TECHNICAL PAPERS
Jun 1, 1999

Optimization of Resource Allocation and Leveling Using Genetic Algorithms

Publication: Journal of Construction Engineering and Management
Volume 125, Issue 3

Abstract

Resource allocation and leveling are among the top challenges in project management. Due to the complexity of projects, resource allocation and leveling have been dealt with as two distinct subproblems solved mainly using heuristic procedures that cannot guarantee optimum solutions. In this paper, improvements are proposed to resource allocation and leveling heuristics, and the Genetic Algorithms (GAs) technique is used to search for near-optimum solution, considering both aspects simultaneously. In the improved heuristics, random priorities are introduced into selected tasks and their impact on the schedule is monitored. The GA procedure then searches for an optimum set of tasks' priorities that produces shorter project duration and better-leveled resource profiles. One major advantage of the procedure is its simple applicability within commercial project management software systems to improve their performance. With a widely used system as an example, a macro program is written to automate the GA procedure. A case study is presented and several experiments conducted to demonstrate the multiobjective benefit of the procedure and outline future extensions.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Allam, S. I. G. ( 1998). “Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems.” J. Constr. Mgmt. and Economics, E&FN Spon, 6(2), 93–115.
2.
Davis, E. W., and Patterson, J. H. ( 1975). “A comparison of heuristic and optimum solutions in resource-constrained project scheduling.” Mgmt. Sci., 21(8), 944–955.
3.
Easa, S. (1989). “Resource leveling in construction by optimization.”J. Constr. Engrg. and Mgmt., ASCE, 115(2), 302–316.
4.
Feng, C., Liu, L., and Burns, S. (1997). “Using genetic algorithms to solve construction time-cost trade-off problems.”J. Comp. Civ. Engrg., ASCE, 11(3), 184–189.
5.
Gavish, B., and Pirkul, H. ( 1991). “Algorithms for multi-resource generalized assignment problem.” Mgmt. Sci., 37(6), 695–713.
6.
Goldberg, D. E. ( 1989). Genetic algorithms in search, optimization and machine learning. Addison-Wesley, Reading, Mass.
7.
Harris, R. ( 1978). Resource and arrow networking techniques for construction. Wiley, New York.
8.
Hegazy, T., and El-Zamzamy, H. ( 1998). “Project management software that meet the challenge.” Cost Engrg. J., 4(5), 25–33.
9.
Hegazy, T., and Moselhi, O. (1994). “Analogy-based solution to markup estimation problem.”J. Comp. Civ. Engrg., ASCE, 8(1), 72–87.
10.
Johnson, R. ( 1992). “Resource constrained scheduling capabilities of commercial project management software.” Proj. Mgmt. J., 22(4), 39–43.
11.
Karshenas, S., and Haber, D. ( 1990). “Economic optimization of construction project scheduling.” J. Constr. Mgmt. and Economics, E&FN Spon, 8(2), 135–146.
12.
Li, H., and Loing, P. (1997). “Using improved genetic algorithms to facilitate time-cost optimization.”J. Constr. Engrg. and Mgmt., ASCE, 123(3), 233–237.
13.
Microsoft Project. ( 1995). Reference manual, ver. 4.1 for Windows 95. Microsoft Corporation, Redmond, Wash.
14.
Moselhi, A., and Lorterapong, P. ( 1993). “Least impact algorithm for resource allocation.” Can. J. Civ. Engrg., CSCE, 20(2), 180–188.
15.
Premavera. ( 1995). Reference manual, ver. 1.0 for Windows. Primavera, Bala Cynwyd, Pa.
16.
Shah, K., Farid, F., and Baugh, J. ( 1993). “Optimal resource leveling using integer-linear programming.” Proc., 5th Int. Conf. in Comp. in Civ. & Bldg. Engrg., ASCE, Reston, Va., 1, 501–508.
17.
Talbot, F., and Patterson, J. ( 1979). “Optimal methods for scheduling projects under resource constrains.” Proj. Mgmt. Quarterly, Dec., 26–33.
18.
Wiest, D. ( 1964). “Some properties of schedules for large projects with limited resource.” Operations Res., 12, 395–416.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 125Issue 3June 1999
Pages: 167 - 175

History

Published online: Jun 1, 1999
Published in print: Jun 1999

Permissions

Request permissions for this article.

Authors

Affiliations

Member, ASCE
Asst. Prof. of Constr. Mgmt., Dept. of Civ. Engrg., Univ. of Waterloo, Waterloo, ON, Canada N2L 3G1. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share