Cost, Schedule, and Time Variances and Integration

Publication: Journal of Construction Engineering and Management
Volume 119, Issue 2

Abstract

This paper demonstrates detailed schedule‐ and cost‐control relationships at the activity/cost‐account level using generic microcomputer software to budget, track, and control projects. Time variances are introduced to describe differences between scheduled times and actual times for activity and project performance. Variances are the sum of more detailed variances, and variances can be calculated and reported at different levels of detail, whether for activities and cost accounts or for a project as a whole. Activity/cost‐account budgets sum to project budgets, and variances sum to project variances. A unified nomenclature and parallel budget and variance structures allow integration of cost and schedule control for projects that share common work breakdown structures. Budget, actual, and variance values of cost, progress, and time are combined in a single figure to demonstrate integration at the activity/cost‐account level. Equation development is augmented with computer implementation details for generic spreadsheets or custom applications. Examples are presented for a single element from start to completion and for a project of four elements.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Abudayyeh, O. Y., and Rasdorf, W. J. (1991). “Integrated cost and schedule control automation.” Preparing for construction in the 21st century (Proc. Constr. Congress '91), L. M. Chang, ed., ASCE, 679–686.
2.
Abu‐Hijleh, S. F. (1991). “A model for variance‐based exception reporting with user‐defined criteria.” Technical Report No. 18, Univ. of California, Berkeley, Calif., May.
3.
Bernstein, L. S. (1983). “Physical completion measuring techniques.” Current practice in cost estimating and cost control (Proc. Specialty Conf.), ASCE, 147–161.
4.
Carr, R. I. (1991). “Integration of cost and schedule control.” Preparing for construction in the 21st century (Proc. Constr. Congress'91), L. M. Chang, ed., ASCE, 687–692.
5.
“Cost and schedule control system criteria for contract performance measurement: Implementation guide.” (1980). Document No. DOE/CR‐0015, U.S. Dept. of Energy, Washington, D.C., May.
6.
Ibbs, C. W., Ashley, D. B., Neil, J. M., and Feiler, F. W. (1987). “An implementation strategy for improving project control systems.” Project controls: Needs and solutions (Proc. Specialty Conf.), C. W. Ibbs and D. B. Ashley, eds., ASCE, 101–112.
7.
McConnell, D. R. (1985). “Earned value technique for performance measurement.” J. Mgmt. in Engrg., ASCE, 1(2), 79–94.
8.
Murthy, C. S. (1983). “Cost and schedule integration in construction.” Current practice in cost estimating and cost control (Proc. Specialty Conf.), ASCE, 119–129.
9.
Neil, J. M. (1982). “Project control through integrated cost engineering.” Construction cost estimating for project control, Prentice‐Hall, Englewood Cliffs, N.J., 71–92.
10.
“Project control for construction.” (1987). Publication 6‐5, Constr. Industry Inst., Austin, Texas, Sep.
11.
“Project control for engineering.” (1986). Publication 6‐1, Constr. Industry Inst., Austin, Tex., Jul.
12.
Rasdorf, W. J., and Abudayyeh, O. Y. (1992). “NIAM conceptual data‐base design in construction management.” J. Comput. in Civ. Engrg., ASCE, 6(1), 41–62.
13.
Rasdorf, W. J., and Abudayyeh, O. Y. (1991). “Cost‐ and schedule‐control integration. Issues and needs.” J. Constr. Engrg. and Mgmt., ASCE, 117(3), 486–502.
14.
Riggs, L. S. (1987). “Project control techniques.” Project controls: Needs and solutions (Proc. Specialty Conf.), C. W. Ibbs and D. B. Ashley, eds., ASCE, 11–25.
15.
Sears, G. A. (1981). “CPM/COST. An integrated approach.” J. Constr. Div., ASCE, 107(2), 227–238.
16.
Singh, A. (1991). “Knowledge bases for C/SCSC.” Cost. Engrg., 33(6), 39–48.
17.
Teicholz, P. M. (1987). “Current needs for cost control systems.” Project controls: Needs and solutions (Proc. Specialty Conf.), C. W. Ibbs and D. B. Ashley, eds., ASCE, 47–57.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 119Issue 2June 1993
Pages: 245 - 265

History

Received: Aug 31, 1992
Published online: Jun 1, 1993
Published in print: Jun 1993

Permissions

Request permissions for this article.

Authors

Affiliations

Robert I. Carr, Fellow, ASCE
Prof., Dept. of Civ. Engrg., Univ. of Michigan, 2340 G. G. Brown Bldg., Ann Arbor, MI 48109‐2125

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share