Model for Retiring, Replacing, or Reassigning construction equipment
Publication: Journal of Construction Engineering and Management
Volume 113, Issue 1
Abstract
Retirement and replacement models for construction equipment have been based on the notion that there is an optimum time to sell a piece of equipment to the competition. One problem with these models is that they do not explain why one's competition may have a need for the equipment when one does not. The model presented here looks at the consequential costs of downtime for each piece of equipment when assigned to specific applications. Old and unreliable equipment therefore carries a significant consequential downtime cost when used in a key production application. Likewise, new and reliable equipment carries a significant capital recovery cost, which makes it less desirable in applications where consequential costs of downtime are low. This model provides a methodology to assign equipment optimally and to identify equipment for which its owner typically has no good applications.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Caterpillar Tractor Company. (1969). Equipment economics. Market Development Div., Caterpillar Tractor Co., Peoria, Ill.
2.
Cox, E. A. (1971). “Equipment economics.” Handbook of heavy construction, 2nd ed., J. A. Havers and F. W. Stubbs, Jr., Eds., McGraw‐Hill, New York, N.Y., 7–15.
3.
Douglas, J. (1975). Construction equipment policy. McGraw‐Hill, New York, N.Y., 58.
4.
Douglas, J. (1978). “Equipment costs by current methods.” J. Constr. Div., ASCEASCEASCEASCE, 104(CO2), 191–205.
5.
Nunally, S. W. (1977). Managing construction equipment. Prentice‐Hall, Englewood Cliffs, N. J.
6.
Preinreich, G. A. D. (1940). “The economic life of industrial equipment.” Econometrica, 8(1), 39.
7.
Taylor, J. S. (1923). “A statistical theory of depreciation based on unit costs.” J. Am. Stat. Assoc., 18 (New Series) (114), 1013.
8.
Terborgh, G. (1949). Dynamic equipment policy, 6th ed. Machinery and Allied Products Inst. (MAPI) and Council for Tech. Advncmt., Washington, D.C., 2.
9.
van Duzer, W. A. (1930). “When should equipment be replaced?” Construction methods, Jan., 62 ff.
10.
Vorster, M. C. (1978). “Equipment management logistics.” Proc. CIB W‐65 2nd Symp. on Org. and Mngmt. in Constr., Haifa, Israel, 3(PIV‐127).
Information & Authors
Information
Published In
Copyright
Copyright © 1987 ASCE.
History
Published online: Mar 1, 1987
Published in print: Mar 1987
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.