The environmental-cleanup market offers new and emerging business opportunities for the construction industry. However, these opportunities present substantial risks to contractors that decide to engage in cleaning up hazardous and toxic waste (HTW) sites. These risks can be attributed to the uncertainties of the technological and legal environment. Of all the risks present in this type of work, legal liability may be the most daunting. The intent of this paper is to provide a structured methodology to estimate risks associated with Superfund cleanup during construction and to quantitatively relate them to potential contractor liability. A decision-analysis technique that incorporates features from influence diagrams and decision trees was used to develop a model that estimates a contractor's liability. This model was developed through eliciting information from five industry experts. These experts are knowledgeable regarding the variables influencing events that effect a contractor's liability. The developed model is implemented in DPL, a decision software package, and applied to an actual Superfund project.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Call, H. J., and Miller, W. A.(1990). “A comparison of approaches and implementations for automating decision analysis.”Reliability Engrg. and Sys. Safety, 30, 115–162.
2.
Construction Industry Institute Design Task Force. (1986). “Evaluation of design effectiveness.”Publ. 8-1, Univ. of Texas at Austin, Tex.
3.
Decision programming language. (1993). Applied Decision Analysis, Inc., Menlo Park, Calif.
4.
De Neufville, R. (1990). Applied systems analysis . McGraw-Hill, New York, N.Y.
5.
Franco, A. J.(1990). “Pricing hazardous-waste risk.”J. Mgmt. in Engrg., ASCE, 6(1), 76–86.
6.
Franco, A. J.(1991). “Pricing hazardous-waste risk revisited.”J. Mgmt. in Engrg., 7(4), 428–440.
7.
Jeljeli, M. N. (1994). “A risk-based methodology for estimating contractors' liability in Superfund cleanup construction,” PhD theses, Univ. of Wisconsin at Madison, Wis.
8.
Jeljeli, M. N., and Russell, J. S.(1993). “Surety bonds for hazardous and toxic waste construction.”Constr. Business Rev., 3(4), 72–75.
9.
Littlefield, T. K., and Randolph, P. H.(1987). “An answer to Sasieni question on PERT times.”Mgmt. Sci., 33(10), 1357–1359.
10.
Miller, A. C., and Rice, T. R.(1983). “Discrete approximations of probability distributions.”Mgmt. Sci., 29(3), 352–362.
11.
Office of Technology Assessment. (1985). “Superfund strategy.” Rep., OTA-ITE-252, Washington, D.C.
12.
Oliver, R. M., and Smith, J. Q. (1990). Influence diagrams, belief nets and decision analysis . John Wiley & Sons, New York, N.Y.
13.
Reinis, S. (1993). “Risks requires probabilistic approach to remedy selection for environmental cleanup projects.”CM Advisor, (Aug./Sept.), 10–12.
14.
Remmen, A. (1977). The contract bond book, The National Underwriters Co., Cincinnati, Ohio.
15.
Sasieni, M. W.(1986). “A note on PERT times.”Mgmt. Sci., 32(12), 1652–1653.
16.
U.S. Army Corps of Engineers. (1988a). “Preliminary guidelines for selection and design of remedial systems for uncontrolled hazardous waste sites.”Rep., EC 1110-2-244, Washington, D.C.
17.
U.S. Army Corps of Engineers. (1988b). Standard handbook of hazardous waste and disposal . Washington, D.C.
18.
U.S. Environmental Protection Agency. (EPA). (1985). “Guidance on feasibility studies under CERCLA.”Rep., EPA/540/G-85/003, Washington, D.C.
19.
U.S. Environmental Protection Agency. (1990). “Record of decision: selected remedial alternative for the Onalaska municipal landfill site.”Rep., LaCrosse, Wis.
20.
U.S. Environmental Protection Agency. (1992). “Construction assurance plan for Onalaska municipal landfill site.”Rep., WA 38-5NL5, LaCrosse, Wis.
Information & Authors
Information
Published In
Copyright
Copyright © 1995 American Society of Civil Engineers.
History
Published online: Dec 1, 1995
Published in print: Dec 1995
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.