting, Wiley, New York.
Cooper, K. G.(1980). “Naval ship production: A claim settled and a framework built.” Interfaces, 10(6), 20–36.
Diekmann, J. E., Sewester, E. E., and Taher, K. (1988). “Risk management in capital projects.” Construction Industry Institute Source Document 41. Austin, Tex.
Doyle, J. K., and Ford, D. N.(1998). “Mental model concepts for system dynamics research.” System Dynamics Review, 14(1), 3–29.
Ford, D. N. (1997). “Structuring budget contingency management to satisfy multiple development objectives.” Report 57. Dept. of Information Science, Univ. of Bergen, Bergen, Norway.
Ford, D. N., and Sterman, J. D.(1998). “Modeling dynamic development processes.” System Dynamics Review, 14(1), 31–68.
Forrester, J. W. (1961). Industrial dynamics, Productivity Press, Portland, Ore.
Forrester, J. W., and Senge, P. M.(1980). “Tests for building confidence in system dynamics models.” TIMS Series in the Management Sciences, 14, 209–228.
Hackney, J. W. (1985). “Applied contingency analysis.” Transactions, AACE 9th Annual Meeting, Denver, Colo., B.1–B.4.
Hendrickson, C., and Au, T. (1989). Project management for construction, Prentice Hall, Englewood Cliffs, N.J.
Jackson, R. L., Kinsey, J. W., Cotton, W. E., and Moore, S. K. (1985). “The why and how of contingency management.” Transactions, AACE 9th Annual Meeting. Denver, Colo., N.O.1–N.O.5.
Lockhart, C. W., and Roberds, W. J.(1996). “Worth the Risk?” Civil Engineering, 66(4), 62–64.
Mak, S., and Picken, D.(2000). “Using risk analysis to determine construction project contingencies.” J. Constr. Eng. Manage., 126(2), 130–136.
Montoya-Weiss, M., and Calantone, R.(1994). “Determinants of new product performance: A review and met-analysis.” Journal of Product Innovation Management, 11(5), 397–417.
Murray, J. W., and Ramsaur, W. F.(1983). “Project reserves: A key to managing cost risks.” Project Management Quarterly, 14(3), 15–25.
National Aeronautics and Space Administration (NASA). (1996). “Cost estimating guidelines.” Parameter Cost Estimating Reference Manual, Washington, D.C.
Paulson, B.(1976). “Designing to reduce construction costs.” J. Constr. Div. 102(4), 587–592.
Pollack, H., and Zeckhauser, R.(1996). “Budgets as dynamic gatekeepers.” Manage. Sci., 42(5), 642–58.
Repenning, N.(2000). “A dynamic model of resource allocation in multi-project research and development systems.” System Dynamics Review, 16(3), 173–212.
Repenning, N., and Sterman, J. D. (2000). “Getting quality the old-fashioned way: Self-confirming attributions in the dynamics of process improvement.” The quality movement and organizational theory, R. Scott and R. Cole, eds., Sage, Newbury Park, Calif.
Rosenau, M., and Moran, J. (1993). Managing the development of new products, Van Nostrand Reinhold, New York
Ruskin, A. (1995). “Managing design-to-cost engineering projects.” Project Management Journal, 26(3), 12–6.
Ruskin, A. M.(1981). “Monitoring and contingency allowances: Complimentary aspects of project control.” Project Management Quarterly, 12(4), 49–50.
Senge, P. M. (1990). The fifth discipline, The art & practice of the learning organization, Doubleday Currency, New York.
Simon, H. (1995). The sciences of the artificial, MIT Press. Cambridge, Mass.
Smith, G. R., and Bohn, C. M.(1999). “Small to medium contractor contingency and assumption of risk.” J. Constr. Eng. Manage., 125(2), 101–108.
Sterman, J. D.(1994). “Learning in about complex systems.” System Dynamics Review, 10(2–3), 291–330.
Sterman, J. D. (2000). Business dynamics, systems thinking and modeling for a complex world, McGraw-Hill, New York.
Williams, G. V.(1995). “Fast track pros and cons: Considerations for industrial projects.” J. Manage. Eng., 11(5), 24–32.
Yeo, K. T.(1990). “Risks, classification of estimates, and contingency management.” J. Manage. Eng., 6(4), 458–470.
Yin, R. K. (1994). Case study research, design and methods, Sage Publications, London.
Information & Authors
Information
Published In
Copyright
Copyright © 2002 American Society of Civil Engineers.
History
Accepted: Feb 27, 2001
Received: Jun 25, 2001
Published online: Feb 1, 2002
Published in print: Feb 2002
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.