TECHNICAL PAPERS
Mar 1, 1992

Effects of Scheduled Overtime on Labor Productivity

Publication: Journal of Construction Engineering and Management
Volume 118, Issue 1

Abstract

This paper reviews the construction literature on the effects on labor productivity of scheduled overtime. The literature is organized into three groups: studies based on data from project records, studies in which the sources of data are unknown, and studies done in the manufacturing sector. Analyses are also performed on the influence of the number of days per week and the number of hours per day. The literature on scheduled overtime was found to be very sparse; dated to the late 1960s and earlier; based on small sample sizes; and largely developed from questionable or unknown sources. The analysis reveals very few original data. Many studies reference other studies, giving the false appearance of originality. The analysis of data shows general consistency with respect to overall losses of efficiency. However, with respect to the loss of efficiency as a function of the number of hours per day and the number of days per week, many studies show that the effect of these two variables is negligible. The paper concludes that these studies provide strange and largely unbelievable results.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Adrian, J. J. (1987). Construction productivity improvement. Elsevier Science Publishing Co., New York, N.Y.
2.
“Effects of scheduled overtime on construction projects.” (1973). Report, American Association of Cost Engineers, Morgantown, W.Va.
3.
“Effect of scheduled overtime on construction projects.” (1974). Coming to grips with some major problems in the construction industry, Business Roundtable, New York, N.Y., 1–14.
4.
Howerton, J. (1969). “Do you know the hidden costs of overtime?” Qualified Contractor, (Mar.).
5.
“How much does overtime really cost.” (1968). Bulletin No. 18A, Mechanical Contractors Association of America, Washington, D.C.
6.
Kossoris, M. (1947a). “Studies of the effects of the long working hours.” Bulletin 917, Bureau of Labor Statistics, Washington, D.C.
7.
Kossoris, M. (1947b). “Studies of the effects of the long working hours.” Bulletin 917A, Bureau of Labor Statistics, Washington, D.C.
8.
McConnell, G. (1982). “Evaluation of six alternative work schedules.” Fluor‐Daniel Construction Co., Inc., Greenville, S.C.
9.
O'Connor, L. V. (1969). “Overcoming the problems of construction scheduling on large central station boilers.” Proc., American Power Conf., (31), 518–528.
10.
Oglesby, C., Parker, H., and Howell, G. (1989). Productivity improvement in construction. McGraw‐Hill Book Co., Inc., New York, N.Y.
11.
Overtime and productivity in electrical construction. (1969). National Electrical Contractors Association, Washington, D.C.
12.
Overtime and productivity in electrical construction, 2nd Ed. (1989). National Electrical Contractors Association, Bethesda, Md.
13.
Overtime work efficiency survey. (1962). National Electrical Contractor Association, Washington, D.C.
14.
Owner's guide on overtime, construction costs and productivity. (1979). American Subcontractors Association, Association General Contractors of America, and Associated Specialty Contractors, Inc., Washington, D.C.
15.
“Scheduled overtime effect on construction projects.” (1980). Construction Industry Cost Effectiveness Task Force Report C‐2, Business Roundtable, New York, N.Y.
16.
“Tables for calculation of premium time and inefficiency on overtime work.” (1968). Bulletin No. 20, Mechanical Contractors Association of America, Washington, D.C.
17.
“The effects of scheduled overtime and shift schedule on construction craft productivity.” (1988). Source Document 43, Construction Industry Institute, Austin, Tex.
18.
The four‐ten hour/day work week. (1979). Daniel International Construction Company, Inc., Greenville, S.C.
19.
Thomas, H. R. (1990). “Effects of scheduled overtime on labor productivity: A literature review and analysis.” PTI Report No. 9107, The Pennsylvania State University, University Park, Pa.
20.
Thomas, H. R. (1991). “Labor productivity and work sampling: The bottom line.” J. Constr. Engrg. and Mgmt., ASCE, 117(3), 423–444.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 118Issue 1March 1992
Pages: 60 - 76

History

Published online: Mar 1, 1992
Published in print: Mar 1992

Permissions

Request permissions for this article.

Authors

Affiliations

H. Randolph Thomas, Member, ASCE
Prof., Penn. Transp. Inst., Penn. State Univ., Res. Bldg. B, University Park, PA 16802

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share