TECHNICAL PAPERS
Jun 1, 1992

Critical Success Factors in Winning BOT Contracts

Publication: Journal of Construction Engineering and Management
Volume 118, Issue 2

Abstract

The build‐operate‐transfer (BOT) concept represents a step forward in meeting the needs of developing countries for more capital investments in infrastructure and industrial construction. However, for a private‐sector consortium bidding for a BOT concession, the road to winning a major BOT contract is not easy. The consortium must be willing to take calculated risks and at the same time be adaptable to changing demands and circumstances in the host country. This paper describes the importance and characteristics of six critical success factors (CSF) that are vital for project sponsors in their endeavors to win lucrative BOT contracts. These factors are: entrepreneurship, picking the right project, a strong team of stakeholders, an imaginative technical solution, a competitive financial proposal, and the inclusion of special features in the bid.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Anderson, G. (1989). “Lessons from regional experience.” Conf. on New Opportunities and Issues in BOT Projects, Institute for International Research, Jakarta, Indonesia.
2.
Barrett, M. (1987). “Putting your equity on the line.” Euromoney, London, England, (Sept.), 119–128.
3.
Beuker, H. H. (1988). “Business opportunities in the pipeline transmission system through BOT.” Asian Conf. on Planning, Packaging and Implementing BOT Projects, Construction Industry Development Board, Singapore.
4.
Burke, T. (1989). “BOT franchise model—the Sydney Harbour Tunnel case study.” Conf. on Financing and Managing BOT Projects, Institute for International Research, Bangkok, Thailand.
5.
Cleland, D. I., and Kerzner, H. (1987). “The best managed projects.” Conf. on Proj. Mgmt., Project Management Institute, Montreal, Canada.
6.
Gibb, R. (1988). “Gordon Wu takes the profitable road to China.” Engrg. News Record, 220(25), 46–47.
7.
Wu, G. (1991). “Build‐operate‐transfer: The Hopewell experience.” Conf. on Int. Constr., Marketing and Proj. Financing, Centre for Advanced Construction Studies, Singapore.
8.
Henderson, N. (1989). “The Channel Tunnel—the early days.” The Channel Tunnel, Institution of Civil Engineers, London, England, 1–20.
9.
Lum, S. D. (1988). “Structuring and implementing successful BOT energy projects.” Asian Conf. on Planning, Packaging and Implementing BOT Projects, Construction Industry Development Board, Singapore.
10.
McCarthy, S. C., and Perry, J. G. (1990). “BOT contracts for water supply.” Conf. Proc., World Water '89, Thomas Telford, London, England, 215–220.
11.
Norton, R. (1989). “Innovative financing techniques.” Conf. on New Opportunities and Issues in BOT Projects, Institute for International Research, Jakarta, Indonesia.
12.
Payne, J. L. (1990). “Entrepreneurs in engineering organizations.” J. Mgmt. Engrg., ASCE, 6(2), 152–156.
13.
Pierce, R. W. (1989). “Getting a BOT off the ground—the importance of the right team.” Conf. on Managing BOT Project, Centre for Technology Management, Jakarta, Indonesia.
14.
Porter, J. E., and Matson, C. R. (1990). “A franchized tollway—the design, financing and management of the Tate's Cairn Tunnel, Hong Kong.” Conf. on Tunnelling, Institution of Engineers, Sydney, Australia.
15.
“Private team to tunnel under Sydney Harbour.” (1987). Engrg. News Record, 218(13), 18.
16.
Ridley, T. M. (1989). “The role of Eurotunnel.” The Channel Tunnel, Institution of Civil Engineers, London, England, 169–180.
17.
Rockart, J. F. (1979). “Chief executives define their own data needs.” Harvard Business Review, (Mar.–Apr.), 81–92.
18.
Samarnphun, N. L. (1988). “Getting ready for the skytrain ride.” Business Review, Bangkok, Thailand, 10(1), 1–15.
19.
Thomas, J. P. (1982). In search of excellence: Lessons from America's best run companies. Harper & Row, New York, N.Y.
20.
Thompson, N. S. (1989). “Hong Kong Eastern Harbour Crossing—the concept and implementation.” Building and Constr. News, Hong Kong, (Sept.), 21–24.
21.
Tiong, L. K. R. (1990a). “BOT projects: Risks and securities.” Constr. Mgmt. and Economics, Reading, England, 8, 315–328.
22.
Tiong, L. K. R. (1990b). “Comparative study of BOT projects.” J. Mgmt. Engrg., ASCE, 6(1), 107–122.
23.
Turner, J. M. (1989). “The history behind the Eastern Harbour Crossing.” Building and Constr. News, Hong Kong, (Sept.), 17–20.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 118Issue 2June 1992
Pages: 217 - 228

History

Published online: Jun 1, 1992
Published in print: Jun 1992

Permissions

Request permissions for this article.

Authors

Affiliations

Robert L. K. Tiong, Member, ASCE
Sr. Lect., School of Civ. and Struct. Engrg., Nanyang Tech. Univ., Singapore 2263
Khim‐Teck Yeo
Assoc. Prof., School of Mech. and Production Engrg., Nanyang Tech. Univ., Singapore 2263
S. C. McCarthy
Res. Fellow, School of Civ. Engrg., Univ. of Birmingham, Edgbaston, Birmingham, B15 2TT, England

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share