Robust Reliability of Projects with Activity-Duration Uncertainty
Publication: Journal of Construction Engineering and Management
Volume 124, Issue 2
Abstract
Today's projects suffer from high uncertainty, great demand for accelerated speed, and severe scarcity of attention of the project manager. At the same time, the schedules of today's projects are expected to be more reliable than ever. This paper presents a new concept for improving the reliability of a project schedule suffering from uncertainty in the duration of its activities. The paper shows that the technique for applying the new concept requires minimal information, incorporates subjective information, is simple to use, and assists in the preparation of project schedules at a desirable level of reliability. Specific examples demonstrate the use of the technique for: (1) calculating the reliability of the project schedule; (2) enhancing the reliability of the project schedule; (3) reducing project duration without diminishing its reliability; and (4) examining how overlapping of project activities affects its reliability.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Ben-Haim, Y. (1985). The assay of spatially random material. Kluwer, Dordrecht, The Netherlands.
2.
Ben-Haim, Y.(1994). “Convex models of uncertainty: applications and implications.”Erkenntnis: an Int. J. Analytic Philosophy, 41, 139–156.
3.
Ben-Haim, Y. (1996). Robust reliability in the mechanical sciences. Sprinter-Verlag KG, Berlin.
4.
Ben-Haim, Y.(1997). “Robust reliability of structures.”Advances in Appl. Mech., 33, 1–41.
5.
Ben-Haim, Y., and Elishakoff, I. (1990). Convex models of uncertainty in applied mechanics. Elsevier Science Publishers BV, Amsterdam (North-Holland), The Netherlands.
6.
Couillard, J. (1995). “The role of project risk in determining project management approach.”Proj. Mgmt. J., XXII(4), 3–15.
7.
Dinsmore, P. C. (1982). “The project manager's time quandary survey results and suggested solutions.”Proc., Proj. Mgmt. Inst., Toronto, IV-J, 1–9.
8.
Frizelle, G. D. M.(1993). “Model for maximizing the return on capital projects under timing uncertainty.”Int. J. Proj. Mgmt., 11(1), 39–47.
9.
Gong, D., and Hugsted, R.(1993). “Time-uncertainty analysis in project networks with a new merge-event time-estimation technique.”Int. J. Proj. Mgmt., 11(3), 165–174.
10.
Gurbbs, F. E.(1962). “Attempts to validate certain PERT statistics or `picking on PERT'.”Operations Res., 10, 9.
11.
Howell, G. A., Laufer, A., and Ballard, G.(1993). “Uncertainty and project objectives.”Proj. Appraisal, 8(1), 37–43.
12.
Hulett, D. T. (1995). “Project schedule risk assessment.”Proj. Mgmt. J., XXVI(1), 21–31.
13.
Huseby, A. B., and Skogen, S.(1992). “Dynamic risk analysis: the DynRisk concept.”Int. J. Proj. Mgmt., 10(3), 160–164.
14.
Krishnan, V.(1996). “Managing the simultaneous execution of coupled phases in concurrent product development.”IEEE Trans. on Engrg. Mgmt., 43(2), 210–217.
15.
Laufer, A.(1991). “Project planning: timing issues and path of progress.”Proj. Mgmt. J., 22(2), 39–45.
16.
Laufer, A. (1996). Simultaneous management: managing projects in a dynamic environment. AMA-COM, American Management Association.
17.
Laufer, A., and Tucker, R. L.(1987). “Is construction project planning really doing its job? a critical examination of focus, role and process.”Constr. Mgmt. and Economics, 5, 243–266.
18.
Laufer, A., and Tucker, R. L.(1988). “Competence and timing dilemma in construction planning.”Constr. Mgmt. and Economics, 6, 339–355.
19.
Laufer, A., Tucker, R. L., Shapira, A., and Shenhar, A. J.(1994). “The multiplicity concept in construction project planning.”Constr. Mgmt. and Economics, 12(1), 53–66.
20.
Loterapong, P., and Moselhi, O.(1996). “Project-network analysis using fuzzy sets theory.”J. Constr. Engrg. and Mgmt., ASCE, 122, 308–318.
21.
Martin, J. J.(1965). “Distribution of the time through a direct acyclic network.”Operations Res., 13, 48–66.
22.
Meyer, C. (1993). Fast cycle time. The Free Press, New York.
23.
Mintzberg, H. (1973). The nature of managerial work. Harper & Row, Publishers, Inc., New York.
24.
Peters, T. (1989). “Drucker, Ohmae, Porter & Peters,”Special Rep. No. 1202, The Economist, 70.
25.
Shonberger, R. J.(1981). “Why projects are always late: a rationale based on manual simulation of a PERT/CPM network.”Interfaces, 11(5), 66–76.
26.
Simister, S. J.(1994). “Usage and benefits of project risk analysis and management.”Int. J. Proj. Mgmt., 12(1), 5–8.
27.
Smith, P. G., and Reinersten, D. G. (1991). Developing products in half the time. Van Nostrand Reinhold, New York.
28.
Stalk, G., and Hout, T. M. (1990). Competing against time. The Free Press, New York.
29.
Steward, R. (1967). Managers and their jobs. McGraw-Hill, Maidenhead, U.K.
Information & Authors
Information
Published In
Copyright
Copyright © 1998 American Society of Civil Engineers.
History
Published online: Mar 1, 1998
Published in print: Mar 1998
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.