Introducing a New Concept and Approach to Modeling Construction
Publication: Journal of Construction Engineering and Management
Volume 123, Issue 1
Abstract
Modeling construction is a critical step for understanding it and improving its performance. The thrust of this research paper is the need for the development of valid credible models as a logical precursor to automation. This article reviews the key models used to represent construction. Through this examination, it makes an important distinction between process and system modeling concepts. This distinction is the basis for concluding that no single tool, by itself, is accurately capable of fully modeling both construction system and construction work processes. Thus an integrated approach to modeling is required. Accordingly, the research conducted by the writers utilized a new integrated modeling approach that combines a set of descriptive tools to allow the development of various perspectives of construction. This article presents one of these tools as a new system modeling concept that overcomes deficiencies in current system modeling approaches. The power of this new model is illustrated in a detailed comparison among key current system modeling concepts.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Alexander, M. J. (1974). “Information systems analysis.” Science Research Associates Inc., Kingsport, Tenn.
2.
Ballard, G., Howell, G., and Kartam, S. (1994). “Redesigning job site planning systems.”Proc. ASCE 1st Congr. on Comp. in Civ. Engrg., ASCE, New York, N.Y.
3.
Chung, E. K. (1989). “A survey of process modeling tools.”Tech. Rep. No. 7, Comp. Integrated Constr. Res. Program, Dept. of Arch. Engrg., Pennsylvania State Univ., University Park, Pa.
4.
Kartam, S. (1994). “Modeling and evaluating construction planning systems through the last planner level,” ME dissertation, Univ. of California, Berkeley, Calif.
5.
Kartam, S. (1995). “Re-engineering construction planning systems,” PhD dissertation, Univ. of California, Berkeley, Calif.
6.
Kartam, S., and Ibbs, W.(1996). “Re-engineering tools: the `CPR' system models.”Int. J. Proj. Mgmt., 14(6), 359–365.
7.
Kartam, S., Ibbs, W., and Ballard, G. (1995). “Re-engineering construction planning.”Proj. Mgmt. J., Proj. Mgmt. Inst., Pa.
8.
Koskela, L. (1992). “Application of the new production philosophy to construction.”Tech. Rep. No. 72, Ctr. for Integrated Fac. Engrg., Stanford University, Stanford, Calif.
9.
Sanvido, V. E. (1984). “A framework for designing and analyzing management and control systems to improve the productivity of construction projects.”Tech. Rep. No. 282, Dept. of Civ. Engrg., Stanford University, Stanford, Calif.
10.
Shingo, S. (1988). Non-stock production: the Shingo system for continuous improvement. Productivity Press Inc., Cambridge, Mass.
11.
SofTech Inc. (1979). “An introduction to SADT: structure analysis and design technique.”
12.
Walker, A. (1985). “Project management in construction.” Collins P. and T. Books, New York, N.Y.
Information & Authors
Information
Published In
Copyright
Copyright © 1997 American Society of Civil Engineers.
History
Published online: Mar 1, 1997
Published in print: Mar 1997
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.