This paper addresses the effective use of various levels of automation in concrete slab‐on‐grade construction, considering conventional manual construction, semiautomated placing using a laser‐guided screeding machine and automated finishing using a robotic floor finisher. For both manual construction and semiautomated placing, information is obtained through structured interviews of concrete contractors and site observations. Information on robotic finishing is obtained from robot developers. When compared to the conventional manual construction of a typical 1,859m2, 150‐mm‐thick slab, accomplished in 10 hours with a 12‐man placing crew and a six‐man finishing crew, automation of finishing alone is found to offer benefits through a 30% reduction in the size of the finishing crew, whereas automation of placing alone offers benefits through a 33% reduction in the placing crew size and a 20% activity‐duration reduction. Automation of both placing and finishing allows a 33% placing‐crew‐reduction, 25% finishing‐crew increase, and a 60% activity‐duration reduction. These benefits are considerably increased when higher quality is explicitly specified.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Arai, K., Yamada, B., Saito, M., and Banno, K. (1988). “The development and practice test of MARK II mobile robot for concrete slab finishing.” Proc. 5th Int. Symp. on Robotics in Constr., Ministry of International Trade and Industry, 2, Jun. 6‐8, 551–560.
2.
Barfoot, J. (1988). “Hungry floor layer will get adequate feed system.” Concrete (London), 22(4), 43–44.
3.
Davis, A. H. R., and Pinches, G. E. (1988). Canadian financial management. Harper and Row, New York, N.Y.
4.
De Boer, J. (1991). “Lasers in building construction and site work.” Construction Canada, 33(3), 7–9.
5.
Dickens, H. B. (1961). “Concrete floor finishes.” Canadian Building Digest No. 22, Div. of Building Res., Nat. Res. Council of Canada, Ottawa, Ontario, Canada.
6.
“Fast track flooring.” (1989). Concrete (London), 23(4), 17.
7.
Ferris, A. J. (1985). “Developments in compaction control systems.” Highw. Transp., 32(1), 2–5.
8.
Fling, R. S. (1987). “A screeding machine that's more than just a strike‐off.” Concr. Constr., 32(4), 351–353.
9.
Fricks, T. J. (1991). “Introducing new technology to the job site.” Concr. Int., 13(5), 68–69.
10.
Garber, G. A. (1988). “A new look at floor surface profiles.” Concrete (London), 22(1), 12–15.
11.
“Guide for concrete floor and slab construction.” (1989). ACI Mater. J., 86(3), 252–296.
12.
“Guide to durable concrete (ACI 201‐77).” (1977). ACI manual of concrete practice, ACI Committee 201, American Concrete Institute, Detroit, Mich.
13.
Gustafero, A. H. (1989). “Are thickness tolerances for concrete floors on grade realistic?” Concr. Constr., 34(4), 389–391.
14.
Hansen, K. L., and Tatum, C. B. (1989). “Technology and strategic management in construction.” J. Mgmt. Engrg., ASCE, 5(1), 67–83.
15.
Hasegawa, Y. (1991). “One decade of robotics in construction.” Proc. 8th Int. Symp. on Automation and Robotics in Constr., Fraunhofer Institute for Manufacturing Engineering and Automation, Stuttgart, Germany, 1, Jun. 3–5, 21–32.
16.
Hourly labour costs in the construction industry. (1990). Association of Building Contractors of Quebec (ABCQ), Montreal, Quebec, Canada.
17.
Kikuchi, K., Furuta, S., and Takayoshi, I. (1988). “Development and the result of practical works of concrete finishing robot.” Proc. 5th Int. Symp. on Robotics in Constr., Ministry of International Trade and Industry, 2, Jun. 6–8, 561–569.
18.
Kinney, G. (1991). “A revolution in concrete floor technology.” Constr. Canada, 33(3), 33–34.
19.
“Laser‐guided strikeoff machine helps contractor build flat floors fast.” (1989). Concr. Constr., 34(1), 17–19.
20.
Moselhi, O., and Hason, S. (1990). “Economic feasibility of a cement floor finishing robot.” Proc. 10th Symp. on Engrg. Applications of Mech., Queen's University, May 27–30, 353–358.
21.
Nishide, K., Hanawa, M., and Hori, N. (1988). “A position and heading measurement system for robots‐laser navigator.” Proc. 5th Int. Symp. on Robotics in Constr., Ministry of International Trade and Industry, 1, Jun. 6–8, 317–324.
22.
Nomura, H., Kajioka, Y., Okada, A., and Okuzumi, K. (1989). “Development of a concrete screeding robot.” Proc. 6th Int. Symp. on Automation and Robotics in Constr., The Construction Industry Institute, Jun. 6–8, 459–466.
23.
Peurifoy, R. L., and Oberlender, G. D. (1989). Estimating construction costs. McGraw‐Hill, New York, N.Y.
24.
Phelan, W. (1988). “Flatness, levelness, and surface toughness requirements for industrial floors.” Concr. Int., 10(3), 47–48.
25.
Pruitt, J. D. (1987). “Lasers guide slipforming of Atlanta's IBM tower.” Concr. Constr., 32(4), 345–349.
26.
Shiokawa, T., Yamashita, Y., and Tsuchiya, K. (1988). “Navigation/positioning control of mobile robots for construction.” Proc. 5th Int. Symp. on Robotics in Constr., Ministry of International Trade and Industry, 2, Jun. 6–8, 589–598.
27.
Smith, A. (1991). “Power screed on skis speeds concrete paving job.” Concr. Constr., 36(4), 350–351.
28.
Snell, L. M., and Rutledge, R. (1989). “A proposed method for determining compliance with floor thickness specifications.” Concr. Constr., 34(1), 13–16.
29.
Stephan, D. E. (1989). “Measuring the quality of floor finishes.” Concr. Int., 11(6), 41–49.
30.
Tatum, C. B., and Funke, A. T. (1988). “Partially‐automated grading: a construction process innovation.” J. Constr. Engrg. and Mgmt., ASCE, 114(1), 19–35.
31.
Tucker, R. (1991). “An overview of construction automation in the United States from an industry perspective.” Proc. 8th Int. Symp. on Automation and Robotics in Constr., Fraunhofer Institute for Manufacturing Engineering and Automation, Jun. 3–5.
32.
Ueno, T., Kajioka, Y., Sato, H., Maeda, J., and Okuyama, N. (1988). “Research and development on robotic systems for assembly and finishing work.” Proc. 5th Int. Symp. on Robotics in Constr., Ministry of International Trade and Industry, 1, Jun. 6–8, 279–287.
33.
Waldron, K. J., and McGhee, R. B. (1986). “The mechanics of mobile robots.” Robotics, 2(2), 113–121.
34.
Yoshitake, R., Matsuo, M., and Kawakami, K. (1991). “Development of automated construction work execution technology using laser beams.” Proc. 8th Int. Symp. on Automation and Robotics in Constr., Fraunhofer Institute for Manufacturing Engineering and Automation, 2, Jun. 3–5, 569–578.
35.
Ytterberg, C. F. (1961). “Good industrial floors: what it takes to get them and why. Part 1: monolithic concrete floors.” Civ. Engrg., ASCE, 31(2), 55–58.
36.
Ytterberg, C. F. (1987). “Shrinkage and curling of slabs on grade. Part 1: drying shrinkage.” Concr. Int., 9(4), 22–31.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 118Issue 4December 1992
Pages: 731 - 748

History

Published online: Dec 1, 1992
Published in print: Dec 1992

Permissions

Request permissions for this article.

Authors

Affiliations

Osama Moselhi, Member, ASCE
Assoc. Prof., Constr. Engrg. And Mgmt., Ctr. for Bldg. Studies, Concordia Univ., 1455 de Maisonneuve Blvd. W., Montreal, Canada H3G 1M8
Paul Fazio, Member, ASCE
Prof. and Dir., Ctr. for Bldg. Studies, Concordia Univ., 1455 de Maisonneuve Blvd. W., Montreal, Canada H3G 1M8
Stanley Hason
Grad. Student, Ctr. for Bldg. Studies, Concordia Univ., 1455 de Maisonneuve Blvd. W., Montreal, Canada H3G 1M8

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share