TECHNICAL PAPERS
Sep 1, 1993

Resource‐Oriented Modeling and Simulation in Construction

Publication: Journal of Construction Engineering and Management
Volume 119, Issue 3

Abstract

In modeling for simulation, the proper representation of crucial real‐world variables is of prime importance. This paper describes the creation of a model that allows simulation of the construction process to be conducted in a simple fashion, in the field, and in a way that is oriented to the attributes of the specific resources available for the process. The developed model uses resources and their attributes as variables. This allows for consideration of resources of different sizes for the same work task, calculation of running task durations during simulation, rule‐based release of resources from queues, and maintenance of detailed statistics on each type and size of resource used in the system. Experimentation with established equipment mixes and conditions as shown in published handbooks for earthwork processes has verified the capability of the system to predict production rates for differing equipment mixes and site conditions.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ashley, D. B. (1980). “Simulation of repetitive unit construction.” J. Constr. Div., ASCE, 106(2), 185–194.
2.
Bernold, L., and Halpin, D. W. (1986). “Advanced microcomputer simulation for construction managers.” Proc., 4th Conf. on Computing in Civ. Engrg., ASCE, New York, N.Y., 762–772.
3.
Burger, J. H. (1980). Baseline data for comparison of earthmoving equipments. Navy Civil Engineering Laboratory, Port Hueneme, Calif.
4.
Caterpillar performance handbook. (1987). Caterpillar Inc., Peoria, Ill.
5.
Chang, D. Y., and Carr, R. I. (1987). “RESQUE: A resource oriented simulation system for multiple resource constrained processes.” Proc., Seminar/Symp., Project Management Institute Milwaukee, Wisc., 4–19.
6.
Clemmins, J. P., and Willenbrock, J. H. (1978). “The SCRAPESIM computer simulation.” J. Constr. Div., ASCE, 104(4), 419–435.
7.
Halpin, D. W. (1977). “CYCLONE—method for modeling job site processes.” J. Constr. Div., ASCE, 103(3), 489–499.
8.
Halpin, D. W., and Woodhead, R. W. (1976). Design of construction and process operations. John Wiley and Sons, Inc., New York, N.Y.
9.
Halpin, D. W., and McCahill, D. F. (1986). “Modeling construction operations in the classroom.” Proc., 4th Conf. on Computing in Civ. Engrg., ASCE, New York, N.Y., 379–397.
10.
Ibbs, C. W. (1987). “Future directions for computerized construction research.” J. Constr. Engrg. and Mgmt., ASCE, 112(3), 326–345.
11.
Kalk, A., Douglas, S. A., and Paulson, B. C. (1986). “Insight: Interactive simulation of construction operations using graphical techniques.” Tech. Rep. No. 238, 2nd Ed., Stanford University, Stanford, Calif.
12.
Kavanagh, D. P. (1985). “SIREN: A repetitive construction simulation model.” J. Constr. Engrg. and Mgmt., ASCE, 111(3), 308–323.
13.
Kim, J. J., and Ibbs, C. W. (1988). “Assessing vectorized construction simulation performance.” Proc., 5th Conf. on Computing in Civ. Engrg., ASCE, New York, N.Y., 171–181.
14.
Lluch, J., and Halpin, D. W. (1982). “Construction operations and microcomputers.” J. Constr. Div., ASCE, 107(1), 129–145.
15.
Neil, J. M. (1982). Construction cost estimating for project control. Prentice‐Hall, Inc., Englewood Cliffs, N.J.
16.
Moavenzadeh, F., and Markow, M. J. (1976). “Simulation model for tunnel construction costs.” J. Constr. Div., ASCE, 102(1), 51–66.
17.
Paulson, B. C. Jr., Chan, W. T., and Koo, C. C. (1987). “Construction operations simulation by microcomputer.” J. Constr. Engrg. and Mgmt., ASCE, 113(2), 302–314.
18.
Paulson, B. C. Jr. (1978). “Interactive graphics for simulating construction operations.” J. Constr. Div., ASCE, 104(1), 69–75.
19.
Pilcher, R., and Flood, I. (1984). “The use of simulation models in construction.” Proc. Instn. Civ. Engrs., Part 1(76), 635–652.
20.
Pritsker, A. A. B. (1977). Modeling and analysis using q‐gert networks. John Wiley and Sons, Inc., New York, N.Y.
21.
Riggs, L. S. (1980). “Simulation of construction operations.” J. Constr. Div., ASCE, 106(3), 145–163.
22.
Springston, P. S. (1978). “Earthwork construction in support of a marine amphibious force.” Rep., TN No. N‐1514, Navy Civil Engineering Laboratory, Port Hueneme, Calif.
23.
Tavakoli, A. (1985). “Productivity analysis of construction operations.” J. Constr. Engrg. and Mgmt., ASCE, 111(1), 31–39.
24.
Willenbrock, J. H. (1972). “Estimating costs of earthwork via simulation.” J. Constr. Div., ASCE, 98(1), 49–60.
25.
Woods, D. G., and Harris, F. C. (1980). “Truck allocation model for concrete distribution.” J. Constr. Div., ASCE, 106(2), 131–139.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 119Issue 3September 1993
Pages: 590 - 606

History

Received: Apr 29, 1991
Published online: Sep 1, 1993
Published in print: Sep 1993

Permissions

Request permissions for this article.

Authors

Affiliations

Dennis F. McCahill, Member, ASCE
Asst. Prof., Catholic Univ. of America, Dept. of Civ. Engrg., Washington, DC 20064
Leonhard E. Bernold, Member, ASCE
Asst. Prof., Dept. of Civ. Engrg., North Carolina State Univ., Raleigh, NC 27695‐7908

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share