Simulation of Nonsteady Construction Processes
Publication: Journal of Construction Engineering and Management
Volume 115, Issue 2
Abstract
Construction, with its uniqueness and unusual operational characteristics, faces special handicaps dealing with process planning and control. In order to study the productivity and the resource efficiency of construction operations, one has to consider the impact of a wide variety of factors. This paper presents a framework for the identification of sources of process delays. It focuses on the study of the relationship between storage limitations of flow units within a production system and the productivity of the system. In addition, the effect of breakdown delays in combination with different storage conditions are discussed. The CYCLONE (CYCLic Operations Network) modeling and simulation technique was used as an analytical tool for this study. Enhancements to the existing Micro‐CYCLONE simulation program, which enable it to handle the necessary new modeling elements, will be introduced. The analysis shows that generally higher storage constraints result in higher overall productivity. However, certain constraints and process structures present specific conditions where the general rule does not apply.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Adrian, J., and Boyer, T. (1976). “Modeling method‐productivity.” J. Constr. Div., ASCE, 157–168.
2.
Bernold, L. E. (1985). “Productivity transients in construction processes,” thesis presented to Georgia Institute of Technology at Atlanta, Ga., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
3.
Blanchard, B. S., and Fabrycky, W. J. (1981). Systems engineering and analysis, Prentice‐Hall, Inc., Englewood Cliffs, N.J.
4.
Callahan, M. T. (1984). “Construction productivity improvement techniques.” Proc., CIB W‐65 1984, Vol. 2, University of Waterloo, Canada, 537–546.
5.
Carr, R. I., and Meyer, W. L. (1974). “Planning construction of repetitive building units.” J. Constr. Div., ASCE, 100(3), 403–412.
6.
Dabbas, M. A. (1981). “Computerized decision making in construction,” thesis presented to the Georgia Institute of Technology, at Atlanta, Ga., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
7.
Garner, Borcherding, and Samuelson. (1979). “Factors influencing the motivation and productivity of craftsmen and foremen on large construction projects.” Contract EEQ‐78‐G‐01‐633, U.S. Dept. of Energy.
8.
Halpin, D. W. (1973). “An investigation of the use of simulation networks for modeling construction operations,” thesis presented to the University of Illinois, at Urbana‐Champaign, Ill., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
9.
Halpin, D. W. (1977). “CYCLONE: Method for modeling of job site processes.” J. Constr. Div., ASCE, 103(3), 489–499.
10.
Halpin, D. W., and Woodhead, R. W. (1976). Design of construction and process operation. John Wiley and Sons, New York, N.Y.
11.
Knot, J. L., and Woodhead, R. W. (1980). “The CYCLONE‐timelapse analysis system.” Construction Monographs, School of Civil Engineering, University of New South Wales, Sydney, Australia.
12.
Lefkoe, M. R. (1970). The crisis in construction. The Bureau of National Affairs, Inc., Washington, D.C.
13.
Lluch, J. F. (1981). “Analysis of construction operations using microcomputers,” thesis presented to Georgia Institute of Technology, at Atlanta, Ga., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
14.
Parker, H. W., and Oglesby, C. H. (1972). Methods improvement for construction managers, McGraw‐Hill Book Company, New York, N.Y.
15.
Paulson, B. C. (1985). “Automation and robotics for construction.” J. Const. Div., ASCE, 111(3), 190–207.
16.
Paulson, B. C. (1984). “Exploring the potential for automated real‐time data acquisition in construction.” Proc., CIB W‐65 1984, Vol. 2, University of Waterloo, Canada, 455–462.
17.
Paulson, B. C., Weng, T. C., and Chorlie, C. L. K. (1985). “Simulating construction operations by microcomputers,” Proc., Construction Research Applied to Practice, ASCE, Detroit, Mich, 35–49.
18.
Thomas, R. H. (1981). “Can work sampling lower construction costs?” J. Constr. Div., ASCE, 107(2), 263–278.
19.
Tucker, R. L., et al. (1982). “Implementation of foreman‐delay surveys.” J. Constr. Div., ASCE, 108(4), 577–591.
Information & Authors
Information
Published In
Copyright
Copyright © 1989 ASCE.
History
Published online: Jun 1, 1989
Published in print: Jun 1989
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.