TECHNICAL PAPERS
Jun 1, 1993

Computerized Daily Site Reporting

Publication: Journal of Construction Engineering and Management
Volume 119, Issue 2

Abstract

This paper describes a computerized approach for collecting and processing site information that builds on the traditional superintendent's daily site report. System design considerations and features, lessons learned from field use, and future extensions are highlighted. Goals include improvements in the ease and accuracy with which field data can be recorded and processed to produce fast feedback on project status and problems. Benefits claimed for the approach include development of a coherent picture of the current status of a project and how it got there; faster response time in dealing with problems; integration of the site reporting, project planning, and project scheduling functions; an increased likelihood of schedule updating and speedier updating (thus leading to increased schedule credibility); help in dealing with claims; and documentation of experience in a form useful for future projects.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Bramble, B., and Callahan, M. (1987). Construction delay claims. John Wiley & Sons, New York, N.Y.
2.
Carr, R. M. (1991). “The point of the pen.” BYTE, 16(2), 211–221.
3.
Diekmann, J. E., and Al‐Tabtabai, H. (1992). “Knowledge‐based approach to construction project control.” Int. J. Proj. Mgmt., 10(1), 23–30.
4.
Eldin, N. N., and Eggar, S. (1990). “Productivity improvement tool: Camcorders.” J. Constr. Engrg. and Mgmt., ASCE, 116(1), 100–111.
5.
Russell, A. D. (1990). “REPCON: An innovative construction management system.” Management of the building firm (CIB 90, Building Economics and Constr. Mgmt. Int. Symp.), V. Ireland, D. Cheetham, D. Miller, and J. Soderberg, eds., 6, 405–416.
6.
Smith, A. G. (1987). “Increasing onsite production.” Trans. American Association of Cost Engineers, K.4.1–K.4.13.
7.
Stukhart, G. (1990). “Bar code standards.” Trans., American Association of Cost Engineers, D.4.1–D.4.5.
8.
Thomas, H. R., and Yiakoumis, I. (1987). “Factor model of construction productivity.” J. Constr. Engrg. and Mgmt., ASCE, 113(4), 623–639.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 119Issue 2June 1993
Pages: 385 - 402

History

Received: Oct 24, 1992
Published online: Jun 1, 1993
Published in print: Jun 1993

Permissions

Request permissions for this article.

Authors

Affiliations

Alan D. Russell, Member, ASCE
Assoc. Prof., Dept. of Civ. Engrg., Univ. of British Columbia, 2324 Main Mall, Vancouver, British Columbia V6T 1Z4, Canada

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share