The time required to perform a given process in a repetitive construction environment tends to fall progressively as the same process is repeated for a sufficient number of successions. This paper discusses the aspects and fundamentals of learning development and its impact on the time requirement of repetitive construction processes from a simulation perspective. Common learning curves and their basic parameters and equations are highlighted. Factors that determine the level of learning rates for construction tasks are also investigated. We also introduce a statistically based approach for modeling learning development. Modeling learning phenomena in a simulation experiment is then introduced as applied in MicroCYCLONE (Halpin 1990). An example application is presented reflecting the impact of learning on the time requirement on a high‐rise building; the statistically based approach is compared to the currently used deterministric models. This paper presents a simulation‐based methodology for incorporating learning development in process simulation modeling and experimentation. In particular, it is suggested that a stochastic learning model be adopted due to the random factors affecting learning in construction. The paper highlights mathematical models often applied in modeling learning development and reviews the factors that contribute to these phenomena. An example application is also presented to illustrate how learning models can be incorporated into a simulation experiment. The effect of learning on the time required to complete a given process, and the significance of using stochastic versus deterministic learning models on various performance measures are also discussed.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Asher, H. (1956). Cost‐quantity relationship in airframe industry. The Rand Corporation, Santa Monica, Calif.
2.
Ashley, D. B. (1980). “Simulation of repetitive‐unit construction.” J. Constr. Div., ASCE, 106(2), 185–194.
3.
Baloff, N. (1970). “Startup management.” IEEE Trans. Engrg. Management, Vol. EM‐17, No. 4, 1970, pp. 132–141.
4.
Bricstone, C. A. (1978). “Training effectiveness through performance analysis.” Technical Report, Naval Training Center, Orlando, Fla.
5.
Carlson, J. G. (1961). “How management can use the improvement phenomenon.” California Mgmt. Rev., 3(2), 83–94.
6.
Carlson, J. G. (1973). “Cubic learning curves: Precision tool for labor estimating.” Manufact. Engrg. Mgmt., 71(5), 22–25.
7.
Cherrington, J. E., Lippert, S., and Towill, D. R. (1987). “The effect of prior experience on learning curve parameters.” Int. J. Product. Res., 25(3), 399–411.
8.
Cochran, E. B. (1960). “New concepts of learning curves.” J. Ind. Engrg., 11(4), 317–327.
9.
Conway, R., and Schultz, A. (1959). “The manufacturing progress function.” J. Ind. Engrg., 10(1), 39–53.
10.
Corlett, E. N., and Morcombe, V. J. (1970). “Straightening out the learning curve.” Personnel Mgmt., 2(6), 14–19.
11.
DeJong, J. R. (1957). “The effects of increasing skills on cycle time and its consequences for time standards.” Ergonomics, 1(1), 51–60.
12.
“Effect of repetition on building operations and processes on site.” (1965). ST/ECE/HOU/14, Economic Commission for Europe, United Nation, New York, N.Y.
13.
Garg, A., and Milliman, P. (1961). “The aircraft progress curve modified for design changes.” J. Ind. Engrg., 12(1), 23–27.
14.
Gates, M., and Scarpa, A. (1972). “Learning and experience curves.” J. Constr. Div., ASCE, 98(2), 79–101.
15.
Gates, M., and Scarpa, A. (1987). “Optimum number of crews.” J. Constr. Div., ASCE, 104(2), 123–132.
16.
Guibert, P. (1945). Le Plan de Fabrication Aeronautique, Dunod, Paris, France (in French).
17.
Halpin, D., and Woodhead, R. (1976). Design of construction process operations. John Wiley and Sons, Inc., New York, N.Y.
18.
Hijazi, A. (1989). “Simulation analysis of linear construction processes,” thesis presented to Purdue University, at West Lafayette, Ind., in partial fulfillment of the requirement for the degree of Doctor of Philosophy.
19.
Hoffman, J. R. (1968). “Effects of prior experience on learning curve parameters.” J. Ind. Engrg., 19(8), 412–413.
20.
Holdham, J. H. (1970). “Learning curves—Their applications in industry.” Product. Inventory Mgmt., 11(4), 40–55.
21.
An improved rational and mathematical explanation of the progress curve in airframe production. (1949). Stanford Research Institute, Stanford, Calif.
22.
Levy, F. K. (1965). “Adaptation in the production process.” Mgmt. Sci., 11(6), B136–B154.
23.
Pegels, C. C. (1969). “On startup or learning curves: An expanded view.” AIIE Trans., 1(3), 216–222.
24.
Pritsker, A. (1986). Introduction to simulation and SLAM II. John Wiley and Sons, Inc., New York, N.Y.
25.
Spears, W. (1985). “Measurement of learning and transfer through curve fitting.” Human Factors, 27(3), 251–266.
26.
Spencer, W. (1986). “Comparing learning curves?” Product. Engrg., 33(5), 56–58.
27.
Tanner, J. P. (1985). “The learning curve.” Product. Engrg., 32(5), 72–78.
28.
Thomas, R., Mathews, C., and Ward, J. (1986). “Learning curve models of construction.” J. Constr. Engrg. Mgmt., 112(2), 245–257.
29.
Thomopoulos, N. T., and Lehman, M. (1969). “The mixed model learning curve.” AIIE Trans., 1(2), 127–132.
30.
Touran, A., Burkhart, A., and Qabbani, Z. (1988). “Learning curve application in formwork construction.” Proc., ASCE 24th Annual Conf., San Luis, Calif., 20–24.
31.
Yelle, L. E. (1979). “The learning curve: Historical review and comprehensive survey.” Decision Sci., 10(2), 302–328.
32.
Wright, T. P. (1936). “Factors affecting the cost of airplanes.” J. Aeronaut. Sci., 3(4), 122–128.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 118Issue 4December 1992
Pages: 685 - 700

History

Published online: Dec 1, 1992
Published in print: Dec 1992

Permissions

Request permissions for this article.

Authors

Affiliations

Adib M. Hijazi
Exec. Mgr., Contracting Div., Al‐Rasheed House Est., P.O. Box 6335, Riyadh 11442, Saudi Arabia
Simaan M. AbouRizk, Associate Member, ASCE
Asst. Prof., Dept. of Civ. Engrg., Univ. of Alberta, Edmonton, Alberta, Canada, T6G 2G7
Daniel W. Halpin, Member, ASCE
Prof. and Head, Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette, IN 47907

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share