Monte Carlo Technique with Correlated Random Variables
Publication: Journal of Construction Engineering and Management
Volume 118, Issue 2
Abstract
In this paper the impact of correlation among cost components on the total cost variance of a construction project is analyzed. The Monte Carlo simulation approach for project risk analysis is reviewed and the problems with implementing this technique is described. Specifically, issues related to the type of the underlying cost distributions and existing correlations between cost items are explored. One suggested methodology for generating correlated random numbers in a simulation environment is reviewed. A multivariate lognormal distribution is used to generate correlated random numbers for various construction cost components. A large, real‐life data set is used to show the implementation of the suggested method and the results of the analysis are analyzed. It is shown that the proposed method is capable of predicting the variance of the total cost with good accuracy. Some guidelines for future research in this area are presented.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
AbouRizk, S. M., and Halpin, D. W. (1990). “Probabilistic simulation studies for repetitive construction processes.” J. Constr. Engrg. and Mgmt., ASCE, 116(4), 575–594.
2.
Curran, M. W. (1989). “Range estimating.” Cost Engrg., 31(3), 18–26.
3.
Curran, M. W. (1990). “Range estimating reduces iatrogenic risk.” Proc., American Association of Cost Engineering, Jun., k.3.1–k.3.3.
4.
Devore, J. L. (1991). Probability and statistics for engineering and the sciences. 3rd Ed., Brooks/Cole Publishing Co., Pacific Grove, Calif.
5.
Diekmann, J. E. (1983). “Probabilistic estimating: Mathematics and applications.” J. Constr. Engrg. and Mgmt., ASCE, 109(3), 297–308.
6.
Fishman, G. S. (1978). Principles of discrete event simulation. John Wiley and Sons, New York, N.Y.
7.
Gates, M. (1971). “Bidding contingencies and probabilities.” J. Constr. Div., ASCE, 97(2), 277–303.
8.
Johnson, M. E., and Ramberg, J. S. (1978). “Transformations of the multivariate normal distribution with applications to simulation.” Tech. Rep. LA‐UR‐77‐2595, Los Alamos Sci. Lab., Los Alamos, N.M.
9.
Law, A. M., and Kelton, W. D. (1991). Simulation modeling and analysis. 2nd Ed., McGraw‐Hill, Inc., New York, N.Y.
10.
“Management of project risks and uncertainties.” (1989). Publication 6‐8, Constr. Industry Inst., Austin, Tex., Oct.
11.
Pritsker, A. A. B. (1986). Introduction to simulation and SLAM II. 3rd Ed., Systems Publishing Corp., West Lafayette, Ind.
12.
Sherman, A. (1971). “Uncertainties in cost estimating as applied to microelectronic component manufacturing.” Trans., American Association of Cost Engineering, 1–15.
13.
Sobel, S. (1965). “A computerized technique to express uncertainty in advanced system cost estimates.” Technical Report No. ESD‐TR‐65‐79, Mitre Corp., Bedford, Mass.
14.
Spooner, J. E. (1974). “Probabilistic estimating.” J. Constr. Div., ASCE, 100(1), 65–77.
15.
Wiser, E. (1991). “Analysis of cost data in commercial construction projects,” MS thesis, Northeastern University, Boston, Mass.
Information & Authors
Information
Published In
Copyright
Copyright © 1992 ASCE.
History
Published online: Jun 1, 1992
Published in print: Jun 1992
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.