SERC—A Model for Estimating Construction Inputs
Publication: Journal of Construction Engineering and Management
Volume 112, Issue 3
Abstract
One of the main problems in the process of design and management of construction projects is obtaining accurate information for preliminary estimates. This information is crucial for the development of integrated systems for construction management because of the relationship between construction input data and subjects such as estimating, cost control, scheduling, resource management, etc. Existing methods for estimating input that originated in industrial engineering are inadequate for the unique conditions of the construction industry. The model described in this paper applies statistical analysis of data from past projects, and enables the user to estimate the data needed for the construction of a new project. The model is based on the following components: Project items and their quantities; inputs needed to produce those items; and factors that affect inputs of a specific project. The model equation was calculated using multiple regression techniques. The paper concludes with a case study of a construction input configuration for a concrete structure.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Barrie, D. S., and Paulson, P. C., “Professional Construction Management,” 2nd ed., McGraw‐Hill, New York, N.Y., 1984.
2.
Biryerson, B., “CBC/BDC as a National System,” RIBA Journal, Vol. 7, No. 9, Sept., 1967.
3.
BMB Biomedical Computer Programs, University of California Press, 1973.
4.
Cattle, Jr., Factor Analysis, Harper Publishers, New York, N.Y., 1952.
5.
Crow, E. L., Davis, F. A., Maxfield, M. W., Statistics Manual, Dover Publication, 1979.
6.
Herbsman, Z., “Long Range Forecasting Highway Construction Cost,” Journal of Construction Division, ASCE, Vol. 109, No. 4, Dec., 1983, pp. 423–434.
7.
Herbsman, Z., “INES—An Interactive Estimating System,” Journal of the Construction Division, ASCE, Vol. 110, No. 1, Mar., 1984, pp. 19–33.
8.
Herbsman, Z., “Developing of a Mathematical Model for Estimating and Updating of Construction Inputs,” thesis presented to Technion, at Haifa, Israel, in 1977, in partial fulfillment of the requirements for the degree of Doctor of Science.
9.
Horst, P., “Factor Analysis of Data Matrix,” Holt Rienhart and Winston, New York, N.Y., 1965.
10.
Library of Items for Building Works, “Committee for Standardization and Computerization of Contract Documents for Construction,” Israel, 1974.
11.
Monk, J., and Dunstone, K., “Standard Library of Description of Building Works,” The Estate Gazette Ltd., London, England, 1966.
12.
Moroney, N. G., Facts from Figures, Penguim Publication, 1956.
13.
Nie, N. H., et al., Statistical Packages for Social Science, McGraw‐Hill, New York, N.Y., 1977.
14.
Sall, J., SAS Regression Application, by SAS Institute Inc., Raleigh, N.C., 1978.
15.
Schlick, H., “Project Integrated Management System—PRIM,” Journal of the Construction Division, ASCE, Vol. 107, No. CO2, pp. 361–372.
16.
Snedecor, G. W., Statistical Method, 5th ed., Iowa State University Press, Amer, Iowa, 1959.
17.
The BSAB System, The Swedish Building Co‐ordination Center 1792, Stockholm, Sweden.
Information & Authors
Information
Published In
Copyright
Copyright © 1986 ASCE.
History
Published online: Sep 1, 1986
Published in print: Sep 1986
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.