TECHNICAL PAPERS
Dec 1, 1993

Scheduling of Repetitive Projects with Cost Optimization

Publication: Journal of Construction Engineering and Management
Volume 119, Issue 4

Abstract

Existing dynamic programming formulations are capable of identifying, from a set of possible alternatives, the optimum crew size for each activity in a repetitive project. The optimization criterion of these formulations is, however, limited to the minimization of the overall duration of the project. While this may lead to the minimization of the indirect cost of the project, it does not guarantee its overall minimum cost. The objective of this paper is to present a model that incorporates cost as an important decision variable in the optimization process. The model utilizes dynamic programming and performs the solution in two stages: first a forward process to identify local minimum conditions, and then a backward process to ensure an overall minimum state. In the first stage, a process similar to that used in time‐cost trade‐off analysis is employed, and a simple scanning and selecting process is used in the second stage. An example project from the literature is analyzed in order to demonstrate the use of the model and its validity, and illustrate the significance of cost as a decision variable in the optimization process.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ahuja, H. N. (1984). Project management. John Wiley and Sons, Inc., New York, N.Y.
2.
Al Sarraj, Z. M. (1990). “Formal development of line‐of‐balance technique.” J. Constr. Engrg. and Mgmt., ASCE, 116(4), 689–704.
3.
Arditi, D., and Albulak, M. Z. (1979). “Comparison of network analysis with line of balance in a linear repetitive construction project.” Proc. Sixth INTERNET Congress, Vol. 2, Garmisch‐Partenkirchen, Munchen, Germany, 13–25.
4.
Arditi, D., and Albulak, M. Z. (1986). “Line‐of‐balance scheduling in pavement construction.” J. Constr. Engrg. and Mgmt., ASCE, 112(3), 411–424.
5.
Carr, R. I., and Meyer, W. L. (1974). “Planning construction of repetitive building units.” J. Constr. Div., ASCE, 100(3), 403–412.
6.
Chrzanowski, E. N., and Johnston, D. W. (1986). “Application of linear scheduling.” J. Constr. Engrg. and Mgmt., ASCE, 112(4), 476–491.
7.
Johnston, D. W. (1981). “Linear scheduling method for highway construction.” J. Constr. Div., ASCE, 107(2), 247–261.
8.
Lumsden, P. (1968). The line of balance method. Pergamon, Telgamon Press Ltd., London, England.
9.
Means building construction cost data. (1991). 49th Ed., R. S. Means Co., Inc., Kingston, Mass.
10.
Programming house building by line of balance. (1966). National Building Agency, London, England.
11.
Reda, R. (1990). “RPM: repetitive project modelling.” J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316–330.
12.
Russell, A. D., and Caselton, W. F. (1988). “Extensions to linear scheduling optimization.” J. Constr. Engrg. and Mgmt., ASCE, 114(1), 36–52.
13.
Selinger, S. (1980). “Construction planning for linear projects.” J. Constr. Div., ASCE, 106(2), 195–205.
14.
Vorster, M. C., and Bafna, T. (1992). Discussion of “Formal development of line‐of‐balance technique,” by Z. M. Al Sarraj. J. Constr. Engrg. and Mgmt., ASCE, 118(1), 210–211.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 119Issue 4December 1993
Pages: 681 - 697

History

Received: Jul 9, 1992
Published online: Dec 1, 1993
Published in print: Dec 1993

Permissions

Request permissions for this article.

Authors

Affiliations

Osama Moselhi, Member, ASCE
Prof., Constr. Engrg. and Mgmt., Ctr. for Building Studies, Concordia Univ., 1455 de Maisonneuve Blvd. W., Montreal, Canada H3G 1M8
Khaled El‐Rayes
Grad. Student, Ctr. for Building Studies, Concordia Univ., 1455 de Maisonneuve Blvd. W., Montreal, Canada H3G 1M8

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share