The Bidding Game
Publication: Journal of Construction Engineering and Management
Volume 110, Issue 2
Abstract
Published bidding models have traditionally been approached from the point of view of the bidder or contractor. This paper deals with the analysis of more than 5,000 tenders comprising approximately 34,000 bids which were received by the specifiers. It was found that similar recognizable statistical frequency distributions existed in three different countries. It is therefore postulated that there exists a typical behavior pattern which can be represented by this frequency distribution. It was also postulated that the coefficient of variation of a tender is indicative of the risks which the bidders perceived. The means of the frequency distributions of the coefficients of variation also appear to be independent of the country, the type of construction industry, the economic climate, or time.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Benjamin, Neal B. H., and Meador, Richard C., “Comparison of Friedman and Gates' Competitive Bidding Models,” Journal of the Construction Division, ASCE, Vol. 105, No. CO1, Mar., 1979, pp. 25–40.
2.
Benjamin, Neal B. H., “Competitive Bidding: The Probability of Winning,” Journal of the Construction Division, ASCE, Vol. 98, No. CO2, Sept., 1972, pp. 313–330.
3.
Carr, Robert I., “Paying the Price for Construction Risk,” Journal of the Construction Division, ASCE, Vol. 103, No. CO1, Mar., 1977, pp. 153–161.
4.
De Neufville, Richard, Hani, Elias N., and Lesage, Yves, “Bidding Models: Effect of Bidder's Risk Aversion,” Journal of the Construction Division, ASCE, Vol. 103, No. CO1, Mar., 1977, pp. 57–70.
5.
Dixie, John M., “Bidding Models—The Final Resolution of a Controversy,” Journal of the Construction Division, ASCE, Vol. 100, No. CO3, Sept., 1974, pp. 265–271.
6.
Fruest, Michael, “Theory for Competitive Bidding,” Journal of the Construction Division, ASCE, Vol. 103, No. CO1, Mar., 1977, pp. 139–152.
7.
Gates, Marvin, and Scarpa, Amerigo, “Reward‐Risk Ratio,” Journal of the Construction Division, ASCE, Vol. 100, No. CO4, Dec., 1974, pp. 521–532.
8.
Gates, Marvin, “Bidding Strategies and Probabilities,” Journal of the Construction Division, ASCE, Vol. 93, No. CO1, Mar., 1967, pp. 75–107.
9.
Gates, Marvin, “Bidding Contingencies and Probabilities,” Journal of the Construction Division, ASCE, Vol. 97, No. CO2, Nov., 1971, pp. 277–303.
10.
Gates, Marvin, “A Monte Carlo Experiment,” Journal of the Construction Division, ASCE, Vol. 102, No. CO4, Dec., 1976, pp. 669–680.
11.
Gates, Marvin, “Discussion on Paying the Price for Construction Risk,” Journal of the Construction Division, ASCE, Vol. 103, No. CO4, Dec., 1977, pp. 664–665.
12.
McIlleron, R. C., “The Extension of Progress Diagrams,” Proceedings, S.A. Soc. Civ. Eng., Vol. XXV, 1927, pp. 98–106.
13.
Miller, David W., and Starr, M. K., Executive Decisions and Operations Research, 2nd ed., Prentice Hall Inc., Englewood Cliffs, New Jersey, 1969.
14.
Shaffer, Louis R., and Micheau, Terry W., “Bidding with Competitive Strategy Models,” Journal of the Construction Division, ASCE, Vol. 97, No. CO1, Mar., 1971, pp. 113–126.
15.
Spooner, James E., “Probabilistic Estimating,” Journal of the Construction Division, ASCE, Vol. 100, No. CO1, Mar., 1974, pp. 65–77.
16.
Stark, Robert M., “Unbalanced Bidding Models—Theory,” Journal of the Construction Division, ASCE, Vol. 94, No. CO2, Oct., 1968, pp. 197–209.
17.
“How Contractors Organize their Cost Estimating and Cost Control,” by the Subcommittee on Organization of Estimating Department, Committee on Estimating and Cost Control, Journal of the Construction Division, ASCE, Vol. 92, No. CO1, Jan., 1966, pp. 53–73.
18.
Sugrue, Paul, “An Optimum Bid Approximation Model,” Journal of the Construction Division, ASCE, Vol. 106, No. CO4, Dec., 1980, pp. 499–505.
19.
“Tender Prices—Tender P.T. 6481,” Construction in Southern Africa, Vol. 26, No. 8, Nov., 1981, p. 141.
20.
“Tender Prices—S.A.R. Culvert,” Construction in Southern Africa, Vol. 6, No. 7, Oct., 1981.
21.
Van der Meulen, G. J. R., “If You Think Modern Paints are Costly: Why Waste Them?,” Corrosion and Coatings South Africa, Vol. 4, No. 5, Oct., 1977, pp. 21–25.
22.
Vorster, M. C., “A Pragmatic Bidding Model or Follow the Leader,” The Civil Engineering Contractor, Vol. 12, No. 9, June, 1978, pp. 28–30.
23.
Wade, Richard L., and Harris, Robert B., “LOMARK: A Bidding Strategy,” Journal of the Construction Division, ASCE, Vol. 102, No. CO1, Mar., 1976, pp. 197–211.
24.
Weston, Fred J., and Brigham, Eugene F., Managerial Finance, Holt, Rinehart and Winston, New York, N.Y., 1979, pp. 251–254.
25.
Willembrock, Jack H., “Utility Function Determination for Bidding Models,” Journal of the Construction Division, ASCE, Vol. 99, No. CO1, July, 1973, pp. 133–153.
Information & Authors
Information
Published In
Copyright
Copyright © 1984 ASCE.
History
Published online: Mar 1, 1984
Published in print: Mar 1984
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.