Multiskilled Labor Utilization Strategies in Construction
Publication: Journal of Construction Engineering and Management
Volume 124, Issue 6
Abstract
Construction industry craft divisions in the United States are currently based on narrowly defined skill groupings. The steady demand for improved productivity and the shortage of skilled craft workers call into question this traditionally accepted “single-skilled” strategy. While these craft patterns are prevalent throughout the union and nonunionized sectors of the industry, they are not necessarily responsive to construction sequence or the optimal use of worker skills. Alternative labor utilization strategies may provide increased project performance and may reduce craft shortages through better utilization of the existing workforce. An analysis model is developed in this study to measure the project impact of alternative labor utilization strategies. The model is used to assess four multiskilling strategies on the construction of a $70,000,000 project. Benefits of multiskilled labor utilization strategies were demonstrated including potentially a 5–20% labor cost savings, a 35% reduction in required workforce, a 47% increase in average employment duration, and an increase in earning potential for multiskilled construction workers.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Burleson, R. C. (1997). “An analysis of multiskilled labor strategies in construction,” PhD thesis, Univ. of Texas at Austin, Austin, Tex.
2.
Carmichael, L. H., and MacLeod, B.(1993). “Multiskilling, technical change and the Japanese construction firm.”Economic J., 103(416), 142–160.
3.
Cass, D. J. (1992). “Labor productivity impact of varying crew levels.” Trans. Amer. Assn. Cost Engrs., AACE, Morgantown, W.Va., C2.1–C2.9.
4.
Clough, R. H., and Sears, G. (1994). Construction contracting, 6th Ed., John Wiley & Sons, Inc., New York.
5.
Coombes, J. (1990). Real world construction scheduling. Frontier Publishing, Seattle, Wash.
6.
Cross, M. (1996). “Multiskilling brings cost and productivity benefits.”Process Engrg., July.
7.
Ettlie, J. E., and Rezo, E. M.(1992). “Organization integration and process innovation.”Acad. Mgmt. J., 35, 795–827.
8.
Halpin, D. W. (1992). Planning and Analysis of Construction Operations, John Wiley & Sons, New York, 68–96.
9.
Hinze, J. (1991). “Indirect costs of construction accidents.”Source Document 67, Constr. Industry Inst., Austin, Tex.
10.
Krizan, W.(1996). “Labor: Stability survives hiring boom.”Engrg. News Rec., 234(37), 35.
11.
Livesay, H. C.(1996). “Human factors in the innovation process.”Technovations, 16(4), 173–186.
12.
Nallikari, M.(1995). “Multiskilled work teams.”J. Ship Production, 11(4), 239–244.
13.
Nonaka, I.(1990). “Redundant, overlapping, organizations: A Japanese approach to managing the innovation process.”Calif. Mgmt. Rev., 32, 27–28.
14.
Park, K. S.(1996). “Economic growth and multiskilled workers in manufacturing.”J. Labor Econ., 14(2), 254–285.
15.
“Skills based pay and multiskilling.” (1996). IRS Employment Rev., 605, S5–S8.
16.
Stanley, A. (1997). “Benefits, impediments, and limitations associated with the use of multiskilled labor strategies in construction,” MS thesis, Univ. of Texas at Austin, Austin, Tex.
17.
Tatum, D. J.(1989). “Organizing to increase innovation in construction firms.”J. Constr. Engrg. and Mgmt., ASCE, 115(4), 602–617.
18.
“Tax Guide for Small Business.” (1996). Dept. of Treasury Publ. 334, Internal Revenue Service, Washington, D.C.
19.
Thomas, R. H.(1991). “Labor productivity and work sampling: The bottom line.”J. Constr. Engrg. and Mgmt., ASCE, 117(3), 423–444.
20.
U.S. Department of Labor (U.S. DOL). (1988). “Distribution of injuries and illnesses by length of service.”
21.
Villalobos, J. (1997). “Implementation of multiskilling strategies in the construction industry,” MS thesis, Univ. of Texas at Austin, Austin, Tex.
Information & Authors
Information
Published In
Copyright
Copyright © 1998 American Society of Civil Engineers.
History
Published online: Dec 1, 1998
Published in print: Dec 1998
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.