TECHNICAL PAPERS
Mar 1, 1998

Optimization of Crew Configurations Using Activity-Based Costing

Publication: Journal of Construction Engineering and Management
Volume 124, Issue 2

Abstract

The goal of this research was to develop and illustrate a technique for finding the optimum crew configuration, from a range of possible configurations, assigned to complete a defined quantity of work in a timely and cost-effective manner. The concept of activity-based costing was used to define the scope of the work in terms of the activities to be accomplished and their associated productivity rates and cost of performance. These data are modeled as distributions of random variables. Past experience, as well as local job conditions, can be used to determine the values associated with these distributions. The temporal and logical relationships between the activities are established through a process flowchart. An activity based, stochastic simulation program (ABC-SIM), was used to measure the elapsed time and activity cost for each of the candidate crew configurations. Excess cost is the activity cost minus the shift cost, which is based on the number of full shifts required to accomplish the work multiplied by the cost per shift. Excess cost is a measure of inefficiency caused by crews waiting in queue. Finally, an optimum crew configuration can be selected using an optimization rule that best satisfies project objectives.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
AbouRizk, S., and Halpin, D. (1992). “Statistical properties of construction duration data.”J. Constr. Engrg. and Mgmt., ASCE, 118(3).
2.
Back, W. E., and Bell, L. C. (1995). “Monte Carlo simulation as tool for process reengineering.”J. Mgmt. Engrg., 11(5).
3.
Canada, J., Sullivan, W., and White, J. (1996). Capital investment analysis for engineering and management. Prentice-Hall, Inc., Englewood Clifs, N.J.
4.
Compton, T. (1994). “Using activity-based costing in your organization —parts 1 and 2.”J. Sys. Mgmt., April.
5.
Halpin, D., and Riggs, L. (1992). Planning and analysis of construction operations. John Wiley & Sons, Inc., New York, N.Y.
6.
Liggett, H. R., Trevino, J., and Lavelle, J. P. (1992). “Activity based cost management systems in an advanced manufacturing environment. Economic and financial justification of advanced manufacturing technologies, H. R. Parsaei, ed., Elsevier Science Publishing Co., New York, N.Y.
7.
McCahill D., and Bernold, L. (1993). “Resource oriented modeling and simulation in construction.”J. Constr. Engrg. and Mgmt., 119(3).
8.
O'Guin, M. (1991). The complete guide to activity based costing. Prentice-Hall, Inc., Englewood Cliffs, N.J.
9.
Pare, T. (1993). “A new tool for managing costs.”Fortune, June.
10.
Quillian, L. (1991). “Curing functional silo syndrome with logistics TCM.”Certified Management Accountant, June.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 124Issue 2March 1998
Pages: 162 - 168

History

Published online: Mar 1, 1998
Published in print: Mar 1998

Permissions

Request permissions for this article.

Authors

Affiliations

Donald A. Maxwell
Prof., Dept. of Civ. Engrg., Texas A&M Univ., College Station, TX 77843-3136.
W. Edward Back
Asst. Prof., Dept. of Civ. Engrg., Texas A&M Univ., College Station, TX.
Jeffery Toon
Grad. Asst., Dept. of Civ. Engrg., Texas A&M Univ., College Station, TX.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share