Modeling Project Performance for Decision Making

Publication: Journal of Construction Engineering and Management
Volume 122, Issue 3

Abstract

This paper presents a performance modeling methodology for application to individual projects. The model combines experience captured from experts with assessments from the project team. The methodology consists of a conceptual, qualitative-model structure and a mathematical-model structure. The conceptual-model structure, called the general performance model (GPM), is a simplified model of the variables and interaction that influence project performance. The mathematical model uses concepts of cross-impact analysis and probabilistic inference to capture the uncertainties and interactions among project variables. The GPM allows management to test different combinations of project-execution options and predict expected cost, schedule, and other performance impacts. The methodology provides a systematic and structured process for a project-team discussion on relevant planning issues in a project. Researchers should benefit from the exploratory and analytical capabilities of the methodology, as well as the flexible knowledge structure to update models and data. Computer implementation is also attractive as a means to disseminating research results.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Alarcón-Cárdenas, L. F. (1992). “Project performance modeling: a methodology for evaluating project execution strategies,” PhD dissertation, Dept. of Civil Engineering, University of California, Berkeley.
2.
Alarcón-Cárdenas, L. F., and Ashley, D. B. (1992). “Project performance modeling: a methodology for evaluation project execution strategies.”Rep. Prepared for Constr. Industry Inst., Univ. of Texas at Austin; Source Document 80 .
3.
Ashley, D. B., and Alarcón-Cárdenas, L. F. (1990). “A pilot study on construction incentives.”Rep. Prepared for CII Proj. Team Risk/Reward Task Force.
4.
Bennett, P. (1980). “Reflections on construction productivity.”Constr. Productivity Frontiers, Technol., 5–9.
5.
Business Roundtable. (1983). “More construction for the money: summary report of the construction industry cost effectiveness project.” New York, N.Y.
6.
Chung, E. K. (1989). “A survey of process modeling tools.”Tech. Rep. No. 7, Comp. Integrated Constr. Res. Program, Dept. of Arch. Engrg., Pennsylvania State Univ., University Park, PA.
7.
Craver, J. K. (1973). “A practical method for technology assessment.”Proc., 1st Conf. on Technol. Assessment .
8.
Construction Review. (1987). U.S. Department of Commerce, Washington, D.C. (July–Aug.).
9.
Enzer, S. (1983). Interax-interactive analysis for strategic planning . Ctr. for Futures Res., Univ. of Southern California.
10.
Gordon, T., and Hayward, H.(1968). “Initial experiments with the cross-impact method of forecasting.”Futures, 1(2), 100–116.
11.
Gordon, T., Rochberg, R., and Enzer, S. (1970). “Research on cross-impact techniques with selected problems in economics, political science and technology assessment.” Inst. for the Future, Menlo Park, Calif.
12.
Gregerman, I. B. (1981). “Worker productivity-characteristics and measurement.”AACE Trans., I.2.1–I.2.5.
13.
Honton, E. J., Stacey, G. S., and Millett, S. M. (1985). “Future scenarios: the BASICS computational method.” Battelle, Columbus Div., Ohio.
14.
Judson, A. S.(1982). “The awkward truth about productivity.”Harvard Business Rev., 82(5), 93–97.
15.
Kim, J. H., and Pearl, J. (1983). “A computational model for causal and diagnostic reasoning in inference systems.”Proc., 8th Int. Joint Conf. on Artificial Intelligence, Vol. 1, 190–193.
16.
Moder, J. J., Phillips, C. R., and Davis, E. W. (1983). Project management with CPM, PERT and precedence diagramming, 3rd Ed., Van Nostrand Reinhold, New York, N.Y.
17.
Pearl, J.(1987). “Evidential reasoning using stochastic simulation of causal models.”Artificial Intelligence, 32, 245–257.
18.
Porter, A., Roper, T., Mason, T., Rossini, F., Banks, J., and Bradley, J. (1991). Forecasting and management of technology . John Wiley & Sons, Inc., New York, N.Y.
19.
Sanvido, V. E., and Medeiros, D. J. (1990). “Applying computer-integrated manufacturing concepts to construction.”J. Constr. Engrg. and Mgmt., ASCE, 116(2).
20.
Sanvido, V. E., Kumara, S., and Ham, I.(1989). “A top-down approach to integrating the building process.”Engrg. with Comp., 5, 91–103.
21.
Sink, D. S. (1985). Productivity management: planning, measurement and evaluation, control and improvement . John Wiley & Sons, Inc., New York, N.Y.
22.
Stover, J., (1975). “The use of probabilistic system dynamics in the analysis of national development policies: a study of economic growth and income distribution in Uruguay.”Proc., 1975 Summer Comp. Simulation Conf.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 122Issue 3September 1996
Pages: 265 - 273

History

Published online: Sep 1, 1996
Published in print: Sep 1996

Permissions

Request permissions for this article.

Authors

Affiliations

Luis F. Alarcón
Assoc. Prof. and Head, Dept. of Constr. Engrg. and Mgmt., Universidad Católica de Chile, Escuela de Ingeniería, Casilla 306, Correo 22, Santiago, Chile.
David B. Ashley, Member, ASCE
Taisei Prof. and Chair of Civ. and Envir. Engrg., Univ. of California, Berkeley, 760 Davis Hall, Berkeley, CA 94720-1710.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share