TECHNICAL PAPERS
Sep 1, 1996

Comparison of Construction Alternatives Using Matched Simulation Experiments

Publication: Journal of Construction Engineering and Management
Volume 122, Issue 3

Abstract

The comparison of alternative construction methods is one of the principal reasons for using simulation to model construction processes. The efficiency and effectiveness of such comparisons can be greatly improved by the prudent use of “matched pairs,” a variance reduction technique based on dedicated and fully synchronized random number streams. The basic methodology is illustrated by using the STROBOSCOPE simulation system to compare two alternative construction methods for rock tunneling [Conventional versus the New Austrian Tunneling Method (NATM)]. For this example the effects are dramatic. The probability of identifying and choosing the cheaper construction method based on a single run increases from 55% to 96%, the variance of the cost difference decreases by two orders of magnitude, and the 95% confidence interval for the true cost difference given by 4,000 independent runs can be obtained by performing only seven replications using matched pairs. Besides this improvement in statistical efficiency, the use of matched pairs is a necessity for this example in order to compare the alternatives on a logical and equitable basis.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations . John Wiley & Sons, Inc., New York, N.Y.
2.
Ioannou, P. G. (1987). “Geologic prediction model for tunneling.”J. Constr. Engrg. and Mgmt., ASCE, (113)4, 569–590.
3.
Ioannou, P. G. (1989a). “Evaluation of subsurface exploration programs.”J. Constr. Engrg. and Mgmt., ASCE, (115)3, 339–356.
4.
Ioannou, P. G. (1989b). “UM-CYCLONE, discrete-event simulation system.”Tech. Rep. UMCE 89-11, 89-12, Dept. of Civ. Engrg., Univ. of Michigan, Ann Arbor, Mich.
5.
Ioannou, P. G., and Martinez, J. C. (1995). “Evaluation of alternative construction processes using simulation.”Proc., 1995 Constr. Congr., ASCE, New York, N.Y.
6.
Law, A. M., and Kelton, W. D. (1991). Simulation modeling and analysis, 2nd Ed., McGraw-Hill Book Co., Inc., New York, N.Y.
7.
Martinez, J. C. (1996). “STROBOSCOPE—stateand resource-based simulation of construction processes,” PhD thesis, Dept. of Civ. and Envir. Engrg., Univ. of Michigan, Ann Arbor, Mich.
8.
Martinez, J. C., and Ioannou, P. G. (1994). “General purpose simulation with STROBOSCOPE.”Proc., 1994 Winter Simulation Conf., Inst. of Electr. and Electronics Engrs. (IEEE), Piscataway, N.J., 1159–1166.
9.
Martinez, J. C., and Ioannou, P. G. (1995). “Advantages of the activity scanning approach in modeling complex construction processes.”Proc., 1995 Winter Simulation Conf., Inst. of Electr. and Electronics Engrs. (IEEE), Piscataway, N.J., 1024–1031.
10.
Martinez, J. C., Ioannou, P. G., and Carr, R. I. (1994). “Stateand resource-based construction process simulation.”Proc., ASCE 1st Congr. on Computing in Civ. Engrg., ASCE, New York, N.Y.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 122Issue 3September 1996
Pages: 231 - 241

History

Published online: Sep 1, 1996
Published in print: Sep 1996

Permissions

Request permissions for this article.

Authors

Affiliations

Photios G. Ioannou, Associate Member, ASCE,
Assoc. Prof., Civ. and Envir. Engrg. Dept., Univ. of Michigan, Ann Arbor, MI 48109-2125.
Julio C. Martinez
PhD Candidate, Civ. and Envir. Engrg. Dept., Univ. of Michigan, Ann Arbor, MI.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share