Graphical-Based Method for Transient Evaluation of Construction Operations
Publication: Journal of Construction Engineering and Management
Volume 121, Issue 2
Abstract
Construction operations involve complex resource interactions and are typically performed in the field with exogenous factors such as inclement weather conditions and equipment breakdowns. The complexity of resource interactions combined with external factors creates a transient environment for construction operations. This research uses computer simulation techniques and a graphical method, DISCO (Dynamic Interface for Simulation of Construction Operations), for the evaluation of the transient effects of construction operations. DISCO uses the CYCLONE schematic model diagram of a process as the modeling framework and allows breaks or interruptions in the simulation run and stopping of the simulation time clock to investigate the transient states of resources and tasks in a process. The scope of the study focuses mainly on the transient effects caused by the process mobilization of construction operations every day. Two construction operations are used as case studies for the investigation. Results of the study and observations are discussed.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Bernold, L. E. (1985). “Productivity transients in construction processes,” PhD thesis, Georgia Institute of Technology, Atlanta, Ga.
2.
Bernold, L. E.(1989). “Simulation of nonsteady construction processes.”J. Constr. Engrg. and Mgmt., ASCE, 115(2), 163–178.
3.
Bratley, P., Fox, B., and Schrage, L. (1987). A guide to simulation. Springer-Verlag, New York, N.Y.
4.
Halpin, D. W. (1990a). MicroCYCLONE user's manual . Learning Systems, Inc., West Lafayette, Ind.
5.
Halpin, D. W. (1990b). MicroCYCLONE system manual. Div. of Constr. Engrg. and Mgmt., Purdue University, West Lafayette, Ind.
6.
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations. John Wiley and Sons, New York, N.Y.
7.
Huang, R.-Y. (1991). “Using simulation for analysis of shift effects,” MSc independent study, Purdue University, West Lafayette, Ind.
8.
Huang, R.-Y. (1994). “A graphical-based method for transient evaluation of construction operations,” PhD thesis, Purdue University, West Lafayette, Ind.
9.
Huang, R.-Y., and Halpin, D. W. (1993). DISCO user's guide . Div. of Constr. Engrg. and Mgmt., Purdue University, West Lafayette, Ind.
10.
Huang, R.-Y., and Halpin, D. W.(1994). “Visual construction operations simulation—the DISCO approach.”J. Microcomp. in Civ. Engrg., 9, 175–184.
11.
Tavakoli, A. (1983). “Productivity analysis of heavy construction operations,” PhD thesis, Georgia Institute of Technology, Atlanta, Ga.
Information & Authors
Information
Published In
Copyright
Copyright © 1995 American Society of Civil Engineers.
History
Published online: Jun 1, 1995
Published in print: Jun 1995
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.