Multiparameter Bidding System—Innovation in Contract Administration
Publication: Journal of Construction Engineering and Management
Volume 118, Issue 1
Abstract
The vast majority of construction contracts are procured using the low‐bid system. In the low bid system price is the sole basis for determining the successful bidder. This traditional approach has certain drawbacks. In recent years, several innovative modifications to the low bid system have been tried. This paper presents the results of these trials and proposes a more comprehensive approach to bid award criteria. A presentation of a multiparameter bidding system is made. The multiparameter bid award system would include various owner‐selected parameters, such as cost, time, and quality. Quantification of these parameters and bidder evaluation methodology are included. Finally, a discussion of the advantages and disadvantages of a multiparameter bid award criteria system is also presented.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Bower, D. M. (1989). “Innovative contracting practice.” Proc., ASCE Highway Conf., ASCE, New York, N.Y.
2.
Byrd, L. G. (1989). “Partnerships for innovation: Private sector contributions to innovation in the highway industry.” National cooperative highway research program synthesis of highway practice 149, Transportation Research Board, Washington, D.C.
3.
Cohen, A. (1961). “Public construction contracts and the law.” F. W. Dodge, New York, N.Y.
4.
Ellis, R. D., and Herbsman, Z. J. (1991). “Cost time bidding concept—An innovative approach.” Transp. Res. Rec., 1282, Transportation Research Board, Washington, D.C.
5.
Fong, C. K. (1990). “The construction quality assessment system—CONQUAS,” CIDB Rev., The Construction Industry Development Board.
6.
Harp, W. D. (1988). “Historical background low bid concept.” A paper presented in the Annual Meeting of the Task Force, 15 pages, Denver.
7.
Harp, W. D. (1990). “Innovative contracting practice—The new way to undertake public works projects.” Hot Mix Asphalt Tech., Winter.
8.
Henriod, E. E., and Lanteran, J. M. (1988). “Trend in contracting practice for civil works.” Task Force on Innovative Practice, World Bank, Washington, D.C.
9.
Herbsman, Z. J. (1988). “Evaluation of scheduling techniques for highway construction projects.” Transp. Res. Rec., 1126, Transportation Research Board, Washington, D.C. 110–119.
10.
Marek, C. (1989). “Overcoming barriers to innovative contracting procedures—Testing equipment and procedures.” Hot Mix Asphalt Tech.
11.
Netherton, D. R. (1959). Selected studies in highway law. 3.
12.
“Sample Bidding Documents—Procurement of Work.” (1990). Report, Inter‐American Development Bank.
13.
Yarbrough, R. L. (1990). “In search of performance excellence: Moving away from method specifications.” Focus, Strategic Highway Research Program.
Information & Authors
Information
Published In
Copyright
Copyright © 1992 ASCE.
History
Published online: Mar 1, 1992
Published in print: Mar 1992
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.