Factors Affecting Construction Planning Efforts

Publication: Journal of Construction Engineering and Management
Volume 115, Issue 1

Abstract

It is widely accepted that environmental uncertainty strongly affects decision makers' performance and that the construction environment is very uncertain. Despite awareness of the consequences of uncertainty on a project, little attention has been paid to its effects on construction management, particularly on the planning function. The paper focuses on the assessment of the effect of environmental variables on the efforts invested in planning. The effect of eight situational variables is evaluated by measuring the time invested in planning and control, as well as the frequency of revisions. The variables examined are: number of subcontractors, number of trades, objectives rigidity, percentage completion of design, past construction experience, predictability of weather, availability of labor, and attitudes towards planning. The study concludes that efforts should be adjusted to meet variable situations.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ahuja, H. N., and Nandakumar, V. (1984). “Enhancing reliability of project duration forecasts.” Trans. Amer. Assoc. Cost Engrs., Montreal, Canada, E.6.1–E.6.12.
2.
Arditi, D. (1981). “A comparison of attitudes to planning in industrialized and developing countries.” Proc. PMI INTERNET Joint Symp., Boston, Mass., 641–649.
3.
Baldwin, J. R. (1971). “Causes for delays in the construction industry.” J. Const. Div., ASCE, 97, 177–187.
4.
Barrie, D. S. (1981). Directions in managing construction. John Wiley and Sons, Inc., New York, N.Y.
5.
Bennet, J., and Ormerod, R. N. (1984). “Simulation applied to construction projects.” Constr. Mgmt. Economics, 2, 225–263.
6.
Birrel, J. (1980). “Beyond the critical path.” J. Constr. Div., ASCE, 106(3), 389–407.
7.
Bourdon, C. C., and Levitt, R. (1980). Union open shop construction. Lexington Books, Lexington, Mass.
8.
Business Roundtable. (1983). “Report on planning and scheduling.” Report A‐6 Modern Management Systems, Appendix A‐6.1, The Business Roundtable, New York, N.Y.
9.
Choudhury, S. (.1981). “Input‐output scheduling—new approach to construction scheduling of chemical projects.” Proc. PMI‐INTERNET Joint Symp., Boston, Mass., 347–353.
10.
Chinta, R. R., Jenster, P. V., and King, W. R. (1987). “Functions of strategic planners.” Strategic planning and management handbook, W. R. King and D. I. Cleland, eds. Van Nostrand Reinhold Co., New York, N.Y. 539–554.
11.
Cost Engineering. (1986). “1986 AACE salary and demographic survey.” Cost Engrg., 28(1), 32–34.
12.
Crenner, J. J. (1978). “Maintaining favorable credit ratings.” Construction business handbook, R. F. Cushman, ed., McGraw‐Hill, New York, N.Y., 12‐1–12‐18.
13.
Dallavia, L. (1957). Estimating general construction costs. F. W. Dodge Corp., New York, N.Y.
14.
Duncan, R. B. (1972). “Characteristics of organizational environments and perceived environmental uncertainty.” Administrative Sci. Q., 17, 313–327.
15.
Engineering News Record. (1980). “Productivity problem: planning.” ENR, Oct. 30, 171–172.
16.
Engineering News Records. (1985). “The top 400 contractors.” ENR, Vol. 214, Apr. 18, 46–79.
17.
Fondahl, J. W. (1982). “Short interval planning using SIPCPM.” Technical Report No. 270, Department of Civil Engineering, Stanford University, Stanford, Calif.
18.
Galbraith, J. R. (1972). “Organization design: an information processing view.” Organization planning: cases and concepts, J. W. Lorsch and P. R. Lawrence, eds., R. D. Irwin and Dorsey Press, Georgetown, Ontario.
19.
Galbraith, J. R. (1977). Organization design, Addison‐Wesley Publishing Company, Reading, Mass.
20.
Halpin, D. W. (1985). Financial and cost concepts for construction management. John Wiley & Sons, Inc., New York, N.Y.
21.
Jaafari, A. (1984). “Criticism of CPM for project planning analysis.” J. Constr. Engrg. Mgmt., ASCE, 110(2), 222–233.
22.
Koval, J. G. (1981). “System for establishing drawing status.” Trans. Amer. Assoc. Cost Engrs., Toronto, Ontario, H.5.1–H.5.6.
23.
Laufer, A., and Cohenca, D. (1987). “Factors affecting construction planning efforts and outcomes.” Technical Report, Building Research Station, Technion, Haifa, Israel.
24.
Laufer, A., and Tenah, K. A. (1985). “Introducing management information systems in medium sized construction companies.” Int. J. Project Mgmt., 3(3), 169–176.
25.
Laufer, A., and Tucker, R. L. (1987). “Is construction project planning really doing its job? A critical examination of focus, role, and process.” Constr. Mgmt. Economics J., 5, 243–266.
26.
Laufer, A., and Tucker, R. L. (1988). “Competence and timing dilemmas in construction planning.” Constr. Mgmt. Economics J., 6, 1–17.
27.
Lawrence, P. R. (1981). “Organization and environment perspective.” Perspectives on organizational design and behavior, A. H. Van de Ven and W. F. Joyce, eds., John Wiley and Sons, Inc., New York, N.Y.
28.
Lawrence, P. R., and Lorsch, J. W. (1967). Organization and environment. Harvard Business School, Boston, Mass.
29.
Lichtenberg, S. (1981). “Real world uncertainties in project budgets and schedules.” Proc. PMI‐INTERNET Joint Symp., Boston, Mass., 179–193.
30.
Lindsay, W., and Rue, S. W. (1980). “Impact of the organization environment on the long range planning process: a contingency view.” Academy Mgmt. J., 23(3), 385–404.
31.
Lorsch, J., and Morse, J. (1974). Organizations and their members: a contingency approach. Harper and Row, New York, N.Y.
32.
Malcolm, W. H., Talhouni, B. T., and Whitehead, R. C. (1987). “Measurement of factors affecting labour productivity on construction.” Systems for managing construction, P. R. Lansley and P. A. Harlow, eds., E. & F. N. Spon, New York, N.Y., 669–680.
33.
Mason, D. (1984). “The CPM technique in construction: a critique.” Trans. Amer. Assoc. Cost Engrs., Montreal, Canada, E.2.1–E.2.10.
34.
Michael, D. (1973). Learning to plan and planning to learn. J. Bass, San Francisco, Calif.
35.
Mintzberg, H. (1979). The structuring of organizations. Prentice‐Hall, Englewood Cliffs, N.J.
36.
Morton, G. H. A. (1983). “Human dynamics in project planning.” Project management handbook, D. I. Cleland and W. R. King, eds., Van Nostrand Reinhold Co., New York, N.Y.
37.
Peer, S. (1974). “Network analysis and construction planning.” J. Constr. Engrg. Mgmt., ASCE, 10, 139–146.
38.
Russo, J. A. (1966). “The economic impact of weather on the construction industry of the United States.” Bull. Amer. Metereol. Soc., 47, 967–972.
39.
Thompson, J. D. (1967). Organizations in action. McGraw‐Hill, New York, N.Y.
40.
Weick, K. (1969). The social psychology of organizing. Addison‐Wesley, Reading, Mass.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 115Issue 1March 1989
Pages: 70 - 89

History

Published online: Mar 1, 1989
Published in print: Mar 1989

Permissions

Request permissions for this article.

Authors

Affiliations

Dora Cohenca
Res. Engr., Building Res. Station, Technion, IIT, Haifa 32000, Israel
Alexander Laufer, Member, ASCE
Head, Dept. of Constr, Mgmt., Building Res. Station, Technion, IIT, Haifa 32000, Israel
William B. Ledbetter, Fellow, ASCE
Prof., Civ. Engrg., Clemson Univ., Clemson, SC 29634

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share