Criticism of CPM for Project Planning Analysis
Publication: Journal of Construction Engineering and Management
Volume 110, Issue 2
Abstract
Published criticism in recent years concerning the inadequacy of Critical Path Method (CPM) as a project planning tool is identified and grouped under six major headings with reference to the publications in which the criticism were contained. These are answered from the writer's field experience and from experiences published by other authors. The object of the analysis is to see whether or not CPM as a project planning tool can meet the required functions of planning in construction, including consideration of legal and contractual framework and the complex and interdisciplinary nature of the project environment. The analysis reveals that, despite numerous criticism, project and construction planning should be done using CPM scheduling. Main factors affecting successful planning are realistic estimation of the productivity of crews in the context of expected job‐management efficiency conditions, and inclusion of sufficient time buffers between dissimilar trades. CPM is found to be equally useful as a planning tool for linear or repetitive projects. The limitations of this technique are identified in terms of the defined planning functions in the engineering phase of capital projects. A broad model for management of the engineering phase in revenue‐generating projects is suggested.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Arditi, D., “Diffusion of Network Planning in Construction,” Journal of Construction Engineering and Management, ASCE, Vol. 109, No. CO1, Mar., 1983, p. 3.
2.
Barnes, N. M. L., “Cost Modelling—An Integrated Approach to Planning and Cost Control,” Engineering and Process Economics 2, Elsvier Scientific Publication Company, New York, N.Y., 1977.
3.
Birrell, G. S., “Construction Planning‐Beyond the Critical Path,” Journal of the Construction Division, ASCE, Vol. 106, No. CO3, Sept., 1980.
4.
Burgmann, J. B., “Fast‐Track and Structural Design of Westmead Hospital,” Civil Engineering Transactions, The Institution of Engineers, Australia, 1982, p. 114.
5.
Davis, E. W., “CPM Use in Top 400 Construction Firms,” Journal of the Construction Division, ASCE, Vol. 100, No. CO1, Mar., 1974, p. 47.
6.
Dressler, J., “Construction Management in West Germany,” Journal of the Construction Division, ASCE, Vol. 106, No. CO4, Dec., 1980.
7.
Edwards, J. T., Coulson, C. R., and Chaning Pearce, R. A., “System Planning and Multi‐Contract Procedures, Hong Kong Mass Transit Railway, Modified Initial System,” Proceedings, Institution of Civil Engineers, Part 1, Nov., 1980.
8.
Galloway, P., and Nielsen, K., “Schedule Control for PCM Projects,” Journal of the Construction Division, ASCE, Vol. 107, No. CO2, June, 1981, p. 331.
9.
Gilbert, G. P., “The Project Environment,” International Journal of Project Management, Vol. 1, No. 2, May, 1983, p. 83.
10.
Gough‐Palmer, D. H., “Integration of Time and Cost in the Planning and Monitoring of the Hong Kong Mass Transit Railway Project,” International Journal of Project Management, Vol. 1, No. 2, May, 1983, pp. 95–100.
11.
Gray, J. B., “Selection and Engagement of an Engineer/Constructor to Effect the Development of a Large Scale Capital Development Project,” Proceedings Conference on Engineering Management, Institute of Engineers, Brisbane, Australia, July 6–7, 1983.
12.
Harries, T. W., and Trimble, E. G., “Factors which Affect Success in Net–work Applications,” PC8, Project Control Selected Reading, University of Technology, Loughborough, Leics.
13.
Hessarak Residential University, Karadj, Iran, 1978–80; the project comprised a number of academic buildings, laboratories, library, student union, student and staff residential quarters, general administration and services scattered around a 200 hectare site (final project cost ).
14.
Johnston, D. W., “Linear Scheduling Method for Highway Construction,” Journal of the Construction Division, ASCE, Vol. 107, No. CO2, June, 1981.
15.
Koontz, H., O'Donnell, C., and Weihrich, H., Management, 7th ed., McGraw‐Hill, New York, N.Y., 1980, pp. 170–171.
16.
Lilley, B. C., “Project Implementation/Cost Control and Scheduling: ICI Approach,” Lecture Notes presented at the Symposium on Project Economics and Project Management at the Department of Chemical Engineering, University of Sydney, May 24–26, 1983.
17.
McIntosh, D. F., et al., “Design and Construction of Underground Stations and Cut‐and‐Cover Tunnels, Hong Kong Mass Transit Railway, Modified Initial System,” Proceedings, Institution of Civil Engineers, Part 1, Nov., 1980.
18.
Melin, J. W., and Whiteaker, B., “Fencing a Bar Chart,” Journal of the Construction Division, ASCE, Vol. 107, No. CO3, Sept., 1981, p. 498.
19.
Peer, S., “Network Analysis and Construction Planning,” Journal of the Construction Division, ASCE, Vol. 100, No. CO3, Sept., 1974.
20.
Perry, J. G., Shuttleworth, R., and Thompson, P. A., “Cost Modelling in Theory and Practice,” Fifth INTERNET Congress, Birmingham, 3, 240, 1976.
21.
Pilcher, R., and Oxley, R., “Optimising Productivity and Cost in Repetitive Construction,” CIRIA Report No. 73, London, May, 1976.
22.
Popescu, C., “Pitfalls of GSA‐CMCS Software,” Journal of the Construction Division, ASCE, Vol. 105, No. CO1, Mar., 1979, pp. 105–106.
23.
Sublinger, S., “Construction Pianning for Linear Projects,” Journal of the Construction Division, ASCE, Vol. 106, No. CO2, June, 1980, p. 196.
24.
Stradal, O., and Cacha, J., “Time Space Scheduling Method,” Journal of the Construction Division, ASCE, Vol. 108, No. CO3, Sept., 1982.
25.
Thompson, P. A., Organisation and Economics of Construction, Chapter 11, McGraw‐Hill Book Co., U.K., 1981.
Information & Authors
Information
Published In
Copyright
Copyright © 1984 ASCE.
History
Published online: Mar 1, 1984
Published in print: Mar 1984
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.