TECHNICAL PAPERS
Sep 1, 1990

New Approach to Construction Management

Publication: Journal of Construction Engineering and Management
Volume 116, Issue 3

Abstract

In this paper the concept of organizational effectiveness based on the productivity/PERT/LOB methodology has been elaborated. Using illustrative examples it was demonstrated that the introduction of the concept of resource or factor effectiveness into the management of construction engineering projects can be of immense value in dealing with cost overruns, which have become a critical problem in the construction industry. Particularly of great significance in this approach the two types of analyses: partial effect analysis (PEA) and the total effect analysis (TEA), which provide pertinent information about the current status of the project, for detecting the proximate and remote causes of changes in the effectiveness of the resources used in the project execution. The usefulness of this technique in determining the efficiency of the supervisors, foremen, and management in the use of the various resources; in ensuring that disbursements are consistent with management's expectations on the actual work to be done; in indicating when a portion of a project should be subcontracted; and in establishing cost overrun bounds, is also discussed.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Anderson, S. D., and Woodhead, R. W. (1981). Project manpower processes in construction practice. John Wiley and Sons, Inc., New York, N.Y.
2.
Archibald, R. D. (1976). Managing high technology programs and projects. John Wiley and Sons, New York, N.Y.
3.
Clark, F. D., and Lorenzoni, A. B. (1978). Applied cost engineering. Marcel Dekker, New York, N.Y.
4.
Cleland, D. I. (1964). “Why project management?” Business Horizon, Winter, 81–88.
5.
Cleland, D. I. (1968). Systems analysis and project management. McGraw‐Hill, Inc., New York, N.Y.
6.
Cummings, L. L. (1983). “Organizational effectiveness and organizational behaviour: A critical perspective.” Organizational effectiveness: A comparison of multiple models, K. S. Cameron and D. A. Whetten, eds., Academic Press, New York, N.Y., 187–203.
7.
Davis, E. W., and Heidorn, G. E. (1971). “An algorithm for optimal project scheduling under multiple resource constraints.” Management Science, 17, 12, 803–816.
8.
Goldhaber, S., Jha, C. K., and Macedo, M. C., Jr. (1977). Construction management: Principles and practice. New York: John Wiley and Sons, New York, N.Y.
9.
Goodman, P. S., and Pennings, J. M., eds. (1977). New perspective in organizational effectiveness. Jossey‐Bass, San Francisco, Calif.
10.
Jha, C. K. (1966). “Manpower utilization of a large engineering project.” Proc. 4th Int. Conf. on Operational Res., D. B. Hertz and J. Melese, eds., Wiley Interscience, New York, N.Y.
11.
Jha, C. K. (1968). “CPM implementation in the construction industry—a dream or a challenge.” Proc. Spring Joint ORSA/TIM Meeting, Operations Research Society of America and Institute of Management Science.
12.
Kalu, T. C. U. (1984). “Project management and labour utilization: A case study of the building construction industry in Nigeria,” thesis presented to the University of Ibadan, at Ibadan, Nigeria, in partial fulfillment of the requirements for the degree of Master of Science.
13.
Martino, R. L. (1964). Project management and control. Vols. 1–3, American Management Association, New York, N.Y.
14.
Reiner, L. E. (1972). Handbook of construction management. Prentice‐Hall, Englewood Cliffs, N.J.
15.
Rubey, H., and Milner, W. W. (1970). Construction and professional management. University of Oklahoma Press, Oklahoma.
16.
Stewart, J. M. (1965). “Making project management work.” Project management: techniques, applications and managerial issues, E. W. Davis, ed., Industrial engineering and management press, Norcross, Ga.
17.
Volpe, S. P. (1972). Construction management practice. John Wiley and Sons, Inc., New York, N.Y.
18.
Zammuto, R. F. (1982). Assessing organizational effectiveness. State University of New York Press, New York, N.Y.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 116Issue 3September 1990
Pages: 494 - 513

History

Published online: Sep 1, 1990
Published in print: Sep 1990

Permissions

Request permissions for this article.

Authors

Affiliations

Timothy Ch. U. Kalu
Dept. of Mgmt. Sciences, Univ. of Ilorin, Ilorin, Nigeria

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share