Bidding Practices of Subcontractors in Colorado
Publication: Journal of Construction Engineering and Management
Volume 124, Issue 3
Abstract
Despite their significant role in construction projects, subcontractors have not been given fair attention by industry researchers. The literature contains very few studies focusing on subcontractors' bidding practices. Subcontractors were contacted via a questionnaire to collect information revealing these bidding practices. This study details knowledge of actual subcontractors' bidding practices including the invitation to bid, bid submission, pre- and postbid negotiation, and the relationship with contractors. The results show that contractors' bid invitations are poorly prepared and contain very abstract information. Upon acceptance, a subcontractor prepares and submits quotations to all inviting contractors just a few hours before the main bid opening time. Some subcontractors attempt to induce contractors to divulge other subcontractors' quotations, but the majority of contractors refuse to release such information. On the other hand, some contractors shop for bids after the award of the main contract. All contractors negotiate with subcontractors after the award of the main contract. Timely payments and price fluctuations are the major elements of the negotiations. Suggestions are presented to contractors and subcontractors for improving subcontractors' bidding practices.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Al-Roumi, A. (1994). “Subcontractors bidding practices in Saudi Arabia,” Senior Thesis, Arch. Engrg. Dept., King Fahd Univ. of Petr. and Minerals, Dhahran, Saudi Arabia.
2.
Ayers, C. P. E. (1984). Specification for architecture, engineering and construction. McGraw-Hill Inc., New York, N.Y.
3.
Collier, K. (1987). Fundamentals of construction estimating and cost accounting. Prentice-Hall, Inc., Englewood Cliffs, N. J.
4.
Halpin, D. W., and Woodhead, R. W. (1980). Construction management. John Wiley & Sons, Inc., New York, N.Y.
5.
Hinze, J., and Tracey, A.(1994). “The contractor-subcontractor relationship: the subcontractor's view.”J. Constr. and Mgmt., ASCE, 120(2), 274–287.
6.
Kish, L. (1965). Survey sampling. John Wiley & Sons, Inc., New York, N.Y.
7.
Merritt, F. S., and Ambrose, J. (1990). Building engineering and systems design. Van Nostrand Reinhold, New York, N.Y.
8.
“Recovering damages against a subcontractor.” (1988). Civ. Engrg., 59(3), 40.
9.
Runeson, G., and Uher, T. E. (1984). “Survey of tendering practices in Australian building industry with reference to subcontractors.” The Build. Res. Ctr., School of Build., Univ. of New South Wales.
10.
Shash, A. (1996). “Bidding practices of subcontractors operating in the state of Colorado.” Internal Rep., Constr. Engrg. and Mgmt. Dept., King Fahd Univ. of Petr. and Minerals, Dhahran, Saudi Arabia.
11.
“Shop till they drop.” (1992). Engrg. News Rec., 228(10), 26–28.
Information & Authors
Information
Published In
Copyright
Copyright © 1998 American Society of Civil Engineers.
History
Published online: May 1, 1998
Published in print: May 1998
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.