TECHNICAL PAPERS
Jun 1, 2001

Object-Oriented Model for Repetitive Construction Scheduling

Publication: Journal of Construction Engineering and Management
Volume 127, Issue 3

Abstract

This paper presents the development of an object-oriented model for scheduling of repetitive construction projects such as high-rise buildings, housing projects, highways, pipeline networks, bridges, tunnels, railways, airport runways, and water and sewer mains. The paper provides an overview of the analysis, design, and implementation stages of the developed object-oriented model. These stages are designed to provide an effective model for scheduling repetitive construction projects and to satisfy practical scheduling requirements. The model incorporates newly developed procedures for resource-driven scheduling of repetitive activities, optimization of repetitive construction scheduling, and integration of repetitive and nonrepetitive scheduling techniques. The model is named LSCHEDULER and is implemented as a windows application that supports user-friendly interface including menus, dialogue boxes, and windows. LSCHEDULER can be applied to perform regular scheduling as well as optimized scheduling. In optimized scheduling, the model can assist in identifying an optimum crew utilization option for each repetitive activity in the project that provides a minimum duration or cost for the scheduled repetitive construction project.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ashley, D. B. (1980). “Simulation of repetitive-unit construction.”J. Constr. Div., ASCE, 106(2), 185–194.
2.
Birrell, G. S. (1980). “Construction planning—Beyond the critical path.”J. Constr. Div., ASCE, 106(3), 389–407.
3.
Booch, G. ( 1994). Object-oriented analysis and design with applications, Benjamin/Cummings, Redwood City, Calif.
4.
Chrzanowski, E. N., Jr. and Johnston, D. W. (1986). “Application of linear scheduling.”J. Constr. Engrg. and Mgmt., ASCE, 112(4), 476–491.
5.
Eldin, N. N., and Senouci, A. B. ( 1994). “Scheduling and control of linear projects.” Can. J. Civ. Engrg., Ottawa, 21, 219–230.
6.
El-Rayes, K., and Moselhi, O. ( 1998). “Resource-driven scheduling of repetitive activities on construction projects.” J. Constr. Mgmt. and Economics, 16(4), 433–446.
7.
Herbsman, Z. J. (1995). “A+B bidding method—Hidden success story for highway construction.”J. Constr. Engrg. and Mgmt., ASCE, 121(4), 430–437.
8.
Herbsman, Z. J., Chen, W. T., and Epstein, W. C. (1995). “Time is money: Innovative contracting methods in highway construction.”J. Constr. Engrg. and Mgmt., ASCE, 121(3), 273–281.
9.
Kavanagh, D. P. (1985). “SIREN: A repetitive construction simulation model.”J. Constr. Engrg. and Mgmt., ASCE, 111(3), 308–323.
10.
Moselhi, O., and El-Rayes, K. (1993). “Scheduling of repetitive projects with cost optimization.”J. Constr. Engrg. and Mgmt., ASCE, 119(4), 681–697.
11.
Moselhi, O., Gong, D., and El-Rayes, K. ( 1997). “Estimating weather impact on duration of construction activities.” Can. J. Civ. Engrg., Ottawa, 24(3), 359–366.
12.
O'Brien, J. J., Kreitzberg, F. C., and Mikes, W. F. (1985). “Network scheduling variations for repetitive work.”J. Constr. Engrg. and Mgmt., ASCE, 111(2), 105–116.
13.
Reda, R. M. (1990). “RPM: Repetitive project modeling.”J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316–330.
14.
Rumbaugh, J., Blaha, M., Premerlani, W., Eddy, F., and Lorensen, W. ( 1991). Object-oriented modelling and design, Prentice-Hall, Englewood Cliffs, N.J.
15.
Russell, A. D., and Caselton, W. F. (1988). “Extensions to linear scheduling optimization.”J. Constr. Engrg. and Mgmt., ASCE, 114(1), 36–52.
16.
Russell, A. D., and Wong, W. C. M. (1993). “New generation of planning structures.”J. Constr. Engrg. and Mgmt., ASCE, 119(2), 196–214.
17.
Selinger, S. (1980). “Construction planning for linear projects.”J. Constr. Div., ASCE, 106(2), 195–205.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 127Issue 3June 2001
Pages: 199 - 205

History

Received: Apr 26, 2000
Published online: Jun 1, 2001
Published in print: Jun 2001

Permissions

Request permissions for this article.

Authors

Affiliations

Member, ASCE
Asst. Prof., Dept. of Civ. and Envir. Engrg., Univ. of Illinois at Urbana-Champaign, Urbana, IL 61801.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share