Publication: Journal of Construction Engineering and Management
Volume 112, Issue 1
Abstract
One of the crucial problems that faces designers, construction managers, general contractors, and subcontractors is creating the most appealing facade of a building at the most cost‐effective price, while satisfying an owner's goal of exploiting the enclosed space to maximum advantage. A brick facade has long been considered a durable and aesthetic solution for the exterior walls. A stud wall with gypsum board sheathing is today's most economical and widely used interior perimeter material. The development of innovative construction techniques that combine this exterior facade with interior perimeter materials in the most cost‐effective and time‐effective manner is the object of continuing trial and error. The industrialization of construction components has long been considered but, as yet, is not widely used, although its future appears bright. This paper analyzes the advantages of a semi‐prefabricated facade based on specific experience.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
“Brick Veneer Existing Construction,” Technical Notes on Brick Construction, Brick Institute of America, 28A, Sept./Oct., 1978.
2.
“Brick Veneer New Constructions,” Technical Notes on Brick Construction, Brick Institute of America, 28 Revised, July/Aug., 1978.
3.
“Brick Veneer Panel and Curtain Walls,” Technical Notes on Brick Construction, Brick Institute of America, 28B, Feb., 1980.
4.
Carper, J., “Steel Stud/Brick Veneer Wall Passes Test,” Professional Builder, Vol. 47, Sept., 1982.
5.
“Clemson Tests Verify Curtain Wall Reliability,” U.S. Gypsum Co., Form & Function Technical Feature FF82‐3A, 1982.
6.
Marchello, M. J., “Metal Stud Curtain Wall Design Stands Up to NCMA Tests,” Form & Function Technical Feature, FF82‐2A (U.S.G.).
7.
“New Shape CWS Curtain Wall Stud,” United States Gypsum Co., CS‐107 USG, Aug., 1981.
8.
“Prefab Wall Bears Own Weight to Lighten Construction Costs,” E.N.R., B.1, 8.9, Feb. 1, 1979.
9.
Schlick, H., “Schedule and Resources of Fast Track Renovation Work,” Journal of the Construction Engineering Division, ASCE, Vol. 107, No. CO4, Dec., 1981.
10.
Schlick, H., “Temporary Heating in Construction Contracts,” Journal of Construction Engineering and Management, ASCE, Vol. 109, No. CO4, Dec., 1983.
11.
“The Story Pole,” Masonry/Metal Stud Wall Systems, Vol. 14, No. 2, Apr., 1983.
Information & Authors
Information
Published In
Copyright
Copyright © 1986 ASCE.
History
Published online: Mar 1, 1986
Published in print: Mar 1986
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.