Parametric Constraint Management in Planning and Scheduling: Computational Basis

Publication: Journal of Construction Engineering and Management
Volume 123, Issue 3

Abstract

Critical path methods (CPM) have long been used as the computational basis for computer scheduling systems. The basic computational methodology in CPM proved to be inadequate to represent and integrate more problems in project management. The main reason is that the methodology is built on a computational procedure that is specific to the underlying network representation. Various knowledge-based techniques have been used to provide a richer computational methodology. The main goal of this paper is to describe the computational basis of a constraint-management methodology as applied to planning and scheduling. Each problem may be represented by interrelating its parameters using construction duration and precedence knowledge. The parameter relationships may be viewed as mathematical constraints. The paper provides a description of the computational methodology including the constraint modeling process, the graph representation of constraints, and the evaluation of constraint networks. The methodology may result in multiple solutions based on the nature of graph representation. Therefore, the paper proceeds to prove that only the acceptable computational solution represents the appropriate project plan and schedule. The paper concludes by commenting on the utility of the methodology and providing directions for future research.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Benningson, L. (1971). “The strategy of running temporary projects.”Innovation, (Sept.), 31–41.
2.
Darwiche, A., and Levitt, R. E. (1990). “Project scheduling using lower and upper bounds on temporal distances.” Comp. Sci. and Civ. Engrg. Dept., Stanford Univ., Stanford, Calif.
3.
Darwiche, A., Levitt, R. E., and Hayes-Roth, B.(1988). “OARPLAN: generating project plans by reasoning about objects, actions and resources.”AI EDAM, 2(3), 169–181.
4.
Dean, T. L., and MacDermott, D. V.(1987). “Temporal data base management.”Artificial Intelligence, 32, 1–56.
5.
El-Bibany, H. (1992). “Architecture for human-computer design, management and coordination in a collaborative AEC environment,” PhD thesis, Civ. Engrg. Dept., Stanford Univ., Stanford, Calif.
6.
El-Bibany, H. (1995). “The value of a unified approach to product and process modeling.”Proc., Second ASCE Congr. on Computing in Civ. Engrg.
7.
El-Bibany, H., and Paulson, B. C.(1994). “Collaborative knowledge-integration systems: a tool for AEC design, management and coordination.”Microcomp. in Civ. Engrg., Spec. Issue on Innovative Res., 9(1), 29–40.
8.
Galbraith, J. R. (1974). Organization design. Addison-Wesley Publishing Co., Reading, Mass.
9.
Kelley, J.(1961). “Critical path planning and scheduling: mathematical basis.”Operations Res., 9(3), 296–321.
10.
Levitt, R. E. (1990). “Knowledge-based planning systems: an engineering perspective.”Proc., First Int. Conf. on Expert Plng. Sys., 181–185.
11.
Lynch, T. D. (1996). “A transaction cost framework for evaluating construction project organization,” PhD thesis, Dept. of Arch. Engrg., Penn State Univ., Pa.
12.
Marshall, G., Barber, T. J., and Boardman, J. T.(1987). “Methodology for modelling a project management control environment.”IEE Proc., 134(4), 287–300.
13.
Modder, J., Phillips, C., and Davis, E. (1983). Project management with CPM, PERT and precedence diagramming, 3rd Ed., Van Nostrand Reinhold, New York, N.Y.
14.
Navinchandra, D., Sriram, D., and Logcher, R.(1988). “GHOST: a project network generator.”J. Comp. Civ. Engrg., ASCE, 2(3), 239–254.
15.
Sedgewick, R. (1988). Algorithms, 2nd Ed., Addison-Wesley Publishing Co., Reading, Mass.
16.
Serrano, D. (1987). “Constraint management in conceptual design,” ScD thesis, Massachusetts Inst. of Technol., Cambridge, Mass.
17.
Thompson, J. D. (1967). Organizations in action. McGraw-Hill, Inc., New York, N.Y.
18.
Walker, M., and Sayer, J. (1959). “Project planning and scheduling.”Rep. 6959, duPont Corp., Wilmington, Del.
19.
Zozoya, C., Hendrickson, C., and Rehak, D. (1989). Knowledge-based process planning for construction and manufacturing. Academic Press, Inc., San Diego, Calif.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 123Issue 3September 1997
Pages: 348 - 353

History

Published online: Sep 1, 1997
Published in print: Sep 1997

Permissions

Request permissions for this article.

Authors

Affiliations

Hossam El-Bibany, Associate Member, ASCE
Asst. Prof., Dept. of Arch. Engrg., Penn State Univ., University Park, PA 16802-1416.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share