Factor Model of Construction Productivity

Publication: Journal of Construction Engineering and Management
Volume 113, Issue 4

Abstract

The factor model for evaluating the productivity of labor‐intensive construction activities is described. The theory underlying the model is presented. The model states that many factors cause disturbances to crew performance. If these can be quantified and discounted from actual productivity data, one is left with an ideal productivity curve, which can be used to forecast future performance. Methods for collecting and combining data from various projects are presented and illustrated using actual productivity data from three commercial construction projects. Insight into the validity of the factor model is demonstrated by considering the effect of temperature and relative humidity on productivity. Multiple regression techniques are used to mathematically explain approximately 40% of the variability in the daily productivity data. Other statistical parameters are also described. The results of the weather model are compared to similar relationships reported by other researchers. The relationship developed by the writers is consistent with those reported in the literature. The factor model and the methods used to develop the weather model appear to be valid because the discounted productivity curve has less variability than the original productivity data. Lastly, an example is presented that illustrates the way in which the impact of weather on productivity can be evaluated.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
“Absenteeism and turnover.” (1982). Report No. C‐6, Business Roundtable (BRT), New York, N.Y.
2.
Ahuja, H. N., and Nadakumar, V. (1985). “Simulation model to forecast project completion time.” J. Constr. Engrg. Mgmt., ASCE, 111(4), 325–342.
3.
Borcherding, J. D., and Garner, D. F. (1981). “Workforce motivation and productivity on large jobs.” J. Constr. Div., ASCE, 107(3), 443–453.
4.
Broomfield, J. R., Price, A. D., and Harris, F. C. (1984). “Production analysis applied to work improvement.” Proc., Inst. Civ. Engrs., 44(2), 379–386.
5.
Clapp, M. A. (1966). “The effect of adverse weather conditions on productivity on five building sites.” Constr. Series Current Paper No. 21, Building Research Establishment, Watford, England, 171–180.
6.
“Construction productivity measurement.” (1982). Report No. A‐1, Business Roundtable (BRT), New York, N.Y.
7.
Daytner, A. D., and Thomas, H. R. (1985). “An analysis of the interaction between the effect of learning and efficiency losses caused by weather.” Constr. Mgmt. Res. Series Report No. 21, Pennsylvania State Univ., University Park, Pa.
8.
“Effect of repetition on building operations and processes on site.” (1965). United Nations (U.N.) Publication No. ST/ECE/HOU/14, United Nations Committee on Housing, Building, and Planning, New York, N.Y.
9.
“The effect of temperature on productivity.” (1974). National Electrical Contractors Association (NECA), Washington, D.C.
10.
Grimm, C. T., and Wagner, N. K. (1974). “Weather effects on mason productivity.” J. Constr. Div., ASCE, 100(3), 319–335.
11.
Handa, V. K., and Rivers, D. (1983). “Downgrading construction incidents.” J. Constr. Engrg. Mgmt., ASCE, 109(2), 190–205.
12.
Helander, M., ed. (1981). Human factors/ergonomics for building and construction. John Wiley & Sons, New York, N.Y.
13.
Horner, R. M., and Whitehead, R. C. (1984). “Factors affecting labour productivity on construction sites.” Final Report, submitted to Science and Engineering Research Council, London, England.
14.
Koehn, E., and Brown, G. (1985). “Climatic effects on construction.” J. Constr. Engrg. Mgmt., ASCE, 111(2), 129–137.
15.
Kossoris, M. (1944). “Studies of the effects of long working hours.” Bureau of Labor Statistics Bull. 791 and 791A, Government Printing Office, Washington, D.C.
16.
Lewis, W. O., Curran, T. P., and Borcherding, J. D. (1985). “The effect of scheduled overtime on construction craft performance.” Summary Report, Productivity Measurement Committee, Construction Industry Institute, Austin, Tex.
17.
Logcher, R. D., and Collins, W. C. (1978). “Management impacts on labor productivity.” J. Constr. Div., ASCE 104(4), 447–461.
18.
McLeish, D. C. A. (1981). “Manhours and interruptions in traditional house building.” Bldg. and Environ., 16(1), 59–67.
19.
Mogren, E. T., and Borcherding, J. D. (1984). “Pilot study: The effect of scheduled overtime and shift schedule on construction craft productivity.” Summary Report, Construction Industry Institute, Austin, Tex.
20.
“More construction for the money. Summary report of the construction industry cost effectiveness project.” (1983). Business Roundtable (BRT), New York, N.Y.
21.
Neter, J., Wassermann, W., and Kutner, M. H. (1985). Applied linear regression models. 2nd Ed., Richard D. Irwin, Inc., Homewood, Ill., 60–182.
22.
O'Connor, L. V. (1969). “Overcoming the problems of scheduling on large central stations boilers.” Proc., Amer. Power Conf., 31, 518–528.
23.
O'Connor, J. T. (1985). “Impacts of constructability improvement.” J. Constr. Engrg. Mgmt., ASCE, 111(4), 404–410.
24.
“Overtime and productivity in electrical construction” (1969). National Electrical Contractors Association (NECA), Washington, D.C.
25.
Parviz, F. (1980). “Analysis of working space congestion from scheduling data.” Trans., Amer. Assoc. of Cost Engrs., F‐41, 24th Annual Meeting, Washington, D.C.
26.
The Richardson rapid construction cost estimating system. (1985). Richardson Engrg. Svces., Inc., San Marcos, Calif.
27.
“Scheduled overtime effect on construction projects” (1980). Report No. C‐2. Business Roundtable (BRT) New York, N.Y.
28.
Tatum, C. B. (1985). “Evaluating construction progress.” Proj. Mgmt. J., 16(3), 52–57.
29.
Thomas, H. R., and Mathews, C. T. “Methods of productivity measurement.” Report, Construction Industry Institute, Austin, Tex.
30.
Thomas, H. R., Mathews, C. T., and Ward, J. G. (1986). “Learning curve models of construction productivity.” J. Constr. Engrg. Mgmt., ASCE, 112(2), 245–258.
31.
Verschuren, C. P. (1984). “Effect of repetition on the programming and design of buildings.” Proc., 4th Int. Symp. Organiz. Mgmt. Constr., 2; International Council for Building Research Studies and Documentation, Rotterdam, Netherlands, 651–661.
32.
Waldron, A. J. (1968). Applied principles of project planning and control. 2nd Ed., Haddonfield, N.J.
33.
Ward, J. G., and Thomas, H. R. (1984). “A validation of learning curve models available to the construction industry.” Constr. Mgmt. Res. Series Report No. 20, Pennsylvania State Univ., University Park, Pa.
34.
Wong, S. M. (1987). “Development of a standardized procedure for the collection of construction site productivity data.” thesis presented to The Pennsylvania State Univ., at University Park, Pa., in partial fulfillment of the requirements for the degree of Master of Engineering.
35.
Yiakoumis, I. P. (1986). “Development of statistical procedures for analyzing the interaction of factors affecting construction productivity.” thesis presented to The Pennsylvania State Univ., at University Park, Pa., in partial fulfillment of the requirements for the degree of Master of Science.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 113Issue 4December 1987
Pages: 623 - 639

History

Published online: Dec 1, 1987
Published in print: Dec 1987

Permissions

Request permissions for this article.

Authors

Affiliations

H. Randolph Thomas, Member, ASCE
Prof., Dept. of Civ. Engrg., Pennsylvania Transp. Inst., Pennsylvania State Univ., Res. Bldg: B, University Park, PA 16802
Iacovos Yiakoumis
Grad. Student, Dept. of Civ. Engrg., Pennsylvania Transp. Inst., Pennsylvania State Univ., University Park, PA 16802

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share