TECHNICAL PAPERS
Mar 1, 1995

Economic Benefits of Lightweight versus Conventional Construction Methods

Publication: Journal of Construction Engineering and Management
Volume 121, Issue 1

Abstract

This paper offers an economic comparison between two construction methods, lightweight and conventional. The first aspects to be compared are the initial and life-cycle ( LC ) costs. Due to the infrequency of lightweight construction in Israel before the beginning of this decade, and the consequent uncertainty regarding its cost-related data, the lightweight method was examined in three different ways. It is shown that costs are relatively similar for the two methods. The influence of the duration of construction is investigated next. The shorter time requirement of the lightweight method enables the construction industry to provide more housing solutions at a faster rate; this paper presents a simplified, yet sufficiently accurate, assessment of this quantitative advantage, which comprises three elements: the benefit accruing from early exploitation of the facility, saving in time-dependent site overhead expenses, and the capital cost of a faster cash outflow. It is shown that, subject to various assumptions, the net benefit of the shorter construction period is 3%–9% of its initial cost, or 2%–6% of the LC cost. The influence of the lower man-hour input is also investigated against the background of the 30,000–40,000 labor shortage forecast for this decade in Israel. It is shown that the advantage of the lightweight method versus the conventional one increases with wage escalation. The influence of the lower man-hour input on the industry's output potential, and the ability to compensate for labor shortage are also discussed.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Alweil, A. (1990). Maintenance management manual: instructions and data. Nat. Build. Res. Inst., Technion, Haifa, Israel (in Hebrew).
2.
Alweil, A., and Bal, H. (1992). An engineering economic comparison between lightweight and conventional construction. Nat. Build. Res. Inst., Technion, Haifa, Israel (in Hebrew).
3.
Au, T., and Au, T. P. (1992). Engineering economics for capital investment analysis. Prentice Hall, Englewood Cliffs, N.J.
4.
Construction cost data. (1991). Dekel, Haifa, Israel (in Hebrew).
5.
Means building construction cost data. (1990a). R. S. Means Co., Kensington, Mass.
6.
Means residential cost data. (1990). R. S. Means Co., Kensington, Mass.
7.
Navon, R. (1992). Comparison between lightweight and conventional construction: economic benefits and drawbacks. Nat. Build. Res. Inst., Technion, Haifa, Israel (in Hebrew).
8.
Navon, R., Goldman, A., and Bal, A. (1992b). Technological and managerial study of construction methods. Nat. Build. Res. Inst., Technion, Haifa, Israel (in Hebrew).
9.
Peer, S. (1987). Analysis of overhead costs and financial ratios for a construction company. Nat. Build. Res. Inst., Technion, Haifa, Israel (in Hebrew).
10.
Peer, S., and Warszawski, A.(1972). “Economic analysis of housing construction methods.”J. Constr. Div., ASCE, 98(2), 287–294.
11.
Stiglitz, J. E. (1988). Economics of the public sector. W. W. Norton & Co., New York, N.Y.
12.
Warszawski, A., Rosenfeld, Y., and Segal, D. (1989). Forecast of labor requirement in the Israeli construction industry 1990–2000. Nat. Build. Res. Inst., Technion, Haifa, Israel (in Hebrew).

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 121Issue 1March 1995
Pages: 27 - 36

History

Published online: Mar 1, 1995
Published in print: Mar 1995

Permissions

Request permissions for this article.

Authors

Affiliations

Ronie Navon, Member, ASCE
Feld Academic Sr. Lect., Dept. of Civ. Engrg., Technion, Nat. Build. Res. Inst., Technion City, 32000 Haifa, Israel.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share