TECHNICAL PAPERS
Mar 1, 1990

Productivity Improvement Tool: Camcorders

Publication: Journal of Construction Engineering and Management
Volume 116, Issue 1

Abstract

This paper describes the use of a video camera for improving productivity on construction projects. The paper presents a step‐by‐step procedure for the use of the camcorder technique from purchasing the equipment to implementation of productivity improvement program. A case study is presented where a camcorder system was used as a management tool to improve labor productivity during the construction of a state prison. Data were collected for selected major work items including precast units, tilt‐up panels, and preengineered metal buildings. The use of camcorders resulted in measurable benefits to the project in terms of improving communication between management and labor, identifying the reasons for productivity problems, and providing irrefutable records of construction activities for training, safety, performance evaluation, and possible legal disputes.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Asher, H. (1956). “Cost‐quality relations in airframe industry.” Research Memorandum R‐291, Rand Corporation, Santa Monica, Calif., Jul.
2.
Borcherding, J. D., and Oglesby, C. H. (1974). “Construction productivity and job satisfaction.” J. Constr. Div., ASCE, 100(3), Sep., 413–431.
3.
Jones, W. L. (1964). “Human factors as they affect methods improvement in construction,” thesis presented to Stanford University, at Stanford, California, in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
4.
Kahn, R. L., and Katz, D. (1965). “Leadership practices in relation to productivity and morale.” J. Methods Time Measurements, 10(2), Mar., 19–26.
5.
Logcher, R. D., and Collins, W. W. (1978). “Management impact on labor productivity,” J. Constr. Div., ASCE, 104(4), Dec, 447–461.
6.
McNally, H. E., and Havers, J. A. (1967). “Labor productivity in the construction industry.” J. Constr. Div., ASCE, 112(2), Jun., 245–258.
7.
Samelson, N. M., and Borcherding, J. D. (1980). “Motivating foremen on large construction projects.” J. Constr. Div., ASCE, 106(1), Mar., 29–36.
8.
Scherader, C. R. (1972). “Motivation of construction craftsmen.” J. Constr. Div., 98(2), Sep., 257–273.
9.
Sprinkle, H. B. (1972). “Analysis of time lapse construction films.” J. Constr. Div., ASCE, 98(2), Sep., 183–199.
10.
Thomas, H. R., Cody, T. M., and Ward, J. G. (1986). “Learning curve models of construction productivity.” J. Constr. Engrg. and Mgmt., ASCE, 112(2), Jun., 245–258.
11.
Tucker, R. L. (1986). “Management of construction productivity.” J. Mgmt. in Engrg., ASCE, 2(3), Jul., 148–156.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 116Issue 1March 1990
Pages: 100 - 111

History

Published online: Mar 1, 1990
Published in print: Mar 1990

Permissions

Request permissions for this article.

Authors

Affiliations

Neil N. Eldin, Member, ASCE
Asst. Prof. of Constr., Univ. of Wisconsin, Madison, WI 53706
Stephan Egger
Asst. Prof. of Constr. and Productivity Engr. Consultant, Univ. of Northern Iowa, Cedar Falls, IA 50614

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share