TECHNICAL PAPERS
Jun 1, 1993

Application of Computer Simulation in Resolving Construction Disputes

Publication: Journal of Construction Engineering and Management
Volume 119, Issue 2

Abstract

Mediating construction disputes arising from changed conditions involves reviewing contractor's estimates prior to construction, analyzing the motives for the claim and determining the owner's and designers' responsibilities. This process can be enhanced by using applicable computer‐based tools such as simulation. This paper discusses the use of simulation in the mediation process. CYCLONE models are developed to analyze part of a claim between the public owner and a steel contractor. In particular, simulation models are developed to estimate the cost of the operation as envisioned by the contractor at time of bidding and to estimate the cost of the operation after the change. The two models give an accurate picture of the direct costs involved the additional costs incurred due to the added complexity resulting from the change. The paper reviews the complexity claim, discusses the operation that is the subject of the dispute, and presents the CYCLONE models developed to assist in the mediation.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
AbouRizk, S. M. (1990). “Input modeling for construction simulation,” PhD thesis, Purdue Univ., West Lafayette, Ind.
2.
Adrian, J., and Boyer, L. T. (1976). “Modeling method‐productivity.” J. Constr. Div., ASCE, 103(3), 154–168.
3.
Dabbas, M. (1981). “Computerized decision making in construction,” PhD thesis, Civil Engineering Dept., Georgia Institute of Technology, Atlanta, Ga.
4.
Halpin, D. W. (1977). “CYCLONE: method for modeling of job site processes.” J. Constr. Div., ASCE, 103(3), 489–499.
5.
Halpin, D. W. (1991). MicroCYCLONE user's manual. Division of Construction Engineering and Management, Purdue Univ., West Lafayette, Ind.
6.
Halpin, D. W., and Woodhead, R. W. (1976). Design of construction and process operations. John Wiley and Sons, Inc., New York, N.Y.
7.
Halpin, D. W., and Riggs, L. S. (1991). Planning and analysis of construction operations. John Wiley and Sons, Inc., New York, N.Y.
8.
Pritsker, A. A. B. (1985). Introduction to simulation and SLAM‐II. John Wiley and Sons, Inc., New York, N.Y.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 119Issue 2June 1993
Pages: 355 - 373

History

Received: May 1, 1992
Published online: Jun 1, 1993
Published in print: Jun 1993

Permissions

Request permissions for this article.

Authors

Affiliations

Simaan M. AbouRizk, Associate Member, ASCE
Asst. Prof., Constr. Engrg. and Mgmt., 220 Civ. Engrg. Bldg., Univ. of Alberta, Edmonton, Alberta T6G‐2G7
S. Peter Dozzi, Member, ASCE
Prof., Constr. Engrg. and Mgmt., 220 Civ. Engrg. Bldg., Univ. of Alberta, Edmonton, Alberta T6G‐2G7

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share