COMPASS—New Paradigm for Project Cost Control Strategy and Planning
Publication: Journal of Construction Engineering and Management
Volume 122, Issue 3
Abstract
The need to remain competitive while generating profit requires management to develop innovative cost management strategies that will allow them to distinguish and control early-on factors that might adversely impact the cost of a project. This paper describes a decision support system, COMPASS (Cost Management Planning Support System) for project cost control strategy and planning. Throughout the life cycle of a project, COMPASS methodology assists management in evaluating the potential degree of cost escalation. It also identifies attributes such as management errors, regulatory approval, and error/rework, that might be the cause for project cost escalation. Furthermore, COMPASS assists management in formulating a cost control strategy while utilizing their experience and past project performance data. The attributes identified by the cost control strategy, if controlled, would minimize the expected loss (i.e., project cost escalation).
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Abu-Hijleh, S. F., and Ibbs, C. W.(1993). “Systematic automated management exception reporting.” J. Constr. Engrg. and Mgmt., ASCE, 119(1), 87–104.
2.
Ahuja, H. N. (1980). Successful construction cost control . John Wiley & Sons, Inc., New York, N.Y.
3.
Benjamin, J. R., and Cornell, C. A. (1970). Probability, statistics, and decision for civil engineers . McGraw-Hill Book Co., New York, N.Y.
4.
Berger, J. O. (1985). Statistical decision theory and bayesian analysis . Springer-Verlag, New York, N.Y.
5.
Diekmann, J. J.(1983). “Probabilistic estimating: mathematics and applications.”J. Constr. Engrg. and Mgmt., ASCE, 109(3), 297–308.
6.
Ghiaseddin, N. (1987). “Characteristics of a successful DSS user's needs vs. builder's needs.”Decision support systems: theory and application. NATO ASI Series, Vol. F31, C. W. Holsapple and A. B. Whinston, eds., Springer-Verlag KG, Berlin.
7.
Halpin, D. W. (1985). Financial & cost concepts for construction management . John Wiley & Sons, Inc., New York, N.Y.
8.
Hastak, M. (1994). “Decision support system for project cost control strategy and planning,” PhD thesis, Purdue Univ., West Lafayette, Ind.
9.
Herbsman, Z.(1983). “Long-range forecasting highway construction costs.”J. Constr. Engrg. and Mgmt., ASCE, 109(4), 423–434.
10.
Logcher, R. D. (1987). “Adding knowledge based systems technology to project control systems,”Project controls: needs and solutions, Proc., Spec. Conf. of Constr. Div. of ASCE, ASCE, New York, N.Y., 76–87.
11.
Paulson, B. C. Jr.(1975). “Estimating and controlling construction labor costs.”J. Constr. Div., ASCE, 101(3), 623–633.
12.
Raiffa, H. (1968). Decision analysis: introductory lectures on choices under uncertainty . Random House, New York, N.Y.
13.
Stukhart, G. (1984). “Cost management report: the business roundtable project.”1984 Trans., AACE, AACE, Morgantown, W.Va. C.1.1–C.1.5.
14.
Touran, A.(1993). “Probabilistic cost estimating with subjective correlations.”J. Constr. Engrg. and Mgmt., ASCE, 119(1), 58–71.
Information & Authors
Information
Published In
Copyright
Copyright © 1996 American Society of Civil Engineers.
History
Published online: Sep 1, 1996
Published in print: Sep 1996
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.