Project‐Controls Systems Opportunities
Publication: Journal of Construction Engineering and Management
Volume 117, Issue 4
Abstract
The current generation of project‐control systems provides useful information, but has several problems that limit the effectiveness and efficiency in controlling projects. The current generation of project‐control systems has focused on the increased use of the microcomputer for sorting, computing, and storing data. This increased use of the microcomputer has not been without the introduction of difficulties to the process. The problems include input inefficiencies (e.g., multiple input of the same data) and output problems (e.g., extensive tabular listings of data). These problems lead to wasted or ineffective use of time to support the project‐control systems. Potential opportunities and advancements to address these deficiencies are presented. These opportunities include input technologies, analysis techniques, and systems integration. Specific examples discussed include scanning and digitizing technology, holography, artificial intelligence, remote‐sensing technologies, voice‐recognition systems, and enhanced software‐systems development. The areas discussed in this paper are intended to provide direction for future research and development of project‐control software for the next generation of project‐control systems for the construction industry.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Bernstein, C. S. (1985). “Computers aren't infallible.” Civ. Engrg., ASCE, New York, N.Y.
2.
Christian, J. T., and Lersch, P. (1984). “Engineer‐constructor experience with computer‐aided design and engineering.” Proc. Symp. on Computer‐Aided Design in Civ. Engrg., ASCE.
3.
Hendrickson, C., Martinelli, D., and Rehak, D. (1987). “Hierarchial rule‐based activity duration estimation.” J. Constr. Engrg. and Mgmt., ASCE, 113(2), 288–301.
4.
Hillkirk, J. (1986). “Automation accelerates paper chase.” USA Today, April 14.
5.
Ibbs, C. W., and Abu‐Hijleh, S. (1990). “An intelligent exception reporting system.” Trans. AFITEP 6th Annual Meeting, Association Francaise des Ingenieurs et Technicirns d'Estimation, de Planification et de Projets.
6.
Lemieux, L. K. (1985). “Implementing computerized project management principles and techniques.” Proc., American Association of Cost Engineers.
7.
Levitt, R. E., Kartam, N., and Kunz, J. (1988). “Artificial intelligence techniques for generating construction project plans.” J. Constr. Engrg. and Mgmt., ASCE, 114(3).
8.
Rounds, J. L., and Warning, G. (1987). “Impact of computerizing mid‐sized construction companies.” J. Constr. Engrg. and Mgmt., ASCE, 113(2), 183–190.
9.
Rowings, J. E., and Wagner, M. (1990). “Alternative logic scheduling technique.” Trans. AFITEP 6th Annual Meeting, Association Francaise des Ingenieurs et Technicirns d'Estimation, de Planification et de Projets.
10.
Silvestrini, R. J. (1983). “The planning engineer—a human element of planning and scheduling.” Proc., American Association of Cost Engineers.
11.
Tamimi, S., and Diekmann, J. (1988). “Soft logic in network analysis.” J. Comp. in Civ. Engrg., ASCE, 2(3), 289–300.
Information & Authors
Information
Published In
Copyright
Copyright © 1991 ASCE.
History
Published online: Dec 1, 1991
Published in print: Dec 1991