Project Procurement System Selection Model
Publication: Journal of Construction Engineering and Management
Volume 126, Issue 3
Abstract
In the last two decades, there have been significant changes in the technical and economic conditions prevailing in the construction industry. To overcome the shortcomings of the traditional procurement methods, the construction industry has developed a large number of different procurement systems. A systematic approach for selection of the most appropriate system is now needed. This paper presents the development of the project procurement system selection model (PPSSM), which integrates the techniques of the analytic hierarchy process and Parker's judging alternative technique of value engineering into a multicriteria multiscreening system. A survey was conducted in Saudi Arabia with the aim of testing the PPSSM for effectiveness and efficiency and assisting the governmental agencies to select the most appropriate procurement system for implementation of their projects. For this purpose, a questionnaire was developed. On the basis of the synthesis process of the PPSSM, Saudi public clients selected design and build as the most appropriate procurement system for their projects, with an overall priority of 0.496. The outcome of the study demonstrates the effectiveness of PPSSM in helping the client in the construction industry to choose the procurement system that fulfills the needs of the client and the project requirements.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Ashworth, G. (1998). “ELSIE, the quantity surveyor's thinking friend.” Build., June 17, 97; June 20, 60–61; July 1, 50–51.
2.
Bennett, J., and Grice, A. ( 1990). “Procurement systems for building.” Quantity surveying techniques, new directions. BSP Professional Books, Oxford, U.K.
3.
Building Economic Development Committee (BEDC). (1985). Thinking about building, a successful business customer's guide to using the construction industry. National Economics Development Office (NEDO), London.
4.
Contractual Arrangements (Report A-7). (1982). Business Roundtable, New York.
5.
Dyer, R. F., and Forman, E. H. (1991). An analytic approach to marketing decisions. Prentice-Hall, Englewood Cliffs, N.J.
6.
Gordon, C. M. (1994). “Choosing appropriate construction contracting method.”J. Constr. Engrg. and Mgmt., ASCE, 120(1), 196–210.
7.
Ireland, V. (1985). “The role of managerial areas in cost, time and quality performance of high rise commercial building projects.” Constr. Mgmt. and Economics, 3, 59–87.
8.
Masterman, J. W. E. (1992). An introduction to building procurement systems. E & FN Spon, London.
9.
Mohsini, R. A. (1993). “Knowledge-based design of project-procurement process.”J. Comp. in Civ. Engrg., ASCE, 7(1), 107–122.
10.
Parker, D. E. (1985). Value engineering theory. L. D. Miles Foundation, Washington, D.C.
11.
Saaty, T. L. (1994). Fundamentals of decision making and priority theory with the analytic hierarchy process, Vol. VI, RWS Publications, Pittsburgh.
12.
Skitmore, R. M., and Marden, D. E. (1988). “Which procurement system? Towards a universal procurement selection technique.” Constr. Mgmt. and Economics, 6, 71–89.
Information & Authors
Information
Published In
History
Received: Jul 13, 1998
Published online: May 1, 2000
Published in print: May 2000
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.