Accident-Oriented Delay Propagation in High-Speed Railway Network
Publication: Journal of Transportation Engineering, Part A: Systems
Volume 146, Issue 4
Abstract
This paper presents an approach to estimate the delay propagation in a high-speed railway (HSR) network under accident conditions. Considering the complexity and dynamics of HSR accidents, different levels of delay are discussed using clustering analysis, and the delay propagation is analyzed both forward and backward using different mathematical formulations. The forward delay propagation is described by a fitting distribution between arrival delay and forward resistance of accidents at different levels. The backward-delay-propagating mechanism is exploited by a combined model of horizontal propagation and vertical propagation under corresponding constraints of minimum headway and emergency measures. To integrate the forward- and the backward-propagating models, a global algorithmic framework is then designed with special consideration of routes separation. Finally, an applied case analysis of regional rail network in the Yangtze River Delta verifies the feasibility of the delay propagation algorithm. Through a validation test to accidents with detailed records, results suggest that the proposed algorithm can conservatively estimate the delay distribution with an accuracy greater than 75%.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code generated or used during the study are available from the corresponding author by request. The data available are listed as follows:
•
The original data of primary accident delay of 12 months (in Chinese);
•
The timetables of HSR lines in the research area (in pictures);
•
Detailed records of accident cause and corresponding emergency measures (in Chinese); and
•
The GIS files of the regional HSR network.
Acknowledgments
This work was supported by the National Key R&D Program of China under Grant No. 2018YFB1201403 “Research on Technologies of Improving Comprehensive Efficiency and Service Quality in Networked High-speed Railways.” We deeply thank Yongjian Zhang at China Railway Shanghai Bureau Group Co., Ltd. for his assistance in data collection.
References
Briggs, K., and C. Beck. 2007. “Modelling train delays with -exponential functions.” Physica A 378 (2): 498–504. https://doi.org/10.1016/j.physa.2006.11.084.
Büker, T., and B. Seybold. 2012. “Stochastic modelling of delay propagation in large networks.” J. Rail Transp. Plann. Manage. 2 (1–2): 34–50. https://doi.org/10.1016/j.jrtpm.2012.10.001.
Cadarso, L., and M. Ángel. 2012. “Integration of timetable planning and rolling stock in rapid transit networks.” Ann. Oper. Res. 199 (1): 113–135. https://doi.org/10.1007/s10479-011-0978-0.
Carey, M., and A. Kwieciński. 1994. “Stochastic approximation to the effects of headways on knock-on delays of trains.” Transp. Res. Part B Methodol. 28 (4): 251–267. https://doi.org/10.1016/0191-2615(94)90001-9.
Corman, F., A. D’Ariano, D. Pacciarelli, and M. Pranzo. 2012. “Bi-objective conflict detection and resolution in railway traffic management.” Transp. Res. Part C Emerg. Technol. 20 (1): 79–94. https://doi.org/10.1016/j.trc.2010.09.009.
Dorfman, M. J., and J. Medanic. 2004. “Scheduling trains on a railway network using a discrete event model of railway traffic.” Transp. Res. Part B Methodol. 38 (1): 81–98. https://doi.org/10.1016/S0191-2615(03)00006-7.
Goverde, R. M. P. 2007. “Railway timetable stability analysis using max-plus system theory.” Transp. Res. Part B Methodol. 41 (2): 179–201. https://doi.org/10.1016/j.trb.2006.02.003.
Goverde, R. M. P. 2010. “A delay propagation algorithm for large-scale railway traffic networks.” Transp. Res. Part C Emerg. Technol. 18 (3): 269–287. https://doi.org/10.1016/j.trc.2010.01.002.
Hasegawa, Y., H. Konya, and S. Shinohara. 1981. “Macro-model on propagation-disappearance process of train delays.” Railway Tech. Res. Inst. Q. Rep. 22 (2): 78–82.
Hu, S. J., Q. X. Sun, J. Y. Hu, and Z. X. Yang. 1994. “Research on theories of trains delay propagation in a railway district.” China Railway Sci. 15 (2): 41–54.
Kasalica, S., D. Mandić, and V. Vukadinović. 2013. “Locomotive assignment optimization including train delays.” Promet-Traffic Transp. 25 (5): 421–429. https://doi.org/10.7307/ptt.v25i5.1402.
Kersbergen, B., T. Boom, and B. D. Schutter. 2016. “Towards railway traffic management using switching Max-plus-linear systems.” Discrete Event Dyn. Syst. 26 (2): 183–223. https://doi.org/10.1007/s10626-014-0205-7.
Lee, W. H., L. H. Yen, and C. M. Chou. 2016. “A delay root cause discovery and timetable adjustment model for enhancing the punctuality of railway services.” Transp. Res. Part C Emerg. Technol. 73 (Dec): 49–64. https://doi.org/10.1016/j.trc.2016.10.009.
Li, X. J., B. M. Han, D. W. Li, and H. Li. 2013. “Method for high-speed train operation adjustment based on switching max-plus-linear system and ordinal optimization.” China Railway Sci. 34 (6): 124–130. https://doi.org/10.3969/j.issn.1001-4632.2013.06.21.
Louwerse, I., and D. Huisman. 2014. “Adjusting a railway timetable in case of partial or complete blockades.” Eur. J. Oper. Res. 235 (3): 583–593. https://doi.org/10.1016/j.ejor.2013.12.020.
Marković, N., S. Milinković, K. S. Tikhonov, and P. Schonfeld. 2015. “Analyzing passenger train arrival delays with support vector regression.” Transp. Res. Part C Emerg. Technol. 56 (Jul): 251–262. https://doi.org/10.1016/j.trc.2015.04.004.
Meester, L. E., and S. Muns. 2007. “Stochastic delay propagation in railway networks and phase-type distributions.” Transp. Res. Part B Methodol. 41 (2): 218–230. https://doi.org/10.1016/j.trb.2006.02.007.
Meng, L. Y., and R. M. P. Goverde. 2012. “A method for constructing train delay propagation process by mining train record data.” J. Beijing Jiaotong Univ. 36 (6): 15–20. https://doi.org/10.3969/j.issn.1673-0291.2012.06.003.
Umiliacchi, S., G. Nicholson, N. Zhao, F. Schmid, and C. Roberts. 2016. “Delay management and energy consumption minimisation on a single-track railway.” IET Intell. Transp. Syst. 10 (1): 50–57. https://doi.org/10.1049/iet-its.2015.0054.
Wang, P., and R. M. P. Goverde. 2017. “Multi-train trajectory optimization for energy efficiency and delay recovery on single-track railway lines.” Transp. Res. Part B Methodol. 105 (11): 340–361. https://doi.org/10.1016/j.trb.2017.09.012.
Zhang, H. R., L. M. Jia, L. Wang, and X. Y. Xu. 2019. “Energy consumption optimization of train operation for railway systems: Algorithm development and real-world case study.” J. Clean. Prod. 214 (Mar): 1024–1037. https://doi.org/10.1016/j.jclepro.2019.01.023.
Zhao, W., H. S. He, Z. C. Lin, and K. Q. Yang. 2006. “The study of properties of Chinese railway passenger transport network.” Acta Phys. Sin. 55 (8): 3906–3911. https://doi.org/10.3321/j.issn:1000-3290.2006.08.021.
Zhou, X., and M. Zhong. 2005. “Bicriteria train scheduling for high-speed passenger railroad planning applications.” Eur. J. Oper. Res. 167 (3): 752–771. https://doi.org/10.1016/j.ejor.2004.07.019.
Information & Authors
Information
Published In
Copyright
©2020 American Society of Civil Engineers.
History
Received: Jul 10, 2018
Accepted: Sep 10, 2019
Published online: Jan 23, 2020
Published in print: Apr 1, 2020
Discussion open until: Jun 23, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.