Culture of Using Mobile Cranes for Building Construction
Publication: Journal of Construction Engineering and Management
Volume 122, Issue 4
Abstract
While tower cranes traditionally are identified with high-rise, congested urban building construction, and mobile cranes primarily are associated with heavy civil and infrastructure construction, there exists a vast population of building projects where both are feasible. The question, then, is: why are different crane types used under similar project conditions in different geographic areas (e.g., tower cranes in Europe, mobile cranes in the United States)? This paper examines the culture of using mobile cranes for building construction, as observed in the southwestern United States. Project-specific and environmental characteristics are identified, classified, and described, while comparatively relating to tower crane practice. The role of non–project-specific factors (such as planning culture, operating style, employment patterns, and market organization) is emphasized in shaping the mobile crane culture. A rather homogeneous population of projects with distinct features, such as short construction duration, spacious sites, and supportive terrain, creates the grounds for this culture's evolution. Understanding the relationships between and within project and environmental characteristics is vital for a construction market that is becoming global and for a fresh examination of traditional equipment selection practices.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Dickie, D. E. (1991). “Who's responsible? Guidelines for mobile crane operations.”Lift Equipment, Feb.-March, 27–29.
2.
Harris, F. (1989). Modern construction equipment and methods . Longman Scientific and Technical, Harlow, Essex, U.K.
3.
Laufer, A., Shapira, A., Cohenca-Zall, D., and Howell, G. A.(1993). “Prebid and preconstruction planning process.”J. Constr. Engrg. Mgmt., ASCE, 119(3), 426–444.
4.
Nunnally, S. W. (1993). Construction methods and management, 3rd Ed., Regents/Prentice Hall, Englewood Cliffs, N.J.
5.
Peurifoy, R. L., and Ledbetter, W. B. (1985). Construction planning, equipment and methods, 4th Ed., McGraw-Hill, New York, N.Y.
6.
Peurifoy, R. L., Ledbetter, W. B., and Schexnayder, C. J. (1996). Construction planning, equipment and methods, 5th Ed., McGraw-Hill, New York, N.Y.
7.
Shapiro, L. K., and Shapiro, H. I.(1988). “Construction cranes.”Sci. Am., 258(3), 54–61.
8.
Shapiro, H. I., Shapiro, J. P., and Shapiro, L. K. (1991). Cranes and derricks, 2nd Ed., McGraw-Hill, New York, N.Y.
Information & Authors
Information
Published In
Copyright
Copyright © 1996 American Society of Civil Engineers.
History
Published online: Dec 1, 1996
Published in print: Dec 1996
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.