Simulation Technologies for Planning Heavy Construction Processes
Publication: Journal of Construction Engineering and Management
Volume 119, Issue 2
Abstract
Heavy construction projects, such as dams and tunnels, closely integrate design and construction and require the project manager or the project engineer to be knowledgeable and familiar with: (1) Different types of heavy construction plant and equipment; and (2) different construction methods that may be applicable to a given project. However, to effectively define these two elements, different possible scenarios, under different conditions and constraints, must be explored with both a technology and process focus, and a resource use focus. This task requires the development of descriptive, analytical, and decision‐making models, which accurately represent and simulate these processes, and experimentation with different alternatives under different conditions. Until relatively recently, the analytical and operational tools that have been available to practitioners to achieve this, have been complex and difficult to learn and use. The Cyclic Operations Network (CYCLONE) microcomputer‐based simulation methodology presents a viable alternative to overcome these barriers. This paper describes the implementation of this system within the division of project planning and control of a large Spanish heavy construction firm, using two specific case‐study applications.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
AbouRizk, S. M., and Halpin, D. W. (1990). “Probabilistic simulation studies for repetitive construction processes.” J. Constr. Engrg. Mgmt., ASCE, 116(4), 575–594.
2.
Halpin, D. W. (1977). “CYCLONE: Method for Modeling of Job Site Processes.” J. Constr. Div., ASCE, 103(3), 489–499.
3.
Halpin, D. W. (1990a). MicroCYCLONE system manual. Purdue Univ., West Lafayette, Ind.
4.
Halpin, D. W. (1990b). MicroCYCLONE user's manual. Purdue Univ., West Lafayette, Ind.
5.
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations. John Wiley & Sons, Inc., New York, N.Y.
6.
Halpin, D. W., and Woodhead, R. W. (1976). Design of construction and process operations. John Wiley & Sons, Inc., New York, N.Y.
7.
Ioannou, P. G. (1989). UM‐CYCLONE user's manual. Univ. of Michigan, Ann Arbor, Mich.
8.
Paulson, B. C. (1978). “Interactive graphics for simulating construction operations.” J. Constr. Div., ASCE, 104(1), 69–76.
9.
Riggs, L. S. (1980). “Sensitivity analysis of construction operations.” J. Tech. Councils, ASCE, 106(1), 145–163.
Information & Authors
Information
Published In
Copyright
Copyright © 1993 American Society of Civil Engineers.
History
Received: May 8, 1992
Published online: Jun 1, 1993
Published in print: Jun 1993
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.